HomeMy WebLinkAbout20210668 Ver 1_Meeting Request Review_20210920 DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnnienlrtl Qua fay
ID#* 20210668 Version* 1
Regional Office* Asheville Regional Office-(828)296-4500
Reviewer List* Kevin Mitchell
Pre-Filing Meeting Request submitted 9/20/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Kevin Barnett
Contact Email Address* khbarnett@ncdot.gov
Project Name* Polk Bridge 29
Project Owner* NC DOT Division of 14
Project County* Polk
Owner Address: Street Address
253 Webster Rd
Address Line 2
City State/Rovince/Region
Sylva NC
Fbstal/Zip Code Country
28779 US
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
I7 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Kevin Mitchell
Please give a brief project description below and include location information.*
This is a bridge replacement of an aged bridge on NC Hwy 9.There will
be no permanent fill associated with this project.There will be 140 linear
feet of dewatering for the temporary detour of traffic.
Please attach the documentation you would like to have the meeting about.
Polk County-B 29- Final Permit Plans.pdf 5.11MB
pdI only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
Y►nf f ra ft,IE rr
Submittal Date 9/20/2021
Reviewer Meeting Request Decision
Is a meeting required or is there more info needed?*
r Yes (' No
If rrnre information is needed,please add convents for the errail notification below.