Loading...
HomeMy WebLinkAboutNC0020656_Meeting Notes_20130530e,[,noicoS. /I a csT" P}y Sorr n 9/0 -q& jrzz 910 -t33-33 CD w car CA -I S 6"id1 ewQ /u 15 C,s Toy v38• Sib 919-7o,7--91`75 76, r.fyg. 4cs anch, 401' ' LEITH CREEK .lFirl^a atigami e arms 1.3)Mir City of Laurinburg Project Schedule Sewer Service for FCC ID 1 Task Name Preliminary Work 2013 1 2014 2 Photogrammetry 3 Scope Coverage and Flight Planning 5 Aerial Photography Ground:Control Surveys 6 Photogrammetry 7 Aberdeen Rd P/S Improvements 8 Select Flow Monitoring Equipment 9 Flow Monitoring 10 11 Select and Order Diesel Pump -----------------------------------------------= Diesel Pump Installation 12 Existing Mechanical Equipment Repairs 13 14 15 Regulatory Briefs Initial Meeting with DWQ Initial Meeting with NCDOT 16 17 Contract 1.0 - Interim Improvements Design Phase 18 19 Existing SewerSurveys :Hydraulic Evaluation of Existing Sewer 20 Utility Locations and Surveys • 21 Design 22 23 Subsurface Investigation City Review and Approval to Bid 24 Property 25 26 27 28 29 30 31 32 Identify Pump Station Site Field Survey and Plat Preparation Site Acquisition 'and Regulatory Reviews Approvals Application Prep: (DWQ, NCDOT) City Review and Execution Agency:Reviews and Approvals 'Bidding and Award 33 34 35 Advertise.. Receive Bids and Brief City Council Canvass and Award Recommendation 36 City Award 37 Conform Contracts 38 Construction and Start-up 39 Preconstruction. Conference. 40 41 EQ Basin and Pipeline Construction Final Completion 42 43 44 Contracts 2.0 &3.0- Pump Station and Force Main Design Phase. Field Surveys .:. Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec f�) 45 Design 46 City Review and Approval to Bid 47 Property 50 51 52 53 54 55 Easement Acquisition Regulatory Reviews and Approvals Application Prep. (DWQ, NCDOT) City Review and Execution Agency Reviews and Approvals Bidding and Award 56 57 58 59 60 6.1 62 Advertise Receive Bids Canvass and Award Recommendation City Award Conform Contracts Construction and Start-up Construction 63.: 64 65 66 67 68 69 70 71 72.. Testing and Commissioning ;Final Completion Contracts 4.0 - Leith Creek Parallel Sewer Design Phase..' Field Surveys Design City Review Property ... Identify Easements Field Survey and Plat Preparation 73 74 75 76 77 Easement Acquisition Regulatory Reviews and Approvals Environmental Documents Approval of Documents Application Prep. (DWQ, NCDOT) 78 79 80 81 82 83 84 City Review and Execution Agency Reviews and Approvals Bidding and Award. Advertise Receive Bids Canvass and Award Recommendation City Award 85 Conform Contracts 86 :.87 88 Construction; and Start-up -- --. Construction --------- -- ------------------ ------------ --- -------------------------- Final Completion Willis Engineers • Wed 5/29/13 \ EQUALIZATION BASIN �\ AND TEMPORARY �' % PUMP STATION 7 - \ 12" FORCE MAIN SO_2.,— FUTURE FORCE MAIN (CONTRACT 3.0) - 5 A0' s 18" SEWER FROM FCC FUTURE PUMP STATION (CONTRACT 2.0) 4" FORCE MAIN CONTRACT 1.0 City of Laurinburg Project Summary US 401 Industrial Park Sewer Service The City of Laurinburg plans to provide water and sewer service for an industry to be located in the new industrial park on US 401 Bypass at Heck Norton Road. The facility would utilize untreated groundwater for process water and fire protection, and City of Laurinburg potable water for domestic purposes. Both would be discharged to the Laurinburg sewer system for treatment and disposal. The new industry has established an aggressive implementation schedule and requires partial service in early 2014, with additional capacity available later in the year. Even with an expedited schedule, it is unlikely these facilities could be completed by early 2014. It is therefore necessary to provide facilities in several phases. Initial sewer service should be capable of handling 200,000 gallons per day (gpd) discharged in a single 8-hour shift. After expansion of the facilities, the total wastewater flow is expected to be as much as 1.8 million gallons per day (MGD), discharged uniformly over a 5-day workweek. Aberdeen Rd P/S Improvements Estimated cost Scope of work Contract 1.0 — Interim Facilities Estimated cost Requested service date Scope of work Contract 2.0 - Pumping Station Estimated cost Requested service date Scope of work Contract 3.0 — Force Main Estimated cost Requested service date Scope of work Contract 4.0 - Outfall Estimated cost Requested service date Scope of work $65,000 Back-up pump Additional controls and flow monitoring $900,000 Feb 2014 2,500 If 18-inch gravity sewer 200,000 gal equalization tank 250 gpm controlled rate pumping system 2,000 If 4-inch interconnection piping $1,700,000 July 2014 1,500 gpm triplex pumping station $900,000 July 2014 — 1.2 MGD service 9,000 If 12-inch force main $1,700,000 Dec 2014 8,500 If 18 & 24-inch outfall Total Estimated Project Cost $5,265,000 Willis Engineers May 2013