Loading...
HomeMy WebLinkAboutNCG030293_DMR_20200803SiIb4pEINEE August 11 , 2020 Rick Mirecki REC F- N I F 0) CIRCOR Pumps North America LLC 1 1 ZO2� SEP 1710 Airport Road Monroe, North Carolina 28110 �;JTRRI I'll ES Subject: Monthly Stormwater Sampling —July 2020 Certificate of Coverage No. NCGO30293 CIRCOR Pumping Technologies — Monroe, NC Shield Project No. 1150109-02 Dear Mr. Mirecki: There were no qualifying rainfall events for the month of July 2020, (as defined by General Permit No. NCG030000). As a result, no monthly stormwater samples were collected for Stormwater Discharge Outfall #004 at the CIRCOR Pumps North America LLC — Monroe facility in July. According to rainfall data` collected for the month, three rain events or group events occurred on July 101, July 24", and July 291h, producing 0.78 inches, 0.04 inches and 0.20 inches of rain, respectively. However, each of these events took place after normal business hours, within 72 hours of the last rain event, or did not produce enough rainfall to collect a sample. As the seasonal type of storm event is moving towards a high intensity, short duration event, usually commencing in late afternoon through early evening with little to no notice for preparation, Shield will continue to monitor daily weather conditions and attempt coordination of appropriate staff and resources to facilitate adequate sample collection. CIRCOR — Monroe facility should complete all relevant sections on the Stormwater Discharge Monitoring Report (DMR). The completed DMR form should then be mailed to the regulatory agency's Central Files. Shield will continue to attempt to perform monthly sampling per Tier Two requirements until instructed to halt by CIRCOR. Shield greatly appreciates the opportunity to provide environmental services to the CIRCOR Pumps North America LLC. If you have any questions in reference to this document or require further information, please feel free to contact either of the undersigned at (704) 394-6913. Respectfully, SHIELD ENGINEERING, INC. ~_ Magdaline Tzannis Robert L. Griffin P. Senior Project Manager President/CEO Brandon Huggins, EIT Staff Engineer Attachments: Discharge Monitoring Report — July 2020 ` Rainfall data collected from ww .wundcreround.com 4301 Taggart Creek Road Telephone 704.394.6913 Charlotte, NC 28208 w .shieldengineeling.com Fax 704.394.6968 Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 8/3/2020 CERTIFICATE OF COVERAGE NO. NCG03 0 2 9 3 SAMPLE COLLECTION YEAR 2020 FACILITY NAME Circor Pumping Technologies SAMPLE PERIOD [])an -June © July -Dec COUNTY union CC C C nr� or M Monthly' July /monthl PERSON COLLECTING SAMPLES NA RCCEIVEDDISCHARGINGTOCLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY NA Lab Cert. # NA ❑Zero -flow ❑Water Supply ❑SA Comments on sample collection or analysis: ---SEP 1 1 2020 Mother No qualifying rain event during normal business hours Cr-N-i i<Y L FILES DS"dR C_CTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids PH Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks _ - 100 mg/L or 50 mg/L° 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 olo51 01094 00552 78141 SDO #004 NA NA NA NA NA NA NA NA NA ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) Signature Date Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits,-thok Must be -reported in'the format: "<XX mk/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil.per month. ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' New Motor Oil or Hydraulic Oil Usage Non -Polar O&G/ Total Petroleum Hydrocarbons Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/O Parameter Code 46529 NCOIL 00552 COS30. Footnotes from Part A also apply to Part B Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 Z! O T ° Z¢ O m F ° w u a w ° . N ° W H �© M OLL O c uw ull N w W O W ° T W X W W Q Y U LL ¢ O ° 2E W U V y Z 0 m c0—q ° Z W w K � w C� Q K W 0 o y a W a o � u G � Ij- a yy8 J 6 Z ¢ ° K O f « d t 7 O Q OOz O° 2 Q O— U a m S V � W LL W_ O •` ° IV y�j L U H Q O a.�Z ° ° o O • O m � w