Loading...
HomeMy WebLinkAbout20201516 Ver 1_boardman handout_20210920Reclamation Plan for Operations - Plan Narrative Please select at least one of the following Plan types: Borrow Pit Site k Waste Site ❑ Staging Area Division: 6 H Project Number/WBS: I R-5797 Enter Property Owner and Site Information: Property Owner Information: Name: BSO, LLC County: Columbus Site Information: Site Name: Stanley Rd Pit Address: Po BOX 685 Address: City: Lumberton City: State: Nc zip: 28359 State: Phone Number: (910) 738-6693 General Site Information: 262 Stanley Dr. Boardman NC Zip: 28438 Total Proposed Acreage: 28.54 Expected Depth (pit/waste): 12 Present Land Use: Agriculture farm land/Undeveloped Land Use after Reclamation: Undeveloped Land Site Distance at SR: 700+ ft right and left Other/Additional Information: NOTE; HAUL/ACCESS ROAD MUST I BE INCLUDED IN THE ACREAGE FOR THE CANDIDATE SITE. Reclamation Plan Site Description: 1. Complete at least one of the following sections based on the planned site use: a. Borrow Sites: Describe the proposed sequence of excavation (include the area/amount of clearing & proposes slope rates). Ensure the existing and final site cross sections are provided with the plan sheets. Clear site of small trees and brush, install silt fence, strip pit boundary of topsoil and stockpile in designated areas, install dewatering basin per plan, conduct mining operations inside of pit boundary, dewater into dewatering basin with aid of pump as necissary to allow for excavation of material, during excavation provide positive drainage of unexcavated areas so runoff goes into existing excavated area, during excavation maintain slopes at a minimum of 3:1, during mining operation place waste in excavated area and provide positive drainage into existing excavated areas making sure to adhere to provisions for waste in reclimation plan. upon completion of mining reclaim as shown on plan b. Waste Sites: Expected type of waste that will be placed in the site (examples: asphalt, concrete, soil, stone, etc.): Unclasified material, undercut material, asphalet, concrete, soil, stone and other inert material Describe the proposed sequence of placing waste (include proposed slope rates). Will the area be excavated prior to wasting material? What will the depth of burial be and the depth of backfill on top of material be, if any?: Excavate waste area to obtain usable fill material and place waste in excavated area in accordance with reclamation plan, slopes will be 3:1 or flatter. No asphalt material will be place less than 4 feet above water table and all construction material will be covered with a minimum of 6 inches of earthen material c. Staging Areas: Expected type of material/equipment that will be placed in the site (examples: asphalt, concrete, soil, stone, pipe, parking, etc.): Asphalt, concrete, stone, other inert material, unclassified undercut material and excavation equipment 2. Did the Environmental Evaluation indicate the presence of any wetlands or endangered species? (if yes, briefly list findings and indicate physical means by which buffer zone will be delineated): Environmental Evaluation indicates the presence of wetlands but no endangered species. Skaggs meathod was used to determine lateral effects on wetlands and buffers are shown and deliniated on reclimation plan. Lateral effect calculations were used to establish the pit boundary so that no dewatereing of wetlands will be incountered, no excavation activities will be conducted within the limits of the lateral effect buffers of the wetlands 3. Is any portion of the candidate site or access & haul roads located within a watershed that has riparian buffer zone requirements? (if yes, indicate physical means by which buffer will be delineated and how diffuse flow into the buffer zone will be maintained): No 4. Is the site adjacent to High Quality Waters as defined by the Department of Environmental Quality? (if yes, note how the devices have been designed to meet NCDEQ requirements): No 5. Describe the intended plan and sequence for final site reclamation and subsequent use of all affected lands; indicate the general methods to be used in reclaiming this land, including any stockpile areas, haul roads, and ditches. Attach a site map which illustrates this plan, showing the location and design of all temporary and permanent erosion control devices. All features must comply with the appropriate specifications, NCDOT standards, and reflect Best Management Practices (BMPs). The plan must indicate setbacks to adjacent properties, buffer zones, and if de -watering is required, and the pit is located within the 15 county region of the CCPCUA, the GPS coordinate location of any well located within 1,500 ft. of the pit. After completion of mining and waste opereation top dress slopes with topsoil from stockplile, seed and mulch according to the seeding schedule provided in reclamation plan. Upon succesfull seeding and established vegitation remove all erosion control measures in accordance with approved reclimation plan 6. Will excavation extend below the water table? (if yes, complete below): Yes E a. Specify how de -watering will be accomplished. Include proposed method of reducing effluent turbidity so that it meets the requirements of the Division of Water Resources. Show any pit dewatering basins, construction details, and calculations on the plan: Dewatering will be done with the aid of a pump where as the suction end will be a floating device to remove the clean water from the pit. Install velocity disipator in the dewatering basin to allow for setlement of any silt entering pump intake. Dewatering basin will draw water from the top of the basin to allow for silt settlement. Install velocity disipator at the discharge of the dewatering basin to allow for slow flowing clean water to run off down slope b. If the pit is located within the Central Coastal Plain Capacity Use Area, has the permit been approved? If so, list the person responsible for completing the Division of Water Resources CCPCUA spreadsheet and method of submission to the Engineer. Has the permit been approved by DWR? Proposed Pit is not in the Central Coastal Plain Capacity Use Area c. If water is to remain in the pit after completion, state the estimated depth of the water (minimum depth is 4 ft.). Indicate the water table depth prior to beginning excavation and the method used to obtain this information. Expected water depth is 8-10 ft. Water table depth varies across site due to changing contours, water table elevations were gathered during test pit excavation where holes were left open for 48 hours to allow for water level to equalize then averaged for the entire site d. If Yes, and a buffer less than 400' has been proposed, has the Skaggs Method report been attached? Yes 7. Describe the proposed schedule of permanent seeding and mulching for the site. Detail the frequency of permanent seeding and mulching. Note: a stand of permanent vegetation is required prior to a final inspection. Stage seed perimeter slope and bottom of pit when 1 acre of distrubed area is exposed or as directed by the engineer. Property Owner's Statement: hereby certify that I am in agreement with this development, use, and Reclamation Plan, and any exceptions noted when approved by the Engineer, and that I understand that I will be responsible for the site upon completion of its use in the construction of the project noted in the map key. I understand that this plan, when approved, will serve as a guide in controlling erosion and sediment in accordance with the Mining Act and the Sediment and Pollution Control Act and as enforced by the North Carolina Department of Environmental Quality (DEQ). I understand that any work exceeding the minimum necessary for compliance with DEQ requirements, should be negotiated between the Department of Transportation (DOT) and the Property Owner. My signature below authorizes the DOT, the DEQ or its agents, to enter upon my property for a period of one year from the date of final acceptance of the project for which this site plan is executed. If necessary, the DOT will be allowed to repair any areas that are not in compliance with DEQ requirements. After a one-year inspection is held, I will be solely responsible for assuring that the site is in compliance with DEQ regulations. I have the right to change the condition of the site after the final inspection and prior to the one year follow-up inspection. However, if I make such changes, I acknowledge that DOT is released from all obligations and conditions of this agreement and I will become solely responsible for the condition of the site beginning on the date that I change the final inspection condition. Signatures: Engineer: Owners of Record: XQ, _ Witness: Owner: Exceptions: Concurrence with exceptions: Engineer: Property Owner's): Date Name Date Name Date