HomeMy WebLinkAboutNCC203945_Notice of Termination_20210920Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 9/20/2021 1:01:15 PM (NOT Submittal)
Approve by Morman, Alaina 9/24/2021 4:27:25 PM (NOT Request Review- NCC203945)
• The task was assigned to Morman, Alaina. The due date is: September 23, 2021 5:00 PM
9/20/2021 1:01 PM
1 �
NORTH CAROLINA
Enrlronmenral Quallly
Certificate of NCC203945
Coverage (COC) Enter the Certificate of Coverage Nmber
No.*
2020 Annual Fee Status
2021 Annual Fee Status OPEN
K/hy be blank (if not yet billed).
Information associated with this permit:
Project Name
1140 Ft Bragg Rd
Address
1140 Fort Bragg Rd, Southern Pines, NC
County
Moore
Latitude
35.1466
Longitude
-79.3823
Permittee Listed
Ascot Corporation, LLC
Legally Responsible
Colin Webster
Individual
NC Reference No.
NCG01-2020-3945
E&SC Plan ID
20-3575
Original NOI
31065
Tracking No.
Date COC Issued
9/9/2020
Prior Rescission
Cate populates only if COCwas already rescinded at time of submittal.
Date
Reason for Rescission/Termination Request:
Reason for
r Project Closed -Out
Termination of
r Sale (Another Owner/Operator obtained a new COC)
Coverage *
r Mistake or Invalid Coverage
r Other
Additional IVbre information about the basis of this request, if needed.
Explanation
Supporting Upload Supporting Documentation if applicable.
Documentation MstbeRYforrrat
Project Close-out Information:
Final Close-out 9/14/2021
Inspection Approval
Project Close-out 1140 Ft Bragg Rd-NCC203945 NCG01 Close Out
Approval Doc.pdf 175.1 KB
Documentation
Mast be FDFforrrat
North Carolina General Statute 143-215.66 (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
rJ I, as an authorized representative, hereby request rescission of coverage under
the NPDES Stormwater Permit for the subject facility. I am familiar with the
information contained in this request and to the best of my knowledge and
belief such information is true, complete and accurate.
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
Type Name* Colin Webster
Title * Manager
Organization* Ascot Corporation, LLC
Date * 09/20/2021
Email for charley@ascotgrp.com
Confirmation *
Contact Telephone* 9106887361
NOT Certification 1140 Ft Bragg Rd NOT Signed Form.pdf 460.19KB
Form Mast be PDF Forrrst
Is this COC Already Ensure this CCChas not been rescinded since subrrittal!
Rescinded?
Additional Email
(Optional)
Original Permittee
Email
CCd on Notification Errails
charley@ascotgrp.com
CCd on Notification Erails
colin@ascotgrp.com
Original Site Contact CCd on Notificaiton Errails
Email charley@ascotgrp.com