Loading...
HomeMy WebLinkAbout20210668 Ver 1_Meeting Request Review_20210920 DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnnienlrtl Qua fay ID#* 20210668 Version* 1 Regional Office* Asheville Regional Office-(828)296-4500 Reviewer List* Kevin Mitchell Pre-Filing Meeting Request submitted 9/20/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Kevin Barnett Contact Email Address* khbarnett@ncdot.gov Project Name* Polk Bridge 29 Project Owner* NC DOT Division of 14 Project County* Polk Owner Address: Street Address 253 Webster Rd Address Line 2 City State/Rovince/Region Sylva NC Fbstal/Zip Code Country 28779 US Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: I7 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Kevin Mitchell Please give a brief project description below and include location information.* This is a bridge replacement of an aged bridge on NC Hwy 9.There will be no permanent fill associated with this project.There will be 140 linear feet of dewatering for the temporary detour of traffic. Please attach the documentation you would like to have the meeting about. Polk County-B 29- Final Permit Plans.pdf 5.11MB pdI only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Y►nf f ra ft,IE rr Submittal Date 9/20/2021 Reviewer Meeting Request Decision Is a meeting required or is there more info needed?* r Yes (' No If rrnre information is needed,please add convents for the errail notification below.