September 20, 2021
NC DEQ/Water Quality Regional Operations Section
Washington Regional Office
943 Washington Square Mall
Washington, NC 27889
Dear Mr. May:
—i -erge
Town Clerk/Finance Officer/Notary
Aid Saitemair
Utility Billing/Tax Collector/Notary
ditixley
Utilities Superintendent
guest
RECEIVED/NCDENR/DWR DMV/Notary
SEP 2 4 2021
Water Quality
Regional Operations Section
Washington Regional Office
Subject: Sewer Line Moratorium
Town of Hookerton WWTP
NC0025712
Greene County
We are in receipt of your Imposition of Sewer Line Moratorium dated September 7, 2021. Your
letter correctly states that average flow for calendar year 2020 was 0.069 mgd and the permitted
flow is 0.06 mgd. We reviewed the flow data for 2020 and the flow for 10 of the 12 months never
exceeded more than 60% of the permitted flow. Only two months exceeded the permitted flow
limit and they were both grossly over the limit. As has been evident in recent NOVs, the WWTP
is subject to flooding conditions which can cause false high flow readings. We believe this is what
has happened during the months of June 2020 and November 2020 in which the flow exceeded the
permit limit. We think that the actual flow for calendar year is closer to 40% of the permitted flow.
Flow data for 2021 seems to support this percentage. So far in 2021, the flow has been averaging
approximately 45% of the permitted flow, with the exception of February 2021. Again, February
2021 was a wet month andTh WWTP did flood, contributing to -false high flow readings.
The Town has sealed the manholes between the flow meter and small holding pond. The holding
pond was also cleared of debris to allow the check valve to properly function to prevent possible
surcharging of the discharge line. We request that the Sewer Line Moratorium be rescinded to
allow the Town to continue to evaluate options for more accurate flow measurement. This may
include replacing the check valve on the discharge line, extending the discharge line out of the
holding pond and/or relocating or repositioning the flow meter.
P.O. Box 296 • Hookerton, NC 28538
(252) 747-3816 • FAX (252) 747-8131 • ahbaker@embargmail.com
www.hookertonnc.com
GT,i� 6.'61 ttrettaM is a cieleootemzi yfrir€ aaadea/dr/A
Since reviewing the data, we feel confident that the months showing high flows were a direct result
of surcharging the flow meter due to flooding events. We would not like to see the Town of
Hookerton penalized over these events. We will work to ensure that the flow meter is correctly
positioned to provide accurate flow data. We request additional time to evaluate these options and
still have the opportunity for the Town to experience growth.
We thank you for your consideration of the matter. If you have any questions or comments, please
contact Tyler Shirley, Public Works Director, at: 252/531-3780.
Sincerely,
,fW Z72
Robert E. Taylor, Mayor
Town of Hookerton-- -
Hookerton Wastewater Flow
January 2020 - July 2021
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
1
2
3
4
5
6
7 8 9 10 11 12 13
14
15
16
17
18
19