HomeMy WebLinkAboutNCG030305_DMR_20201123Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and Pnl Resources General Permit No. NCG03(
Date submitted 1 3
CERTIFICATE OF COVERAGE NO. NCG03Q SAMPLE COLLECTION YEAR 20W
FACILITY NAME+TrI/„r,o�►L/' Flw,l,y iaha 4tz�d Fasie;th.�) SAMPLEPERIOD❑Jan-June ❑r July -De
COUNTY _C,}Q;,(� or Momhte OCitD=r
PERSON COLLECTING SAMPLES LTee(P_ DISCHARGING T clAs.S ❑ORw QHQw
LABORATORY_ VIIrk Lab Cent# []Zero -flow ❑W
Comments on sample collection or analysis: CROther,L_
PLEASE REMEMBER TO SIGN ON PJ
Part A: Stormwater Benchmarks and Monitoring Results
Otntatl No.
Data Sample
CogactetF
mo dd/yr)I
24-hour rainfall
amount
inches'
Total Suspended Solids
P
PH'
Standard units
f
Total Copper
Total Lead
Total Zinc
Nor
Tab
Hy
denchmanb
_
-
100 mg/L or So mg/L'
6A —9.0
0.010 mg/L
0.075 mg/L
0.126 mg/L
Parmneeer Code
-
46529
C0530
00400
01J39
01051
02094
i
C
�mPlmg linstea0 or seml-annueq must begin with the second consecutive benchmark exceedance forth a same parameter at
For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmarkhe
°The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rall
`See General Permit, Section g, Table 1 to 9dendfy the especially sensitive receiving water class;flwtlons where the more protective bent
s Total70YJc Organl6 sampling is applicable only for these facildes which perform metal finishing operations, manufacture semiconduct
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the deflnitlonofTotal ToxlcO...ganlcsIsthat definition
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 4C CFR 433.11;
manufacture use the definition as found In 40 CFR 469.12; far electronic crystal manufacture use the definition as found In 40 CFR 469X
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2C1&45/31/1021
RECE/VEo
Dw ''SEC
TI0
SWLF-245,1
Page : e 3
FaUtities t,c incorporate a solvent management plan into the Stormwater Pollution Prevention Plan m so
may be waived. The solvent management plan shall include a list of the total toxic o �' used and
the and the requirement for
Permit Fortiose facilities electing to employ the TTO Monitoring waiver, the discharger rishatl sign tr:e mil wing certification stateme listedmerft : In t
-Based upon my inquiry of the parson or persons dI Ttl
(TTO), t a�tfy that to the bast of my Imcvrtedgs and r b Ilef, no dumping o�t concentrated taxi og compliance �t.�ithe permit menttortr�g requlremertt jor total tc
storrrmter runoff has occurred since filing the last dischargeF i; into the stormwaier or areas which one �c
sohwt managementcrlrg ' n
plan Included In the Stormwater Pollution Prevention P�.'$ ���, � rtV that this facility is implerne tang the all the pravisi
Name (Print name)
WI -A
True (Print tide)
NIps- _
Signature D
Note: Results must be reported in numerical format, Do not report Below Detection Umlt, BDL, <P" Non -detect, ND, or other similar nor.-n
format When results are below the appilcable limits, the, must be reported in the format, I -= min, where �C is the numerical value of Zt
limn, reporting limit, etc, in mg/L
,'Vato-: If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tler4 or Trer 3 responses. See General Permit d
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
Outfail No. Oats Sam ale Coq$ttedl
(mo/dd/w)
Benchmarks
PorumOter Code
Footnotes from part A also apply to part B
No discharge this
24}rour rainfall amount, New Motor oil cr Non -Polar o&0/ Total Total Suspeni
inches Hydraulic Oil Usage Petroleum Hydrocarbons Solids
i5 mg/L 100 mg/1 or so
46529 NCOFL 00552 COS30
Note: ff you report a sample value in excess of the benchmark you must Implement 71er 1, Tler 2, or Tier 3 responses Sete General permitto
Parmft��:11/1f2018-45/' V20Zi
SM 245, last revl
Page 2 of 3
-OR PART A yn ARTB
a A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SeCfION S.
. 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTrIE SAME OUTFA!L TRIGGER TIER 2 REQUIREMENTS. SEEN n T1ER 3: HAS YOUR FAC UTy RAO 4 OR MORE BENCHMARK EKCEEDENCES FOR THE SANE PARAMETER AT ANY ONE OU' IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL CFFICE? YES ❑ NO El
REGIONAL OFFICE CONTACT NAME:
14oi1 an orioina! rnav of this DMR JncludJna all '4Vo Discharo reports f 30 da race! o the lab resuks
case of No Dfsrharae`reports) to:
Division of Water quality
Attn: DWQ central Files
_617 Mail Service Center
Raleigh, North Carolina 27699-1617
IOU -MUST SIGN THIS CERit YION FOR Ah INfOR0.��TiON REPORTED
I carory, under penalty of law, that this document and all attachments were prepared under my direction or supervision In acco:
assure that quaiifled personnel property Pther and evaluate the Info. -matron submitted. Based on my inquiry of the person or pi
those persons directly responsible for gathering the information, the information submitted %to the best of my knowledge and
am aware !hat there are significant penalties for submitting false information, Including the possibility of fines and Imprisonment
of Permittee
Lindsey Toole
HR/EHS Manager
614 NC Hwy 200S
Stanfield, NC 28163
o: +1 704.888.7104
c: +1980.581.1438
lindsey.toole@sbdinc.com
stanleyengineeredfastening.com