Loading...
HomeMy WebLinkAbout20201820 Ver 1_ePCN Application_20210920 DWR Division of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1,2021 Ver4.1 Initial Review Has this project met the requirements for acceptance in to the review process?* 6' Yes ✓ No Is this project a public transportation project?* R Yes r No Change only if needed. BIMS#Assigned* Version#* 20201820 1 Is a payment required for this project?* ✓ No payment required Reviewing Office* (7 Fee received Winston-Salem Regional Office-(336)776- ✓ Fee needed-send electronic notification 9800 Select Project Reviewer* Dave Wanucha:eads\djwanucha Information for Initial Review la.Name of project: U-5738 1a.Who is the Primary Contact?* Amy Euliss lb.Primary Contact Email:* 1c.Primary Contact Phone:* aeuliss@ncdot.gov (336)747-7800 Date Submitted 9/20/2021 Nearest Body of Water Town Creek Basin Yadkin-PeeDee Water Classification C Site Coordinates Latitude: Longitude: 35.6421 -80.4938 A. Processing Information County(or Counties)where the project is located: Rowan Is this a NCDMS Project ✓ Yes ( No Is this project a public transportation project?* ( Yes r No Is this a NCDOT Project?* ( Yes r No (NCDOT only)T.I.P.or state project number: TIP U-5738 WBS#(?) 50163.3.1 Pre-Filing Meeting Information Is this a courtesy copy notification?* ✓ Yes G No ID# Version Pre-fling Meeting or Request Date 11/25/2020 Attach documentation of Pre-Filing Meeting Request here: Click the upload button or drag and drop files here to attach docunsnt DWR Pre-Filing Meeting Request Form.pdf 50.32KB Ole type nest be FCF 1a.Type(s)of approval sought from the Corps: [7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes ✓ No lb.What type(s)of permit(s)do you wish to seek authorization? r Nationwide Permit(NWP) f7 Regional General Permit(RGP) r Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? ✓ Yes 6 No Regional General Permit(RGP)Number: 201902350-Work associated with bridge construction,widening,replacement,and interchanges RGP Numbers(for multiple RGPS): ld.Type(s)of approval sought from the DWR: fJ 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes t No For the record only for Corps Permit: r Yes t No If.Is this an after-the-fact permit application?* ✓ Yes (' No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? 6 Yes r No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo 1h.Is the project located in any of NC's twenty coastal counties? ✓ Yes (' No 1j.Is the project located in a designated trout watershed? ✓ Yes ( No B. Applicant Information Id.Who is applying for the permit? f7 Owner r Applicant(other than owner) le.Is there an Agent/Consultant for this project?* 6. Yes r No 2.Owner Information 2a.Name(s)on recorded deed: NCDOT 2b.Deed book and page no.: 2c.Contact Person: 2d.Address Street Address 375 Silas Creek Parkway Address Line 2 (7ty State/Province/legion Winston Salem NC Postal/Zip(ode Country 27127 USA 2e.Telephone Number: 2f.Fax Number: (336)747-7800 2g.Email Address:* aeuliss@ncdot.gov 4.Agent/Consultant(if applicable) 4a.Name: Bob Lepsic 4b.Business Name: SEPI,Inc. 4c.Address Street Address One Glenwood Avenue Address Line 2 Suite 600 (7ly State/Province/legion Raleigh NC Postal/ZZp Code Country 27603 USA 4d.Telephone Number: 4e.Fax Number: (919)747-5857 4f.Email Address:* blepsic@sepiinc.com C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: (rf appropriate) 1c.Nearest municipality/town: Salisbury 2. Project Identification 2a.Property Identification Number: 2b.Property size: 34.9 2c.Project Address Street Address Julian Road Address Line 2 City State/Province/legion Salisbury NC Postal/Zip Code Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Town Creek 3b.Water Resources Classification of nearest receiving water:* C 3c. What river basin(s)is your project located in?* Yadkin-PeeDee 3d.Please provide the 12-digit HOC in which the project is located. 030401030301 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Land use at the site includes Julian Road and the maintained right-of-way areas.Land use in the project vicinity consists primarily of commercial development along roadways, forestland along stream corridors,interspersed with vacant land. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* ✓ Yes 6' No r Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 0.15 4g.List the total estimated linear feet of all existing streams on the property: 975 4h.Explain the purpose of the proposed project:* The purpose of the proposed project is to improve capacity and facilitate safe and efficient multilmodal operations by widening the roadway,controlling left turn movements with a median and directional crossovers,and installing striped bike lanes and sidewalks. 41.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The project will widen SR 2528(Julian Road,an existing local arterial/minor thoroughfare)between SR 2578(Klumac Road)/1-85 and U.S.601(Jake Alexander Boulevard)from a two- lane ditch section(with approximate ROW width of 60-feet)to a four-lane,divided facility(on 110-ft ROW)with a 23-foot raised median,curb and gutter,5-foot striped bike lanes and sidewalks on both sides of the roadway.Existing design speed of 50 mph will be retained with the proposed improvement of the facility to a major collector.A full movement traffic signal is proposed at Julian Rd/Corporate Circle(South)/W.Ritchie Rd.and a directional median crossover is proposed at Corporate Circle(North)that allows northbound Ulturns and southbound lefts onto Corporate Circle.A proposed triangular raised island will also create a yield condition for eastbound Jake Alexander Blvd.to southbound Julian Road right turns, improving safety for traffic exiting Old Julian Road.Also,new,extended or restriped turn lanes at all intersections are proposed to expand storage. In addition,the project includes addition of a sidewalk on the west side of Julian Road between Klumac Road/1-85 and SR 2667(Summit Park Drive).The portion of the project corridor proposed to be widened(with median,sidewalks and bike lanes)extends from U.S.601(Jake Alexander Boulevard)to SR 2578(Klumac Rd&I-85)and is approximately 4,700 feet in length.The portion of the project corridor proposed for sidewalk improvements only,extends from SR 2578(Klumac Rd&I-85)to SR 2667(Summit Park Drive),and is approximately 2,000 feet in length. We do not anticipate indirect impacts since the project is widening of a new road,and no new access will be granted as a result of the widening project.Standard road building equipment will be used. 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* 6' Yes r No in Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* • Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: SAW-2016-01370 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Eric Black,PWS Agency/Consultant Company: SEPI Inc Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR SAW-2016-01370 April 3,2017 DWR March 20,2017 6. Future Project Plans 6a.Is this a phased project?* ✓ Yes (cNo Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory �' 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): ®Wetlands rJ Streams-tributaries ❑Buffers ❑Open Waters n Pond Construction 2.Wetland Impacts 2a.Site#*(?) 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name* 2e.Forested* 2f.Type of 2g.Impact Jurisdicition*(?) area* 2B Dewatering Operation P Headwater Forest WB Yes Both 0.010 (acres) 2D Roadway Fill P Headwater Forest WB Yes Both 0.010 (acres) 3 Roadway Fill P Headwater Forest WD Yes Both 0.020 (acres) 4 E&SC Measures P Floodplain Pool WA Yes Both 0.010 (acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.000 0 050 2g.Total Wetland Impact 0.050 2i.Comments: Impact amounts differ from amount shown on permit plans due to rounding. 3.Stream Impacts 3a.Reason for impact CO 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* si (Site 1A)Culvert Extension Permanent Culvert Julian Branch(SB) Perennial Both 9 80 Average(feet) (linear feet) S2 (Site 1 B)Rip rap Permanent Bank Stabilization Julian Branch(SB) Perennial Both 9 67 Average(feet) (linear feet) S3 (Site 1 B)Rip rap Temporary Bank Stabilization Julian Branch(SB) Perennial Both 9 75 Average(feet) (linear feet) S4 (Site 2A)Bank Stabilization Permanent Bank Stabilization UT to Town Creek(SA) Perennial Both 3 10 Average(feet) (linear feet) S5 (Site 2B)Dewatering Temporary Dewatering UT to Town Creek(SA) Perennial Both 3 318 Operation Average(feet) (linear feet) S6 (Site 2C)Utility Relocation Temporary Other UT to Town Creek(SA) Perennial Both 3 36 Average(feet) (linear feet) $7 (Site 2D)Roadway Fill Permanent Fill UT to Town Creek(SA) Perennial Both 3 177 Average(feet) (linear feet) Sg (Site 5A)Bank Stabilization Permanent Bank Stabilization Town Creek Perennial Both 18 90 Average(feet) (linear feet) S9 (Site 5A)Bank Stabilization Temporary Bank Stabilization Town Creek Perennial Both 18 78 Average(feet) (linear feet) sip (Site 5B)Bridge Temporary Other Town Creek Perennial Both 18 99 Replacement Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 424 606 3i.Total stream and ditch impacts: 1030 3j.Comments: Impact amounts differ from amount shown on permit plans due to rounding. E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Avoidance and minimization of impacts to protected and valued resources were incorporated throughout the design process.A detailed delineation of wetland and streams was initially performed to ensure the limitations of impacts to natural resources.As a result,proposed disturbance limits were shifted to avoid impacts,where possible. The initial design proposed an aerial sewer crossing at Town Creek.Ultimately,the Town Creek impacts were minimized by utilizing the existing crossing of Town Creek in the proposed sewer design.Furthermore,in areas around and under Town Creek,all utilities will be installed via directional bore.Wetland impacts have been further minimized by steepening fill slopes and elongating erosion control basins where appropriate.The project erosion control plan has also been designed in accordance with Design Standards in Sensitive Watersheds. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: In addition,implementation of NCDOT's Best Management Practices for the Protection of Surface Waters(BMPs)will minimize impacts to water resources during the preconstruction,construction,maintenance,and repair situations.The existing 3-span bridge over Town Creek will be replaced with a wider 2 span structure to minimize stream impacts.The water line across the main stem of Town Creek is proposed to be constructed using horizontal directional drilling eliminating stream impacts at this location resulting from the utility crossing.As noted previously,the crossing of the SA (UT to Town Creek)is permitted as a temporary impact in the event that a directional bore is not possible.Furthermore,the plans specify that there will be no disturbance to the existing streambed outside of the utility location areas in SA(UT to Tow)Creek)that runs parallel the project. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? r Yes C No 2c.If yes,mitigation is required by(check all that apply): ✓DWR fJ Corps 2d.If yes,which mitigation option(s)will be used for this project? r-Mitigation bank fJ Payment to in-lieu fee r Permittee Responsible program Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a.Approval letter from in-lieu fee program is attached. ✓ Yes r No 4b.Stream mitigation requested: (linear feet) 4c.If using stream mitigation,what is the stream temperature: 514(257'at a 2:1 ratio) warm 4d.Buffer mitigation requested(DWR only): 4e.Riparian wetland mitigation requested: (square feet) (acres) 4f.Non-riparian wetland mitigation requested: 4g.Coastal(tidal)wetland mitigation requested: (acres) (acres) 4h.Comments F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ✓ Yes No If no,explain why: Project does not occur in a NC buffered basin. 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* (7 Yes CNo Comments: See attached permit drawings and stormwater management plan. Roadway runoff will be conveyed by curb&gutter and discharged into vegetated or riprap lined ditches prior to entering Julian Branch or Town Creek.The portion of the project from- L-STA 13+05 to STA 52+04 drains to Julian Branch and the portion from-L-STA 52+04 to 79+23 drains to Town Creek. G. Supplementary Information U 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ( Yes rNo lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPAISEPA)?* ( Yes rNo 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* ( Yes rNo 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes ( No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes ( No 3b.If you answered"no,"provide a short narrative description. The purpose of the proposed project is to improve capacity and facilitate safe and efficient multilmodal operations by widening the roadway.No additional development is anticipated as a result of this project. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes ( No r N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* ( Yes rNo 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ✓ Yes ( No 5d.Is another Federal agency involved?* ✓ Yes ( No r Unknown 5e.Is this a DOT project located within Division's 1-8? ✓ Yes ( No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? ( Yes r No 5g.Does this project involve bridge maintenance or removal? ( Yes r No 5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.? ( Yes r No If you answered"Yes"to 5g(1),did you discover any signs of bat use? ✓ Yes ( No r Unknown 5h.Does this project involve the construction/installation of a wind turbine(s)?* ✓ Yes ( No 5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? ( Yes r No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? U.S.Fish and Wildlife Information Planning and Consultation tool,Natural Heritage Program database,on-site habitat and species surveys. 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ Yes ( No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* https://www.fisheries.noaa.gov/resource/map/essential-fish-ha bitat-mapper 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* r Yes a No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* The project was reviewed by NCDOT Cultural Resource staff.No survey required forms for both Archeology and Historic Architecture are attached to the ePCN.Additionally,the Catawba Indian Nation was consulted for impact to tribal resources.In a letter dated,May 18,2020,they stated that they had no immediate concerns with the project.The tribal coordination are attached to the ePCN. 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* ( Yes r No 8b.If yes,explain how project meets FEMA requirements: The project has received a Conditional Letter of Map Revision(CLOMR)and a final Memorandum of Agreement(MOA).Copies of the CLOMR and MOA are attached. 8c.What source(s)did you use to make the floodplain determination?* Federal Emergency Management Agency(FEMA)Floodmaps Panel 5659(https://flood.nc.gov/ncflood/mappingprogram.html) Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach docutrent Cultural Resource documentation for ePCN.pdf 7.48MB FINAL U-5738 Julian Rd Widening NRTR_202109.pdf 17.31 MB U5738 DWR JS.pdf 1.28MB U5738 signed PJD.pdf 908.03KB U-5738 Cover Lettter_FINAL COMBINED_R.pdf 13.78MB U-5738_PermitPlans.pdf 8.14MB Re trust be FDF or ME Comments Signature * rJ By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Amy Euliss Signature Date 9/20/2021