Loading...
HomeMy WebLinkAbout20161268 Ver 1_RE_ U- 4751 Loss Site 3_20210922From:Farrell, Sean C To:Shaver, Brad E CIV USARMY CESAW (USA); Sprinkle, Hannah H Cc:Lane, Stephen; Herndon, T. Mason; Westphal, Anneliese; Yarborough, Jerry W; Stewart, Alex D Subject:RE: U- 4751 Loss Site 3 Date:Tuesday, September 21, 2021 4:29:06 PM Attachments:Site3_Loss_postRetrieval.JPG Site3_topSlope.jpg image001.png Site4_ToeProtection.JPG Site4_ToeProtection_foam.JPG Site4_Foam.JPG Brad and Hannah, The Site 3 loss area was approximately 10’ x 15’ and had already been shoveled out when I got there. We will check to see if there are any additional deposits that have to be removed when the water level recedes but I had them stop for now. The mechanized clear area will have to be cleaned out again and the slopes regraded and reseeded. You can see in the photos that the top of the slope had grass growing and there was not significant rilling until the bottom quarter of the slope. We discussed potentially placing riprap toe protection in this location as well. I will keep you updated on that. At Site 4 (STA 65+00) where we had standing water up to the top of the silt fence we finished placing riprap toe protection last week as a means of addressing the concerns regarding the potential for washing. There is currently a lot of standing water at this location, so I am glad we got that in before this storm. I did not see any rills in the slope. There is a foam film on the surface of the standing water. I am not sure if this is from sediment or from the straw and fertilizer. Overall, there is a lot of maintenance to do at the site, especially for retrieving material from mechanized clearing areas, but no other losses were noted. Please let me know if you have any questions, Thanks, Sean Farrell Division Environmental Officer Division 3 NCDOT- Division of Highways 910-341-2033 office 910-599-1184 mobile scfarrell@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Farrell, Sean C Sent: Tuesday, September 21, 2021 1:51 PM To: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil>; Sprinkle, Hannah H <hannah.sprinkle@ncdenr.gov> Cc: Lane, Stephen <stephen.lane@ncdenr.gov>; Herndon, T. Mason <tmherndon@ncdot.gov>; Westphal, Anneliese <awestphal@ncdot.gov>; Yarborough, Jerry W <jyarborough@ncdot.gov> Subject: U- 4751 Loss Site 3 Brad and Hannah, U-4751 Military Cutoff Extension had a loss at into wetlands at Site 3 (STA 57+00 RT L) after receiving ~3.5 inches of rain last night. It sounds like the contractor may have already gotten going on removing material so I am heading out to the site now. The contractor had previously removed material from the mechanized cleared area after our last site visit and seeded and mulched the slopes beginning of last week. It appears that fill material overwhelmed the weir in the wattle SDO. The washing was attributed to rainfall as the road is graded to drain to the opposite side where there are slope drains installed. I will provide additional information after my visit. Feel free to call me with any questions. Thanks, Sean Farrell Division Environmental Officer Division 3 NCDOT- Division of Highways 910-341-2033 office 910-599-1184 mobile scfarrell@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.