City of Laurinburg Project Schedule
Sewer Service for FCC
ID
1
Task Name
Preliminary Work
2013 1 2014
2
Photogrammetry
3
Scope Coverage and Flight Planning
5
Aerial Photography
Ground:Control Surveys
6
Photogrammetry
7
Aberdeen Rd P/S Improvements
8
Select Flow Monitoring Equipment
9
Flow Monitoring
10
11
Select and Order Diesel Pump
-----------------------------------------------=
Diesel Pump Installation
12
Existing Mechanical Equipment Repairs
13
14
15
Regulatory Briefs
Initial Meeting with DWQ
Initial Meeting with NCDOT
16
17
Contract 1.0 - Interim Improvements
Design Phase
18
19
Existing SewerSurveys
:Hydraulic Evaluation of Existing Sewer
20
Utility Locations and Surveys •
21
Design
22
23
Subsurface Investigation
City Review and Approval to Bid
24
Property
25
26
27
28
29
30
31
32
Identify Pump Station Site
Field Survey and Plat Preparation
Site Acquisition 'and
Regulatory Reviews Approvals
Application Prep: (DWQ, NCDOT)
City Review and Execution
Agency:Reviews and Approvals
'Bidding and Award
33
34
35
Advertise..
Receive Bids and Brief City Council
Canvass and Award Recommendation
36
City Award
37
Conform Contracts
38
Construction and Start-up
39
Preconstruction. Conference.
40
41
EQ Basin and Pipeline Construction
Final Completion
42
43
44
Contracts 2.0 &3.0- Pump Station and Force Main
Design Phase.
Field Surveys .:.
Mar Apr
May
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
f�)
45
Design
46
City Review and Approval to Bid
47
Property
50
51
52
53
54
55
Easement Acquisition
Regulatory Reviews and Approvals
Application Prep. (DWQ, NCDOT)
City Review and Execution
Agency Reviews and Approvals
Bidding and Award
56
57
58
59
60
6.1
62
Advertise
Receive Bids
Canvass and Award Recommendation
City Award
Conform Contracts
Construction and Start-up
Construction
63.:
64
65
66
67
68
69
70
71
72..
Testing and Commissioning
;Final Completion
Contracts 4.0 - Leith Creek Parallel Sewer
Design Phase..'
Field Surveys
Design
City Review
Property ...
Identify Easements
Field Survey and Plat Preparation
73
74
75
76
77
Easement Acquisition
Regulatory Reviews and Approvals
Environmental Documents
Approval of Documents
Application Prep. (DWQ, NCDOT)
78
79
80
81
82
83
84
City Review and Execution
Agency Reviews and Approvals
Bidding and Award.
Advertise
Receive Bids
Canvass and Award Recommendation
City Award
85
Conform Contracts
86
:.87
88
Construction; and Start-up
-- --. Construction --------- -- ------------------
------------ --- --------------------------
Final Completion
Willis Engineers
• Wed 5/29/13
\ EQUALIZATION BASIN
�\ AND TEMPORARY �'
% PUMP STATION
7
-
\ 12" FORCE MAIN
SO_2.,—
FUTURE FORCE MAIN
(CONTRACT 3.0)
-
5 A0'
s
18" SEWER
FROM FCC
FUTURE PUMP
STATION
(CONTRACT 2.0)
4" FORCE MAIN
CONTRACT 1.0
City of Laurinburg Project Summary
US 401 Industrial Park Sewer Service
The City of Laurinburg plans to provide water and sewer service for an industry to be located
in the new industrial park on US 401 Bypass at Heck Norton Road. The facility would utilize
untreated groundwater for process water and fire protection, and City of Laurinburg potable
water for domestic purposes. Both would be discharged to the Laurinburg sewer system for
treatment and disposal. The new industry has established an aggressive implementation
schedule and requires partial service in early 2014, with additional capacity available later in
the year. Even with an expedited schedule, it is unlikely these facilities could be completed
by early 2014. It is therefore necessary to provide facilities in several phases.
Initial sewer service should be capable of handling 200,000 gallons per day (gpd) discharged
in a single 8-hour shift. After expansion of the facilities, the total wastewater flow is expected
to be as much as 1.8 million gallons per day (MGD), discharged uniformly over a 5-day
workweek.
Aberdeen Rd P/S Improvements
Estimated cost
Scope of work
Contract 1.0 — Interim Facilities
Estimated cost
Requested service date
Scope of work
Contract 2.0 - Pumping Station
Estimated cost
Requested service date
Scope of work
Contract 3.0 — Force Main
Estimated cost
Requested service date
Scope of work
Contract 4.0 - Outfall
Estimated cost
Requested service date
Scope of work
$65,000
Back-up pump
Additional controls and flow monitoring
$900,000
Feb 2014
2,500 If 18-inch gravity sewer
200,000 gal equalization tank
250 gpm controlled rate pumping system
2,000 If 4-inch interconnection piping
$1,700,000
July 2014
1,500 gpm triplex pumping station
$900,000
July 2014 — 1.2 MGD service
9,000 If 12-inch force main
$1,700,000
Dec 2014
8,500 If 18 & 24-inch outfall
Total Estimated Project Cost $5,265,000
Willis Engineers May 2013