Loading...
HomeMy WebLinkAbout20211241 Ver 1_B3186-B5898_Permit Drawings_20210512_SA labels added Sep 19 21_20210919(Version 2.08; Released April 2018)38332.1.FS.1 / 48030.1.FS.1TIP No.:B-3186 / B-5898County(ies):Haywood Page 1 of 2TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?NoDesign/Future:Year:2042Existing:Year:Aquatic T&E Species?YesComments:YesN/AYesN/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)ac.4-lane divided freeway w/ a 32 foot variable median; (2) 12 foot outside paved shoulders, (2) 12 foot travel lanes, (1) 32 foot paved median shoulder - total width of 104 feet. 59400taylor.carter@hdrinc.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class BNCDWR Surface Water Classification for Water BodyN/ABuffer Rules in Effect:Richland Creek, SAfecal coliform351006-lane divied freeway w/ a 24 foot variable median; (2) 12 foot outside paved shoulders, (3) 12 foot travel lanes, (2) 12 foot paved median shoulders - total width of 120 feet.Waterbody Information2022NCDWR Stream Index No.:38332.1.FS.1 / 48030.1.FS.1Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)Project Description: The proposed project (B-3186 / B-5898) widens US 23 / US 74 between Ext. 102 and Ext. 104, including the widening of bridge B-3186 over Richland Creek and bridge B-5898 over the Blue Ridge Southern Railroad (BLU). The project will construct approximately 1.3 miles of 6-lane divided freeway. There is one major interchange with US 17. Richland Creek is a FEMA stream. The project includes a temporary detour bridge over Richland Creek. There are no wetland or buffer zones on the project. Impact Minimization Efforts: Guardrail with 2:1 and 1.5:1 side slopes (including rock plating for the 1.5:1 side slopes) were utilized throughout the project to minimize impacts to streams and wetlands, as well as right of way. The temporary detour alignment is located such that it will temporarily impact the entire length of the UT to Richland Creek. After the detour alignment is removed, the UT to Richland Creek will be restored to its original condition. Proposed pipe and ditch outlets into the UT and Richland Creek are designed to have non-erosive outlet velocities. Stormwater BMP Measures: There are no new proposed stormwater BMPs on the project. There is one existing BMP on the project, a dry detention pond, for which the intent is to maintain. Ditches have been designed to meet grass swale criteria where possible. Deck Drains Discharge Over Water Body: Deck drains are needed to meet design requirememnts for spread during on-site traffic control patterns. Spread analysis was complete for both the temporary and permanent conditions, resulting in the need for deck drains on the proposed B-3186 replacement bridge, and on the temporary detour bridge over Richland Creek. 555 Fayetteville Street, Suite 900North Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:345 Toot Hollow Rd.Address:General Project InformationB-3186 / B-5898WBS Element:Roadway WideningWBS Element:HDR Engineering / Taylor Carter, P.E.NCDOT Contact:(828) 488-0902Raleigh, NC 27601Contractor / Designer:(919) 232-6689gbhigdon@ncdot.govAddress:5/12/2021HaywoodLake JunaluskaGarret Higdon, EIBryson City, NC 28713River Basin(s): City/Town:37.5Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)NoRural/Light CommercialRichland Creek5-16-(11.5)29.41.26 milesProject DescriptionProposed ProjectFrench BroadNoneSupplemental Classification: Appalachian Elktoe: NCDOT Biological Surveys Group will be responsible for habitat assessment and, if needed, surveys for the Appalachain Elktoe. Wetlands within Project Limits? (Version 2.08; Released April 2018)38332.1.FS.1 / 48030.1.FS.1TIP No.:B-3186 / B-5898County(ies):Haywood Page 2of 2Sheet No.Station & Coordinates (Road and Non Road Projects)Surface Water BodyBase Width(ft)Front Slope(H:1)Back Slope(H:1)Drainage Area(ac)Recommended Treatm't Length(ft)Actual Length(ft)Longitudinal Slope(%)Q2(cfs)V2(fps)Q10(cfs)V10(fps)Rock Checks UsedBMP Associated w/ Buffer Rules?-Y1RT- 19+08 Lt.-Y1RT- 21+21 Lt. -Y1RT- 21+21 Lt. -Y1RT- 24+00 Lt. 1.5North Carolina Department of TransportationHighway Stormwater ProgramSTORMWATER MANAGEMENT PLANFOR NCDOT PROJECTSAdditional CommentsNoNo(1)Richland Creek(1)Richland CreekSwalesNo1.70.3 256.01.22% 0.50.70.0 6.0 6.00.0 6.021356100.51.50.6WBS Element:1.710No2792.52%1.3 48" CMP ( ( Racoon F acto rBranch D L = 86.78'T = 43.39'R = 3,500.00'D L = 405.72'T = 204.31'R = 1,390.00'-RR- -R R - -RR- PC STA. 310+32. ALIGNMENT -RR- TIED TO FIELD SURVEY AT 1267+20 TO 1478+40, DATED DECEMBER 31, 1927. SOUTHERN RAILWAY COMPANY, MURPHY DIVISION, STATION ALIGNMENT -RR- BASED ON RIGHT-OF-WAY AND TRACK MAP, -RR- PC Sta. 1307+03.14-RR- PT Sta. 1307+89.92 -RR- PC Sta. 1308+35.40 - R R- P T Sta. 1312+41.12 PI Sta 1310+39.71 PI Sta 1307+46.53 1310+00 D T V = = = = = = % % MPH ADT ADT % * FUNC CLASS = FREEWAY DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED K 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 CONTRACT:ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NANCDOT\NCDOT-B3186_TO2_c_\6.0_CAD_BIM\6.2_Work_In_Progress\B-3186-B-5898\Hydraulics\PERMITS_Environmental\Drawings\B3186-B5898_HYD_PRM_WET_TSH.dgnCMYERS5/12/2021NCDOT_pdf_color_eng_100.plt11:10:48 AMNCDOT_TSH.tblPENTABLE:TIME:DATE:PLOT DRIVER:USER:FILE:HAYWOOD COUNTY 2022 2042 47,300 59,400TIP PROJECT:B-3186 / B-58985 50 25 50 100 50 25 50 100 10 5 10 20 AND UTILITIES. GRADING, DRAINAGE, PAVING, STRUCTURES B-3186 / B-5898 38332.1.FS.1 BRNHP-0023(32) 48030.1.FS.1 BRSTP-0019(49) 2018 STANDARD SPECIFICATIONS JANUARY 18, 2022 NAD 83/ 2011TO W A Y N ESV ILLETO I-40/ASHEVILLE TO US-276 742319 74 23 19 9 55 DUAL 3%* TTST = 2% 8 65 STATEWIDE TIER4 510 7 8 6 -L_LT- -L_RT- -L_LT- -L_RT- -L_LT- -L_RT- -Y1 RT- -Y1 L T- -L_LT- -L_RT- -Y1LT- -Y1RT- 23 BUS STATE OF NORTH CAROLINA, DIVISION OF HIGHWAYS CONVENTIONAL PLAN SHEET SYMBOLS -Y1RT- STA. 29+79 +/- END BRIDGE -Y1RT- STA. 26+27 +/- BEGIN BRIDGE -L_RT- POT STA. 43+98 +/- END BRIDGE -L_LT- POT STA. 41+52 +/- BEGIN BRIDGE -L_LT- POT STA. 68+02 +/- BEGIN BRIDGE -L_LT- POT STA. 69+60 +/- END BRIDGE -L_RT- POT STA. 67+77 +/- BEGIN BRIDGE -L_RT- POT STA. 69+50 +/- END BRIDGE N O R FO LK SO U TH ER N R A IL R D JULY 8, 2021 P.E. P.E. -L_RT- POT STA. 41+41 +/- BEGIN BRIDGE -L_LT- POT STA. 43+84 +/- END BRIDGE (LENGTHS BASED ON L_RT ALIGNMENT) LENGTH ROADWAY TIP PROJECT B-3186 / B-5898 = 1.181 miles TOTAL STRUCTURES TIP PROJECT B-3186 / B-5898 = 0.076 miles TO THE LIMITS ESTABLISHED BY MODIFIED METHOD CLEARING ON THIS PROJECT SHALL BE PERFORMED ACCESS BEING LIMITED TO INTERCHANGES THIS IS A CONTROLLED-ACCESS PROJECT WITH RIC H L A N D CREEKHDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 Prepared in the Office of: PROJECT ENGINEER PROJECT DESIGN ENGINEER PHILLIP E. ROGERS, PE HENRY W. BARE NCDOT CONTACT GARRETT HIGDON, EI FROM WEST OF NC 209(CRABTREE RD.) TO EAST OF RUSS AVE. LOCATION: US 23/US 74/US 19 (GREAT SMOKEY MOUNTAIN HWY) TOTAL LENGTH TIP PROJECT B-3186 / B-5898 = 1.2579 miles %23 %BUS 23 BYP %74 23 19 (209 %19%276 %74 (209 %276 19 %276 Junaluska Lake NorfolkSouthernCorp.Rail RdOld C o u nty R d Li n er Co v e Rd.Old County RdHallT opRdCity Li mits Corley Rd Broad St Mauney Cove Rd VICINITY MAP B-3186/B-5898 END TIP B-3186/B-5898 BEGIN TIP -L- STA. 15+00.00 BEGIN TIP PROJECT B-3186/B-5898 -L- STA. 81+35.95 END TIP PROJECT B-3186/B-5898 WAYNESVILLE -Y1LT- STA. 11+99.83 BEGIN CONSTRUCTION -Y1RT- STA. 12+00.00 BEGIN CONSTRUCTION DETOUR OFF SITE SHEET __ OF __ PERMIT DRAWING SITE 1 SITE 3 SITE 2 SUBMITTAL: 05/13/2021 WATER IMPACTS WETLAND AND SURFACE SHEET __ OF __ PERMIT DRAWING 3'-6" IF NECES S ARY5' OVERLAP MI NCONSTRUCTION LIMIT GROUND LINE 4' - 6' IF NE CES S ARY5' OVERLAP MI N4'-6" MIN GUTTER GUTTER CURB AND FACE CURBBERM WIDTH6" DIA. PERFORATED SUBDRAIN PIPE GROUND LINE IF NE CES S ARY5' OVERLAP MI NGROUND LINE 1' CLEARANCE MIN 2' 4'-6" MIN CONSTRUCTION LIMIT GROUND LINE FACE GUARDRAIL 4'-6" MIN 1' CLEARANCE MIN IF NECE S S ARY5' OVERLAP MI N(PLAN VIEW) MIN (TYP) 18" OVERLAP TOP OF SLOPE TOE OF SLOPE MIN (TYP) 5' OVERLAP ROLL WIDTH AND GUTTER, GUARDRAIL AND BERM DETAILS SEE ROADWAY TYPICALS FOR GUTTER OR CURB 2' EMBANKMENT EXISTING GROUND EMBANKMENT SUBDRAIN COARSE AGGREGATE STEEL BEAM GUARDRAIL IF APPLICABLE GUARDRAIL, STEEL BEAM 1.5:1 (H:V) OR F LATTER CUT S LOP E1.5:1 (H:V) OR F LATTER CUT S LOP EF LATTER FI LL S LOP E1.5:1 (H:V) ORF LATTER FI LL S LOP E1.5:1 (H:V) ORROCK PLATING DETAIL NO. 3 - TYPICAL SECTION ROCK PLATING DETAIL NO. 1 - TYPICAL SECTION ROCK PLATING DETAIL NO. 4 - TYPICAL SECTION ROCK PLATING DETAIL NO. 2 - TYPICAL SECTION EXISTING GROUND FOR DITCH DETAILS SEE ROADWAY TYPICALS OR FINISHED GRADE DETAILS GUTTER, CURB AND GUTTER SEE ROADWAY TYPICALS FOR CONSTRUCTION LIMIT OR FINISHED GRADE DETAILS GUTTER, CURB AND GUTTER SEE ROADWAY TYPICALS FOR STEEL BEAM GUARDRAIL FACE GUARDRAIL 10' MAX FOR ROCK PLATING GEOTEXTILE GEOTEXTILE FOR ROCK PLATING GEOTEXTILE FOR ROCK PLATING FOR ROCK PLATING GEOTEXTILE OVERLAP DETAIL SEE GEOTEXTILE OVERLAP DETAIL SEE GEOTEXTILE (TOE OF SLOPE) SLOPE STAKE POINT BREAK POINT (TOP OF SLOPE) SHOULDER OR BERM (TOE OF SLOPE) CONSTRUCTION LIMIT SLOPE STAKE POINT AND BREAK POINT (TOP OF SLOPE) SHOULDER OR BERM (TOP OF SLOPE) SLOPE STAKE POINT SLOPE TOE OF SLOPE TOE OF (TOP OF SLOPE) SLOPE STAKE POINT 18" CLASS IV SELECT MATERIAL (ABC) 18" CLASS IV SELECT MATERIAL (ABC) ROCK PLATING (TYP) GEOTEXTILE FOR 2' 2' L C DITCHL (SEE NOTE 3) 2' THICK RIPRAP (SEE NOTE 3) 2' THICK RIPRAP NOTES: 3. 2. 1. C GUTTER OVERLAP DETAIL SEE GEOTEXTILE (SEE NOTE 3) 2' THICK RIPRAP OVERLAP DETAIL SEE GEOTEXTILE (SEE NOTE 3) 2' THICK RIPRAP USE CLASS 1, 2 OR B RIPRAP UNLESS REQUIRED OTHERWISE IN THE ROADWAY SUMMARY SHEETS. FOR STANDARD ROCK PLATING, SEE SECTION 275 OF THE STANDARD SPECIFICATIONS. SEE ROADWAY PLANS AND SUMMARY SHEETS FOR ROCK PLATING LOCATIONS. GEOTEXTILE OVERLAP DETAIL DEPART ME NT OF TRANSPORTATIONSTATE OF NORTH CAR O LI NAROCK PLATING STANDARD DIVISION OF HIGHWAYS DEPARTMENT OF TRANSPORTATION NORTH CAROLINA ENGINEERING UNIT GEOTECHNICAL STANDARD DETAIL NO. 1802.01 DATE: 2-19-13 PROJECT REFERENCE NO. ENGINEER SIGNATURE DATE SHEET NO. ENGINEER GEOTECHNICAL SIGNATURE DATE DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 3D-1B-3186 / B-5898 SHEET __ OF __ PERMIT DRAWING D B 4" 4" d B-3186 / B-5898 ENGINEER SHEET NO.PROJECT REFERENCE NO. 3D-2 8/17/99ROADWAY DESIGN REVISIONS PENTABLE:FILE:NCDOT\NCDOT-B3186_TO2_c_\6.0_CAD_BIM\6.2_Work_In_Progress\B-3186-B-5898\Hydraulics\PERMITS_Environmental\Drawings\B3186-B5898_PRM_DETAILS.dgnUSER:CMYERSDATE:5/11/2021NCDOT_pdf_color_eng_100.pltPLOT DRIVER:5:50:33 PMTIME:NCDOT_permits_CON.tblHDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 D B 4"FROM STA. 28+63 LT -Y1LT- DETAIL G ~ SEIRAV ( Not to Scale) GROUND NATURAL WALL RETAINING BREAKER BOND BEHIND RETAINING WALL CONCRETE DITCH WITH CONCRETE SILL ~ ~WALL RETAINING BREAKER BOND SILL CONC. SILL CONC. GRATE DRAINAGE B= 2.0' D= 1.0' 1:2 d= 0.5' ( Not to Scale) FROM STA. 32+08 TO STA. 32+56 LT -Y1RT- FROM STA. 31+13 TO STA. 31+61 LT -Y1RT- D DETAIL H Point Shoulder Point Shoulder d B B= 2 Ft. Max. d= 1 Ft. Min. D= 2 Ft. *When B is < 6.0' Type of Liner= Class B Rip-Rap Geotextile Flatter2:1 or Flatter 3: 1 or SPECIAL CUT BASE DITCH FROM STA. 43+71 TO STA. 44+13 LT -L- FROM STA. 43+28 TO STA. 43+58 LT -L- FROM STA. 41+99 TO STA. 42+29 LT -L- FROM STA. 43+15 TO STA. 43+45 RT -L- FROM STA. 42+66 TO STA. 42+96 RT -L- FROM STA. 41+32 TO STA. 41+61 RT -L- DETAIL L GEOTEXTILE GROUND PLAN VIEW PROFILE VIEW DECK DRAIN DISSIPATOR PAD *NOTE: CENTER PAD DIRECTLY BELOW DECK DRAINS Geotextile= 69 sy (Total) Type of Liner= 46 TONS CL B Rip-Rap (Total) L= Varies PAD DISSIPATOR ( Not to Scale) 1.0' L 4.0' ( Not to Scale) FROM STA. 31+61 TO STA. 32+08 LT -Y1RT- D DETAIL Q Point Shoulder Point Shoulder d B B= 2 Ft. Max. d= 1 Ft. Min. D= 2 Ft. *When B is < 6.0' Type of Liner= Class I Rip-Rap Geotextile Flatter2:1 or Flatter 3: 1 or SPECIAL CUT BASE DITCH B 2:12: 1 D ( Not to Scale) STANDARD BASE DITCH FROM STA. 72+00 TO STA. 72+10 RT -L- FROM STA. 35+12 TO STA. 36+13 RT -Y1RT- DETAIL K B= 2 Ft. Min. D= 1 Ft. Ground Natural Ground Natural ( Not to Scale) 2:12: 1 D B b LATERAL BASE DITCH 1"/Ft. FROM STA. 36+36 TO STA. 39+00 LT -L- DETAIL F b= 5 Ft. B= 2 Ft. Min. D= 1.5 Ft. Ground Natural Slope Fill L S etc. GI 10:1 20 :1 ( Not to Scale) FALSE SUMP 2.0' STA. 21+06 RT -Y1RT- STA. 19+86 RT -Y1RT- STA. 71+81 M -L- STA. 69+73 M -L- STA. 67+62 M -L- STA. 63+38 M -L- STA. 21+73 RT -L- STA. 21+11 M -L- STA. 18+94 M -L- STA. 18+92 RT -L- STA. 15+55 M -L- DETAIL M Traffic Flow Outside Ditch 1.0' Max0.5' Min.S=Ditch Slope C Proposed Ditch 2:12: 1 D ( Not to Scale) STANDARD BASE DITCH B d FROM STA. 15+28 LT -L- DETAIL A B= 2 Ft. Max. d= 1 Ft. Min. D= 1 Ft. Ground Natural Ground Natural *When B is < 6.0' Type of Liner= Class II Rip-Rap Geotextile 2:12:1D ( Not to Scale) STANDARD BASE DITCH B d FROM STA. 36+13 TO STA. 37+50 RT -Y1RT- DETAIL S B= 2 Ft. Max. d= 1 Ft. Min. D= 1 Ft. Ground Natural Ground Natural *When B is < 6.0' Type of Liner= Class B Rip-Rap Geotextile 2:12:1D ( Not to Scale) STANDARD BASE DITCH B d FROM STA. 71+12 TO STA. 72+92 LT -L- DETAIL I B= 2 Ft. Max. d= 1 Ft. Min. D= 1 Ft. Ground Natural Ground Natural *When B is < 6.0' Type of Liner= Class I Rip-Rap Geotextile ( Not to Scale) FROM STA. 49+00 TO STA. 52+40 LT -L- FROM STA. 24+00 TO STA. 26+00 LT -Y1RT- Point Shoulder Point Shoulder DETAIL J Flatter4:1 or Flatter 3:1 or SPECIAL CUT V DITCH ( Not to Scale) LATERAL BASE DITCH 2:1D B b d 2:1 1"/Ft. FROM STA. 44+37 TO STA. 45+45 LT -L- FROM STA. 41+50 TO STA. 42+28 LT -L- DETAIL C b= 5 Ft. B= 2 Ft. Max. d= 1 Ft. Min. D= 1 Ft. *When B is < 6.0' Type of Liner= Class B Rip-Rap Ground Natural Slope Fill GEOTEXTILE ( Not to Scale) LATERAL BASE DITCH 2:1D B b d 2:1 1"/Ft. FROM STA. 41+20 TO STA. 41+50 LT -L- FROM STA. 23+38 TO STA. 24+77 RT -L- DETAIL P b= 5 Ft. B= 2 Ft. Max. d= 1 Ft. Min. D= 1 Ft. *When B is < 6.0' Type of Liner= Class II Rip-Rap Ground Natural Slope Fill GEOTEXTILE D ( Not to Scale) B DETAIL U Ground Natural Point Shoulder STREAM STABILIZATION Type of Liner= Class 'I' Rip-Rap b 1"/Ft.1"/Ft. b 2:1 2:1 Matting Coir Fiber Embedded Energy Dissipator Riffles at Interval on PSH 1:1 Rock Plating EST. 440 TONS; 540 SY COIR FIBER MATTING FROM STA. 43+89 TO STA. 46+50 -L- RT *When B is < 6.0' b= 1 Ft. B= 2 Ft. Min. D= 2 Ft. OR FL ATTE R 1.7:1 D ( Not to Scale) B d DETAIL X Ground Natural Point Shoulder STREAM STABILIZATION Type of Liner= Class 'I' Rip-Rap b 1"/Ft.1"/Ft. b 2:1 2:1 Matting Coir Fiber Matting Coir Fiber d Embedded Energy Dissipator Riffles at Interval on PSH *When B is < 6.0' b= 4 Ft. B= 2 Ft. Max. d= 5 Ft. Min. D= 2 Ft. 2:1 2:1 EST. 125 TONS; 160 SY COIR FIBER MATTING FROM STA. 52+87 TO STA. 53+61 -L- RT D ( Not to Scale) B d DETAIL Y Ground Natural Point Shoulder STREAM STABILIZATION Type of Liner= Class 'I' Rip-Rap 1"/Ft. b 2:1 2:1 Matting Coir Fiber Matting Coir Fiber Embedded Energy Dissipator Riffles at Interval on PSH *When B is < 6.0' b= 5 Ft. B= 2 Ft. Max. d= 5 Ft. Min. D= 2 Ft. 2:1 EST. 100 TONS; 130 SY COIR FIBER MATTING FROM STA. 53+61 TO STA. 54+55 -L- RT FROM STA. 67+58 TO STA. 67+75 LT -L- FROM STA. 21+70 TO STA. 24+60 RT -L- Fill Slope1.5:1 or Flatter b= 1 Ft. d= 1 Ft. Type of Liner= Class B Rip-Rap b DETAIL N Ground Natural ( Not to Scale) TOE PROTECTION d Geotextile FROM STA. 14+05 TO STA. 28+30 LT -Y1LT- FROM STA. 21+50 TO STA. 25+00 RT -Y1RT- FROM STA. 74+00 TO STA. 76+66 LT -L- FROM STA. 60+00 TO STA. 66+50 RT -L- FROM STA. 66+80 TO STA. 67+56 LT -L- FROM STA. 51+60 TO STA. 66+80 LT -L- FROM STA. 52+50 TO STA. 53+50 RT -L- FROM STA. 29+20 TO STA. 34+50 RT -L- DETAIL D BEHIND RETAINING WALL CONCRETE DITCH ~ SEIRAV 1:2 ( Not to Scale) GROUND NATURAL WALL RETAINING BREAKER BOND B= 2.0' D= 1.0' 2: 1 b ( Not to Scale) D2: 1 2:1 BERM 'V' DITCH FROM STA. 14+98 TO STA. 17+80 RT -L- DETAIL B Ground Natural RDWY d Type of Liner= Excelsior Matting b= 5 Ft. Max. d= 1 Ft. Min. D= 1 Ft.4: 1 D B ( Not to Scale) SPECIAL CUT BASE DITCH Flatter4:1 or FROM STA. 80+00 TO STA. 80+91 RT -L- DETAIL R B= 2 Ft. Min. D= 1 Ft. Ground Natural Slope Ditch Front ( Not to Scale) BERM BASE DITCH 2: 1 2:1 D 2:1B b FROM STA. 24+30 TO STA. 25+00 LT -L- DETAIL O b= 5 Ft. B= 2 Ft. Min. D= 1 Ft. Ground Natural RDWY ( Not to Scale) BERM BASE DITCH 2: 1 2:1 D2:1B b d FROM STA. 26+65 TO STA. 27+70 LT -L- DETAIL E b= 5 Ft. B= 2 Ft. Max. d= 1 Ft. Min. D= 1 Ft. Type of Liner= Class 'B' Rip-Rap Ground Natural RDWY GEOTEXTILE D ( Not to Scale) B d DETAIL T Ground Natural Point Shoulder STREAM STABILIZATION Type of Liner= Class 'I' Rip-Rap b 1"/Ft.1"/Ft. b 2:1 2:1 Matting Coir Fiber Matting Coir Fiber Embedded Energy Dissipator Riffles at Interval on PSH *When B is < 6.0' b= 1 Ft. B= 2 Ft. Max. d= 5 Ft. Min. D= 2 Ft. 2:1 1:1 Rock Plating EST. 160 TONS; 200 SY COIR FIBER MATTING FROM STA. 42+95 TO STA. 43+89 -L- RT D ( Not to Scale) B d DETAIL V Ground Natural Point Shoulder STREAM STABILIZATION Type of Liner= Class 'I' Rip-Rap b 1"/Ft.1"/Ft. b 2:1 2:1 Matting Coir Fiber Matting Coir Fiber d Embedded Energy Dissipator Riffles at Interval on PSH *When B is < 6.0' b= 3 Ft. B= 2 Ft. Max. d= 5 Ft. Min. D= 2 Ft. 2:1 2:1 EST. 1070 TONS; 1300 SY COIR FIBER MATTING FROM STA. 46+50 TO STA. 52+87 -L- RT SHEET __ OF __ PERMIT DRAWING ENGINEER SHEET NO.PROJECT REFERENCE NO. 3D-3 8/17/99ROADWAY DESIGN REVISIONS PENTABLE:FILE:NCDOT\NCDOT-B3186_TO2_c_\6.0_CAD_BIM\6.2_Work_In_Progress\B-3186-B-5898\Hydraulics\PERMITS_Environmental\Drawings\B3186-B5898_PRM_DETAILS.dgnUSER:CMYERSDATE:5/11/2021NCDOT_pdf_color_eng_100.pltPLOT DRIVER:5:50:58 PMTIME:NCDOT_permits_CON.tblDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 B-3186 / B-5898 CC A A B BFLOW{PLAN VIEW ELEVATION POINT BANK TOP OF TOE RIFFLE HEAD OF RIFFLE TOE OF FILTER FABRIC STATION 43+32 RT -L- 44+45 RT -L- 44+95 RT -L- 45+45 RT -L- 46+45 RT -L- 47+45 RT -L- 48+45 RT -L- 53+90 RT -L- 52+45 RT -L- 52+45 RT -L- 51+95 RT -L- 51+45 RT -L- 50+95 RT -L- 49+45 RT -L- 54+34 RT -L- 54+11 RT -L- ELEVATION R IFFLE MATTING (TYP) COIR FIBER TOE SECTION C-C SECTION B-B SECTION A-A max 1/3 D MATTING (TYP.) COIR FIBER FABRIC FILTER MINIMUM 3' RIFFLE HEAD OF 2 FT (TYP.) 2 FT (TYP.) RIFFLE TAIL OF OF (50%) CLASS "B" AND (50%) CLASS "I". " NOM. THICKNESS WELL GRADED MIX (50%) CLASS "I" GRADED MIX OF (50%) CLASS "B" AND "NOM. THICKNESS WELL STREAM BED BURY CLASS II RIP RAP 2' BELOW BED (TYP.) CENTER CLASS II 2"-4" ROCK FOOTER (SEE NOTE FOR SIZE) CLASS II RIP RAP ENERGY REDUCTION RIFFLE 2586.9 FT 2585.6 FT 2584.6 FT 2580.9 FT 2579.5 FT 2578.0 FT 2576.6 FT 2575.3 FT 2573.9 FT 2572.8 FT 2571.8 FT 2570.6 FT 2569.3 FT 2568.5 FT 2568.0 FT 2566.3 FT = 4-6 FT Length (TYP) Riffle BENCHES. SEE STREAMBANK REFORESTATION DETAIL. OPTION FOR INCLUDING LIVE STAKES ON FLOODPLAIN IMPEDE AQUATIC ORGANISM PASSAGE EACH STRUCTURE EMBEDDED IN ORDER TO NOT PER STRUCTURE ON PLANS SEE TABLE FOR ELEVATION POINT DATA 2' DIAMETER OR SHOT ROCK, ANGULAR AND OBLONG, TYPICAL DIMENSION CLASS II RIP RAP SHOULD BE NATIVE STONES NOTE 44+12 RT -L-2567.8 FT 50+43 RT -L-2574.34 FT SHEET __ OF __ PERMIT DRAWING REINFORCEMENT BAR #10 STEEL 12" 1" 24" 4" 1" STAPLE 1" (nominal) DIAMETER BEND 4" WOODEN STAKE 2" x 2" (nominal) BACKFILLMATTING COIR FIBER GROUND EXISTING FLOODPLAIN/ TO NWSEL EXTEND MATTING OF FLOW DIRECTION IN TRENCH MATTING AND BACKFILLED PLACED IN TRENCH MATTING SHALL BE COIR FIBER MATTING DETAIL ANCHOR OPTIONS PLAN VIEW TYPICAL CROSS SECTION NOT TO SCALE STREAM BED { ON 1' CENTERS ANCHOR TRENCH ON 1' CENTERS ANCHOR OVERLAP 3' CENTERS ANCHORS ON 6" OVERLAY(MIN) (TYP) 18" 3' CENTERS ANCHORS ON 6" MIN IN TRENCH 1' CENTERS ANCHORS ON 12-24" 1-2" 1-2" 1' CENTERS ANCHORS ON 1' CENTERS ANCHORS ON 1' CENTERS ANCHORS ON HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. B-3186 / B-5898 3D-4 SEE DETAIL 3D-1 FOR ROCK PLATING STREAM SLOPES SHEET __ OF __ PERMIT DRAWING HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. SEE PLAN SHEETS FOR AREAS TO BE PLANTED DIBBLE PLANTING METHOD firming soil at top. 5. Push handle forward PLANTING NOTES: N.C.D.O.T. - ROADSIDE ENVIRONMENTAL UNIT correct depth. and place seedling at 2. Remove planting bar USING THE KBC PLANTING BAR PLANTING DETAILS MIXTURE, TYPE, SIZE, AND FURNISH SHALL CONFORM TO THE FOLLOWING: toward planter. as shown and pull handle 1. Insert planting bar root systems from drying. container to prevent the canvas bag or similar shall be kept in a moist During planting, seedlings PLANTING BAG soil at bottom. toward planter, firming 4. Pull handle of bar thoroughly. hole open. Water 6. Leave compaction PAID FOR AS "STREAMBANK REFORESTATION" NOTE: TYPE 1 AND TYPE 2 STREAMBANK REFORESTATION SHALL BE STREAMBANK REFORESTATION TYPE 1 50% CORNUS AMOMUM 50% SALIX NIGRA SILKY DOGWOOD BLACK WILLOW TYPE 2 TYPE II TYPE I FT. STREAM STREAMBANK REFORESTATION TYPICAL 8 FT. 4 from seedling. 2 inches toward planter 3. Insert planting bar 1 inch thick at center. 4 inches wide and be 12 inches long, cross section, and shall blade with a triangular Planting bar shall have a KBC PLANTING BAR root collar. 10 inches below the no roots extend more than pruned, if necessary, so that All seedlings shall be root ROOT PRUNING 2 inch 25% BETULA NIGRA 25% PRUNUS SEROTINA 25% PLATANUS OCCIDENTALIS 25% LIRIODENDRON TULIPIFERA 12 in - 18 in BR 12 in - 18 in BR 12 in - 18 in BR 12 in - 18 in BR RIVER BIRCH BLACK CHERRY SYCAMORE TULIP POPLAR BAREROOT PLANTING DETAILLIVE STAKES PLANTING DETAIL BUDS (FACING UPWARD) ANGLE CUT 30°-45° SQUARE CUT GROUND EXISTING/PROPOSED LIVE STAKES BANK STABILIZATION WITH LIVE STAKES LIVE STAKE COIR FIBER MAT (1/2"-2" DIAMETER) LIVE CUTTING 2 - 3 Feet 2 ft - 3 ft LIVE STAKES 2 ft - 3 ft LIVE STAKES STREAMBED EXISTING/PROPOSED APPROXIMATELY 2724 PLANTS PER ACRE. ON CENTER, RANDOM SPACING, AVERAGING 4 FT. ON CENTER, TYPE 1 STREAMBANK REFORESTATION SHALL BE PLANTED 3 FT. TO 5 FT. APPROXIMATELY 680 PLANTS PER ACRE. ON CENTER, RANDOM SPACING, AVERAGING 8 FT. ON CENTER, TYPE 2 STREAMBANK REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT. OF LIVE STAKE IS WITHIN GROUND LIVE STAKES SHALL BE DRIVEN UNTIL APPROXIMATELY 3/4 ON CENTER LIVE STAKES SHALL BE SPACED APPROXIMATELY 4 FEET NOTE: B-3186 / B-5898 3D-5 DETAIL SHEET 1 OF 1 STREAMBANK REFORESTATION 18" CMP 24" CMP DI DI DI DI 15" CMP 15" CMP24" HDPE 48" CMP 18" HDPE PAVED DITCHDI DIGRGR RR TIES BENCH CONC WOODS BST BST BSTBSTBST1SFD GR GR GR GR4' WW & 1SBW 5' WW & 1SBW 4' WW & 1SBW GRGR GR 1SMTL BUS GRCONC 5' WW & 1SBW WOODS GRMTL GUARD RAIL MTL GAURD RAIL MTL GAURD RAIL CONC CONC BATHROOM WOOD FRAME 24" DI 24" DI 24" DI24" DI US 23/74 (WEST BOUND) S s 28" WALNUT 18" WALNUT 50' DUKE POW ER CO. EASEM ENT50' DUKE POW ER CO. EASEM ENT4' WD RAIL60110 2577.35 WOODS WOODS WOODS WOODS HEDGE WOODS W OODSHEDGE HEDGEHEDGE WOODS WOODS GOLF COURSE GOLF COURSE 4" PVCUS 23/74 (EAST BOUND) FROM CITTY OF WAYNESVILLE PER HAND DRAWN REFFERENCE APPROXIMATE LOCATION OF SEWER LINE SHEET __ OF __ PERMIT DRAWING SEE SHEET 6A LEGEND -L- CS Sta. 36+26.50 -L- ST Sta. 39+62.50 35+00 40+00 35+00 40+00 45+00 -L_RT- CS Sta. 36+07.43 -L_LT- CS Sta. 36+28.46 -L_LT- ST Sta. 39+64.46 -L_RT- ST Sta. 39+43.43 -L_RT- TS Sta. 44+95.45 -L RT- -L LT - -L - -L- -L RT- -L LT- 45+00 35+00 40+00 45+00NAD 83/ 2011 1 3 2 F F F FC C C F c c F 35+00 40+00 45+00 35+00 40+00 45+00 0706050202020201000102030405B-77 B-77 BEGIN WALL +30 -DET01_EB- BEGIN SFB +89 -DET01_EB- B-77 B-77 B-77 +00(TYP) 25' (TYP) 25' END WALL END SFB +83.83 -DET01_EB- TEMP BRIDGE 41+05 BEGIN TEMP BRIDGE 44+05 END 2559 2560256025602561256125612561256125622562256225622562 256225622562256225632563 25632563256325632564256425642564256425642 5 6 4 25642565256525652565256525652 5 6 5 25652565256 52565256525652565 2565256525652565 25662566256625662566 25662566256625662 5 6 6 2566256625662566256625662566 2566 2566 2567256725672567 256725672567256725672567 256725672567 2567256725672567 2 5 6 7 25672567 25672567256725672567256725672568 25682568 25682568 25682 5 6 8 25682568256825682568256825682568 25682568256825682568256825682568256825682568256825682568256925692569 2 5 6 9 256925692569 256925692569256925692569 25692 5 6 92569 2569 25692569 25692569 2569256925692569 256925702570257025702570 2570 2570 25702570 257025702570 25702570 257025702570257025702570257025702570 2 5 7 0 25702 5 70 2 5 7 0 25702 5 70 25702571 257125712571 257125712571 2571 257125712571257125712571257225722572 2572 2572 25722572 2572 2572257225722572 257225722572 257325732573 2573 2573 2573 25732573 2573 2573257325732573257325732574257425742574 2574 2574 257425742 5 7 4 25742574257425742574 25742574257525752575257525752575 2575 257525752575 2575 2575 2575 257525752575 257525752575 2575 25752575257525752575257525752575257525752 5 7 5 2575 257525762576 2 5 7 6 257625762576 2576 257625 7625762576 25762576257625762576257 6 25762576 257625772577 2 5 7 7 2577 257725772577 25772577 2577 25772577 2577 257725772577257725772577 257 725772577 2577257825782578 2578 2578 25782578 2578 2578 2578 2578 2578 2578257825782578 257825782578 2579257925792579 257925792579 2579 25792579 2579 257925792579257925792579 2579257925792580258025802580 258025802580 2580 25802580 25802580 2580 2580 258025802580 25802580 2580 2580258025802580258025802 5 8 0 258025802580 25802580 2580 258025812581 25812581 2581 25812581 25812581 2581 25812581258125812582258225822582 2582 2582 2582 25822582 2582 2582258225822582 2582 2583258325832583 2583 2583 2583 25832 58 32583 2583 2583 25832583258325832583 25832584258425842584 2584 25842584258425842584 2584 25842584258425852585258525852585258525852585 2585 2585 2585 2585258525852585 25852585 2585 2585 2585 2585258525852585 258525852585258525852586258625862586 2586 258625862586 2586 2 5 86 2586258625862586258625862586 258625 8625872587258725872587 2587 2587258725872587 2587 25872587 25872587 2587258725872587 258725882588258825882588 2588 2588258825882588 2588 258825892589258925892589 2589 2589258925892589 2589 2590259025902590259025902590 2590 2590 2590 2590 2590 25902590 25902590 25902590 2590 2590 25902590 2591259125912591 2591 2591 2591259125912591 2591259225922592259225922592 2592259225922592 2592 259325932593259325932593 2593259325932593 25932593259425942594259425942594 2594 2594 2594 25942594259525952595259525952595259525952595 2 595 2595 2595 2595 2595 25952595 259525952595 2595 259525952595 2596259625962596259625 96 2596 2596 2596 2596 2596 25962 5 9 6 2596259725972597 25972597 2597 2597259725972597 2 5 9 7 259725982598259825982598 2598 2598 2598 2598 2598 2598 25 9825982599 2599259925992599 2599 2599 2599 2599 25992599 259925992600260026002600260026002600260026002600 2 600 2600 2600 2600 26002600 260026002600260 02600 2600 260026002601260126012601 2601 26012601 26012 60 12601 260126012601260226022602 2602 2602260226022602 2 6 0 2 2602260226022602260326032603 2603260326032 6 0 3 26032603 260 32 60 3 260326042604260426042604 260426042604 2604 26052605260526052605260526052605 26052605 26052605260526052605260526052605 260526062606260626062606 2606 260626062606260626072607260726072607 2607 26072607 260726072608260826082608 2608 2608 2608 260826082609260926092609 2609260926092 6 0 9 2609 261026102610261026102610 2610 2610 261026102610261026102610 26102610 26 10 2611261126112611 2611 26112611 261126112612261226122612 2612261226122612 2612 2613261326132613 2613261326132613 2613 2614261426142614 261426142614 2614 261526152615261526152615 2615 2615 26152615 2615261526152615 2 6 1 5 2615 2615 2616261626162616 261626162616 2616 2617261726172617 261726172617 2617 2618261826182618 2618261826182618 2618 261926192619 2619 2619 26192619 261926 1926202620262026202620 2620 26202620262026202620 2620 2 6 2 02620 262126212621 2621262126212621 262226222622 26222622 2622 2622 262326232623 262326232623 2623 262426242624 2624262426242624 26252625262526252625 2625 26252625262526252625 2625 2 62 5 26262626 2626 262626262626 262726272627 262726272627 262826282628 2628262826282628 262926292629 26292 629 2629 2630263026302630 263026302630 26302630 2630 26312631263126312631263226322 63 2 263226322632 2633263326332633263326342634 263426342634 263526352635 2635 263526352635 2635263526362636 26362636263726372637 2637 263726382638 2638 2638 2638263926392639263926402640 2640 26402640 2 6 4 0 2640264026412641 2641 26412642264226422642 26422643 26432643 26442644 2644 26452645 264526452645 2 64 5 2646264626 4 62647264726 4 72648 2648264 8264926492 649 265026502650 26512652265326542655265526552656265726582659266026602661266226632664 26 65 2665266626672668266926702672 6 MATCHLINE -L- STA. 31+00, SEE SHEET 5 MATCHLI NE -L- STA. 45+00, SEE SHEET 7FOR -L_RT- PROFILE, SEE PROFILE SHEET 12 & 13 FOR -L_LT- PROFILE, SEE PROFILE SHEET 12 & 13 SEE SHEET 3D-2 FOR DRAINAGE DITCH DETAILSNAD 83/ 2011 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.REVISIONS PENTABLE:FILE:NCDOT\NCDOT-B3186_TO2_c_\6.0_CAD_BIM\6.2_Work_In_Progress\B-3186-B-5898\Hydraulics\PERMITS_Environmental\Drawings\B3186-B5898_PRM_WET_PSH.dgnUSER:TCARTERDATE:5/12/2021Hydro_color_pdf.pltcfgPLOT DRIVER:3:57:39 PMTIME:NCDOT_permits_CON.tbl DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 B-3186 / B-5898 BEG WW FENCE S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY RICHLAND CREEK RICHLAND CREEK2GI 2GI 2GI REMOVE RE M O VE REMOVE REMOVE SYSTEM EST. 5 TONS CLASS 'I' RIP RAP 14 SY GEO-TEXTILE RETA IN RETAIN RETAIN2GI 2GI 2GI 18" RCP-IV 18" RCP-IV 18" RCP-IV 18" RCP-IV 24" RCP-IV 18" RCP-IV W/ ELBOWS18" CSPW/ ELBOWS 18" CSP W/ ELBOWS 18" CSP18" RCP-IV 18" RCP-IV EST. 3 TONS CLASS 'I' RIP RAP 10 SY GEO-TEXTILE RETAINFROM STA. 43+74 TO STA. 44+10 LT. FROM STA. 43+31 TO STA. 43+55 LT. FROM STA. 42+02 TO STA. 42+26 LT. 6" DIAMETERS ON 12' CENTERS FROM STA. 43+18 TO STA. 43+42 RT. FROM STA. 42+69 TO STA. 42+93 RT. FROM STA. 41+34 TO STA. 41+58 RT. 6" DIAMETERS ON 12' CENTERS DECK DRAINS REQUIRED - WB DECK DRAINS REQUIRED - EB TB 2GITB 2GI TB 2GI TB 2GI TB 2GI TB 2GI TB 2GI EST. 5 TONS CLASS 'I' RIP RAP 14 SY GEO-TEXTILE W/ ELBOWS 24" CSP 24" RCP- I VDETAIL 'D' SEE SHEET 3D-2 BEHIND RETAINING WALL CONCRETE DITCH DETAIL C SEE SHEET 3D-2 62 SY GEOTEXTILE EST 19 TONS W/CLASS 'B' RIPRAP 2' LATERAL BASE DITCH DETAIL C SEE SHEET 3D-2 126 SY GEOTEXTILE EST 43 TONS W/CLASS 'B' RIPRAP 2' LATERAL BASE DITCH DETAIL U SEE SHEET 3D-2 STREAM STABILIZATION SEE SHEET 3D-3 ENERGY DISSIPATOR RIFFLE DISCHARGE INCREASE = 0.61% OUTLET LOCATION 42+94 -L- RT PRE VS POST DISCHARGE FOR PRE VS. POST SITE 5: SEE SHEET 3D-2 DETAIL L DECK DRAIN DISSIPATOR PAD 2GI-A 2GI-A JB w/MH RCP-IV 18" DDE=69 CY DETAIL P SEE SHEET 3D-2 40 SY GEOTEXTILE EST 23 TONS W/CLASS 'II' RIPRAP 2' LATERAL BASE DITCH DDE=133 CY DETAIL T SEE SHEET 3D-2 STREAM STABILIZATION 2GI TB REMOVE RCP-IV 18" REMOVEREMOVERCP- I V24"F LOWABLE FI LLFI LL WI TH DDE=171 CY DETAIL F SEE SHEET 3D-2 LATERAL BASE DITCH SEE SHEET 3D-2 DETAIL L DECK DRAIN DISSIPATOR PAD W/ELBOWS18" CSP2GI SITE 3 SITE 1 SITE 2 S C C F F F F 18" CMP 24" CMP DI DI DI DI 15" CMP 15" CMP24" HDPE 48" CMP 18" HDPE PAVED DITCHDI DIGRGR RR TIES BENCH CONC WOODS BST BST BSTBSTBST1SFD GR GR GR GR4' WW & 1SBW 5' WW & 1SBW 4' WW & 1SBW GRGR GR 1SMTL BUS GRCONC 5' WW & 1SBW WOODS GRMTL GUARD RAIL MTL GAURD RAIL MTL GAURD RAIL CONC CONC BATHROOM WOOD FRAME 24" DI 24" DI 24" DI24" DI US 23/74 (WEST BOUND) S s 28" WALNUT 18" WALNUT 50' DUKE POW ER CO. EASEM ENT50' DUKE POW ER CO. EASEM ENT4' WD RAIL60110 2577.35 WOODS WOODS WOODS WOODS HEDGE WOODS W OODSHEDGE HEDGEHEDGE WOODS WOODS GOLF COURSE GOLF COURSE 4" PVCUS 23/74 (EAST BOUND) FROM CITTY OF WAYNESVILLE PER HAND DRAWN REFFERENCE APPROXIMATE LOCATION OF SEWER LINE SHEET __ OF __ PERMIT DRAWING SEE SHEET 6A LEGEND -L- CS Sta. 36+26.50 -L- ST Sta. 39+62.50 35+00 40+00 35+00 40+00 45+00 -L_RT- CS Sta. 36+07.43 -L_LT- CS Sta. 36+28.46 -L_LT- ST Sta. 39+64.46 -L_RT- ST Sta. 39+43.43 -L_RT- TS Sta. 44+95.45 -L RT- -L LT - -L - -L- -L RT- -L LT- 45+00 35+00 40+00 45+00NAD 83/ 2011 1 3 2 F F F FC C C F c c F 35+00 40+00 45+00 35+00 40+00 45+00 0706050202020201000102030405B-77 B-77 BEGIN WALL +30 -DET01_EB- BEGIN SFB +89 -DET01_EB- B-77 B-77 B-77 +00(TYP) 25' (TYP) 25' END WALL END SFB +83.83 -DET01_EB- TEMP BRIDGE 41+05 BEGIN TEMP BRIDGE 44+05 END 6 MATCHLINE -L- STA. 31+00, SEE SHEET 5 MATCHLI NE -L- STA. 45+00, SEE SHEET 7FOR -L_RT- PROFILE, SEE PROFILE SHEET 12 & 13 FOR -L_LT- PROFILE, SEE PROFILE SHEET 12 & 13 SEE SHEET 3D-2 FOR DRAINAGE DITCH DETAILSNAD 83/ 2011 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.REVISIONS PENTABLE:FILE:NCDOT\NCDOT-B3186_TO2_c_\6.0_CAD_BIM\6.2_Work_In_Progress\B-3186-B-5898\Hydraulics\PERMITS_Environmental\Drawings\B3186-B5898_PRM_WET_PSH.dgnUSER:TCARTERDATE:5/12/2021Hydro_color_pdf.pltcfgPLOT DRIVER:3:58:12 PMTIME:NCDOT_permits_NOCON.tbl DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 B-3186 / B-5898 BEG WW FENCE S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY RICHLAND CREEK RICHLAND CREEK2GI 2GI 2GI REMOVE RE M O VE REMOVE REMOVE SYSTEM EST. 5 TONS CLASS 'I' RIP RAP 14 SY GEO-TEXTILE RETA IN RETAIN RETAIN2GI 2GI 2GI 18" RCP-IV 18" RCP-IV 18" RCP-IV 18" RCP-IV 24" RCP-IV 18" RCP-IV W/ ELBOWS18" CSPW/ ELBOWS 18" CSP W/ ELBOWS 18" CSP18" RCP-IV 18" RCP-IV EST. 3 TONS CLASS 'I' RIP RAP 10 SY GEO-TEXTILE RETAINFROM STA. 43+74 TO STA. 44+10 LT. FROM STA. 43+31 TO STA. 43+55 LT. FROM STA. 42+02 TO STA. 42+26 LT. 6" DIAMETERS ON 12' CENTERS FROM STA. 43+18 TO STA. 43+42 RT. FROM STA. 42+69 TO STA. 42+93 RT. FROM STA. 41+34 TO STA. 41+58 RT. 6" DIAMETERS ON 12' CENTERS DECK DRAINS REQUIRED - WB DECK DRAINS REQUIRED - EB TB 2GITB 2GI TB 2GI TB 2GI TB 2GI TB 2GI TB 2GI EST. 5 TONS CLASS 'I' RIP RAP 14 SY GEO-TEXTILE W/ ELBOWS 24" CSP 24" RCP- I VDETAIL 'D' SEE SHEET 3D-2 BEHIND RETAINING WALL CONCRETE DITCH DETAIL C SEE SHEET 3D-2 62 SY GEOTEXTILE EST 19 TONS W/CLASS 'B' RIPRAP 2' LATERAL BASE DITCH DETAIL C SEE SHEET 3D-2 126 SY GEOTEXTILE EST 43 TONS W/CLASS 'B' RIPRAP 2' LATERAL BASE DITCH DETAIL U SEE SHEET 3D-2 STREAM STABILIZATION SEE SHEET 3D-3 ENERGY DISSIPATOR RIFFLE DISCHARGE INCREASE = 0.61% OUTLET LOCATION 42+94 -L- RT PRE VS POST DISCHARGE FOR PRE VS. POST SITE 5: SEE SHEET 3D-2 DETAIL L DECK DRAIN DISSIPATOR PAD 2GI-A 2GI-A JB w/MH RCP-IV 18" DDE=69 CY DETAIL P SEE SHEET 3D-2 40 SY GEOTEXTILE EST 23 TONS W/CLASS 'II' RIPRAP 2' LATERAL BASE DITCH DDE=133 CY DETAIL T SEE SHEET 3D-2 STREAM STABILIZATION 2GI TB REMOVE RCP-IV 18" REMOVEREMOVERCP- I V24"F LOWABLE FI LLFI LL WI TH DDE=171 CY DETAIL F SEE SHEET 3D-2 LATERAL BASE DITCH SEE SHEET 3D-2 DETAIL L DECK DRAIN DISSIPATOR PAD W/ELBOWS18" CSP2GI SITE 3 SITE 1 SITE 2 S C C F F F F 18" CMP DI DI 15" CMP 15" CMP24" HDPE 48" CMP 18" HDPEBSTGR GRGR 1SMTL BUS GRCONC 5' WW & 1SBW WOODS GR CONC BATHROOM WOOD FRAME 24" DI 24" DI24" DI US 23/74 (WEST BOUND) S s 4' WD RAIL60110 2577.35 WOODS HEDGE WOODS HEDGEHEDGE WOODS WOODS S 12°38'42" E174.56'S 05°04'13" W64.91'15.86'S 48°58'40" E182.90'S 40°48'40" E146.43'S 41°12'06" W 193.26'S 48°53'48" E111.65'S 48°59'06" E90.60' N 41°06'12" E 275.74' EIP NAIL4" PVCDAVID I. HEITZ DB 592 PG 2339 DB 511 PG 549 US 23/74 (EAST BOUND) STEPHEN B. KIDD LEGEND SHEET __ OF __ PERMIT DRAWING 6A 3 2 40+00 45+00 40+00 45+00 -DET01 WB- ST Sta. 39+42.94 -DET01 EB- PT Sta. 40+18.53 0202020201000102030405B-77 BEGIN WALL +30 -DET01_EB- BEGIN SFB +89 -DET01_EB- B-77 B-77 B-77 +00(TYP) 25' TEMP BRIDGE 41+05 BEGIN TEMP BRIDGE 44+05 END256025612561 256125612562256225622562 25622562256225622563 256325632563256325642564256425642564256425652565256525652 5 6 5 256525652565256525652566 2566256625662566256625662566256625662566 2566 256725672567 25672567256725672567 2567256725672567 2 5 6 7 2567 256725672567256725682568 256825682568256825682568 256825682568256825682568256825682568256825682568256925692569 2 5 6 9 256925692569256925692569 25692569 25692569 25692569256925692569 25692570257025702570 2570 2570 25702570257025702570257025702570 2 5 7 0 257025 7 02570 257125712571 257125712571257125722572 2572 2572 257225722572257225732573 2 5 7 3 2573 25732573257325732573257325742574 2574 2574 2574257425742574257425752575 2575 257525752575 2575 2575 25752575257525752575257525752575 2575 2 5 7 6 257625762576 2576257625762576 25762576 2576 2 5 7 7 2577 257725772577 25772577 2577 257725772577257725772577 2577 2 5 7 8 2578 2578 25782578 2578 257825782578 257825792579 257925792579 257925792579 25792579 258025802580 2580 25802580 25802580 2580 258025802580258025802580 2580 25812581 25812581 2581258125822582 2582 2582 2582258225822583 2583 2583 2583 25832583258325842584 2584258425842584258525852585 2585 2585258525852585 258525852585258525862586 25862586258625862586 258625872587 25872587 25872587 2587258725872587 258725882588 258825892589 25902590 2590 2590 2591 2591 25922592 259325932594259425952595 2 5 9 5 259625962 5 9 6 2596 25972597 25972598 2598 259925992600 26002600 2 6 0 0 260126022602 2 6 0 3 w/Slab Lid TB JB w/Slab Lid TB JBT0 T1 T3 T5 T6 42" RCP-IV FS T7RCP- I V 18" T32 T33EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEO-TEXTILE RETAIN RETAINRETAINDETAIL 01 DISSIPATOR PAD DECK DRAIN 18" CSP EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEO-TEXTILE T2 T37 T38 2GI-A ON BANKS ONLY CLASS 'I' RIP RAP EST. 26 TONS 2GI JB w/SLAB LID FROM STA. 41+39 TO STA. 43+79 LT.FROM STA. 41+24 TO STA. 43+64 RT.6" DIAMETER PVC ON 12' CENTERSDECK DRAINS REQUIRED - EB 18" CSP42" RCP-IV 18" RCP-IV 2GI RCP-IV 42" 42" RCP-IV RCP-IV 42" DET01 EB DET01 WB 6 MATCHLINE -L- STA. 31+00, SEE SHEET 5 MATCHLI NE -L- STA. 45+00, SEE SHEET 7FOR -L_RT- PROFILE, SEE PROFILE SHEET 12 & 13 FOR -L_LT- PROFILE, SEE PROFILE SHEET 12 & 13 SEE SHEET 3D-2 FOR DRAINAGE DITCH DETAILSNAD 83/ 2011 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.REVISIONS PENTABLE:FILE:NCDOT\NCDOT-B3186_TO2_c_\6.0_CAD_BIM\6.2_Work_In_Progress\B-3186-B-5898\Hydraulics\PERMITS_Environmental\Drawings\B3186-B5898_PRM_WET_PSH.dgnUSER:TCARTERDATE:5/12/2021Hydro_color_pdf.pltcfgPLOT DRIVER:3:55:19 PMTIME:NCDOT_permits_CON FOR DETOUR SHEETS.tbl DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 B-3186 / B-5898 BEG WW FENCE S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY RICHLAND CREEK SITE 3 SITE 1 SITE 2 S F F F 18" CMP DI DI 15" CMP 15" CMP24" HDPE 48" CMP 18" HDPEBSTGR GRGR 1SMTL BUS GRCONC 5' WW & 1SBW WOODS GR CONC BATHROOM WOOD FRAME 24" DI 24" DI24" DI US 23/74 (WEST BOUND) S s 4' WD RAIL60110 2577.35 WOODS HEDGE WOODS HEDGEHEDGE WOODS WOODS S 12°38'42" E174.56'S 05°04'13" W64.91'15.86'S 48°58'40" E182.90'S 40°48'40" E146.43'S 41°12'06" W 193.26'S 48°53'48" E111.65'S 48°59'06" E90.60' N 41°06'12" E 275.74' EIP NAIL4" PVCDAVID I. HEITZ DB 592 PG 2339 DB 511 PG 549 US 23/74 (EAST BOUND) STEPHEN B. KIDD LEGEND SHEET __ OF __ PERMIT DRAWING 6A 3 2 40+00 45+00 40+00 45+00 -DET01 WB- ST Sta. 39+42.94 -DET01 EB- PT Sta. 40+18.53 0202020201000102030405B-77 BEGIN WALL +30 -DET01_EB- BEGIN SFB +89 -DET01_EB- B-77 B-77 B-77 +00(TYP) 25' TEMP BRIDGE 41+05 BEGIN TEMP BRIDGE 44+05 END w/Slab Lid TB JB w/Slab Lid TB JBT0 T1 T3 T5 T6 42" RCP-IV FS T7RCP- I V 18" T32 T33EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEO-TEXTILE RETAIN RETAINRETAINDETAIL 01 DISSIPATOR PAD DECK DRAIN 18" CSP EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEO-TEXTILE T2 T37 T38 2GI-A ON BANKS ONLY CLASS 'I' RIP RAP EST. 26 TONS 2GI JB w/SLAB LID FROM STA. 41+39 TO STA. 43+79 LT.FROM STA. 41+24 TO STA. 43+64 RT.6" DIAMETER PVC ON 12' CENTERSDECK DRAINS REQUIRED - EB 18" CSP42" RCP-IV 18" RCP-IV 2GI RCP-IV 42" 42" RCP-IV RCP-IV 42" DET01 EB DET01 WB 6 MATCHLINE -L- STA. 31+00, SEE SHEET 5 MATCHLI NE -L- STA. 45+00, SEE SHEET 7FOR -L_RT- PROFILE, SEE PROFILE SHEET 12 & 13 FOR -L_LT- PROFILE, SEE PROFILE SHEET 12 & 13 SEE SHEET 3D-2 FOR DRAINAGE DITCH DETAILSNAD 83/ 2011 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.REVISIONS PENTABLE:FILE:NCDOT\NCDOT-B3186_TO2_c_\6.0_CAD_BIM\6.2_Work_In_Progress\B-3186-B-5898\Hydraulics\PERMITS_Environmental\Drawings\B3186-B5898_PRM_WET_PSH.dgnUSER:TCARTERDATE:5/12/2021Hydro_color_pdf.pltcfgPLOT DRIVER:3:50:27 PMTIME:NCDOT_permits_CON FOR DETOUR SHEETS.tbl DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 B-3186 / B-5898 BEG WW FENCE S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY RICHLAND CREEK SITE 3 SITE 1 SITE 2 S F F F W DI DI DI CB HW HWHW HW DI CB CB30" CMP18" CMP18" CMP15" CMP24" CMP 24" CMP 24" CMP18" CMP24" CMP24" CMP24" C MP PAVED DITCH PAVED DITCH 5' WW & 1SBW 5' WW & 1SBWBSTBST5'WW & 1SBW 5'WW & 1S BWWOODS 18" RCPWOODSSHRUBS1SMTL BUS GR GR CONC 6' CHL & 3SBW1SF SWITCH BOXES ELECTRIC PANELS 1SMTL SATALITE DISH BST 18" C & G CONC SW 6" CHL & SBW GR CONC PAD WOODS WOODS BST BSTBST BST WOODS WOODS WOODS18" C & G 30" C & G CB CBCB 18" C & G LTLT LTLT LT LT LT LT 6" CONC CURB DI DI DI WOODS WOODS WOODS M TL GUARD RAI LM TL GUARD RAI LMTL GUARD RAI LM T L G U A R D R A IL MTL GUARD RAIL 18" CMP18" CMP 24" CONC C& G CONC CONC SW(EA S T B OUND )U S 2 3/7 4SS48" OAK RIP RAP METER POWER T5' CHL GATE GATE 6' CHL US 19( W EST BOUND) (EAST BOUND)US 19US 19( W EST BOUND) (EAST BOUND)US 1918" HDPEHI KORY HI LL ROAD16' BST16' BST30' DUKE POWER CO. EASEMENT30' DUKE POWER CO. EASEMENT30' DUKE POWER CO. EASEMENT30' DUKE POWER CO. EASEMENT1341819202 1 HEDGE HEDGE HEDGE HEDGE HEDGE HEDGE HEDGE WOODS WOODS DITCH PAVED US 23 /74 (WEST BOUND )WOODS HEDGE DI PAD CONC DUMPSTER WOODS 6" CHL & SBW SHEET __ OF __ PERMIT DRAWING -L- TS Sta. 46+11.55 -L- SC Sta. 49+47.55 -L- CS Sta. 54+04.47 50+00 55+00-L- TS Sta. 58+97.47 45+00 50+00 55+0025 +00 30+0035+00-L_LT- TS Sta. 46+20.74 -L_RT- SC Sta. 48+31.45 -L_LT- SC Sta. 49+56.74 -Y1LT- ST Sta. 26+65.97 -Y1LT- CS Sta. 24+65.97 -L_LT- CS Sta. 54+40.85 -L_LT- SRS Sta. 57+76.85 -L_RT- CS Sta. 55+30.36 -Y1RT- PCC Sta. 32+50.64 -L_RT- SRS Sta. 58+66.36 -Y1RT- CS Sta. 36+12.49 -L LT- -L RT- -L- -L- -L LT- -L RT- -Y1 R T--Y 1R T --Y1LT- -Y1LT- -L_LT- POS Sta. 56+11.71 36' LT -Y1LT- POT Sta. 33+16.69 = 45+00 -L- ST Sta. 57+40.47 -Y1RT- POC STA. 27+54.43 -L- POC STA. 49+91.10 = 45+00 50+00 55+0025+0030+00NAD 83/ 2011 3 4 6 7 5 cc c c c c c c c c 50+00 5 5 +00 50+00 5 5+0002010100030405060707060504 030202030302B-77 25' (TYP) 25'(TYP )25702570 2570 25712571 2571 25722572 2572 257325732573 257425742574 2574 2574 2575257525752575257525752575 2575 2575 2575 2575 2575 25752576257625762576 2 57 6 2576 25762576 2577257725772577 2577 25772577 257825782578257825782578 2 578 2578 25782579257925792579257925792579 25792579 25802580258025802580258025802 5 80 2580 2580 2580 258025802580 2580 258025802580 2580258025812581258125812581 2581 25 81 2581 258125812581 25812581 25812581 25822582258225822582 258225822582 258225822582 25 8 22582 2582258325832583258325832583 2583 2583 2583258325832583 258325832583 2583 2583258425842584258425842584258425842584 25842584 258425842584 2 5 8 4 2585258525852585258525852585258525852 58 525852585258525852585258525852585 2 5 8 5 2585 2585258525852585 2585 258525 8 5 2 58 52585 25852585 2585258625862586258625862586258625862586 2586 25862586258625862586 2586 2586 25862586 25872587258725872587258725872587258725872587 2 58 72587 2587 2 5 8 7 25872587258725872 5 8 7258725872587 25872587 2588258825882588 258825882588 25882588258825882 5 8 8 258825 8 8 25882588 2 5 8 8 258825882588 25882588 2588258925892589258925892589258925892589258925892589 2589 2589 2589 2589 2 5 8 9 2589 25892589 2589 2589 2589 25892589 25902590259025902590259025902590 25902590259025902590259025902590259025902590 25 90 2 5 9 02590 2590 2 5 9 0 2 5 9 0 2 5 9 0 259 0 259025902 5 9 0 25902590 25902590259025 902590259125912 5 9 1 25912591259125 912591 2 59 1 25 9 1 2 5 9 1 2591 25912591 259125912591 25912591259225922592 25922592259225922592259225922592 2 59 2 2592 2592 25922592 2 5 9 2 25922592 259325932 5 9 3 2593259325932593 2 5 9 3 2 5 9 3 2593 2593 2593 2593259325932593 25942594259425942594259425942594 2 5 9 4 2 5 9 4 2594 25942594 259425952595259525952 5 9 5 2595259525952595259525952595 2595 2 59 5 2 5 9 5 2 5 9 5 2 595 2595 2595 2595 25952595 2595 2595259525952596259625962596 25 9625962 5 9 6 2 5 9 6 2 5 9 6 25962596 259625962596 25962596 259725972597259725972 5 9 725972597259725972597 2597259725972597259825982598 259825982 5 9 82598259825982598259825982598 2598 25992599259925992 5 9 925 9 92 5 9 9 2599 2 5 9 9 2599 2599259925992 6 0 0 260026002600 2 6 0 0 260026002600260026002 6 0 02600260026002600 2 6 0 02600 26 0026002600 2600 26002600 2600260126012601260126012 6 0 1 2601 2 6 0 1 26012601260126012601 2601 260226022602 26022602260 2 2 6 0 2 2602 2 6 0 2260226022602 26022602 2603 26032603 26032603 2603 2603260326032603 2 6 0 3 2603 2604 26042 6 0 4 260426042604260426042604260 426042604 26042605 26052605260526052605 2605 2605 2 60 52 6 0 526052605260526052 6 0 5 2 60 52605260526052 6 0 5 2 6 0 5 2605260526052 605 26052605 26052606 260626062606260626062606260626 0626062 6 0 6 2606260626062 6 0 7 260726072607260726 07 2607 2 607 2 6 0 726072 6 0 7 26072607260 826082 608 26082608 2 608 2608 2 6 0 8 260826082 6 0 9 2609260926092 60 92609 2609 2609 260926092 6 0 9 26 1 0 26 1 0 2610261026102610 2 6 10 2 610 26102610 261026102610 2610 26102610 261026102 6 11 2 6 11 2611 261 1 2611261126 11261126112 612 2612 2612 261226122 6 12 2612 26122612 2612 2612261326132613 261326132613 2613 26132613261426 14 26142614 2 6 14 26142614 2614261426152 615 26152 6 152615 26152615 2615 26152 6 1 5 2615 26152615 2615 26152615 2 616 261626 16261626162616 26162 6 1 62617261726172 6 1 7 2617 2617 2617 26172618261826182 6 1 8 2618 2 618 261826182 6 19 261 92619261926 1 92619 2619 261926202 6 2 02620262026202 62 0 2 6 2026202620 2 62 0 2620 2620 2620 262026202620 2 6 2 1 26212621 26212621 2621 2621262226222 6 2 2 2 6 2 2 26222622 26222622 2 6 2 32623 26232623262 3 2623 2623262426242 6 2 4 262426242 6 2 4 2624 2624262526 2 5 2625262526252625262526 25262526252625 2625 2625 262526252 6 2 52626262626 2 6262 6262626262626 2 6 2 6262726272 6 2 7 2627262726272627 26272628262826282 6 2 8 262826282 6 2 826 2 9 26292 629 2629262926292629 2 62926302630263026302630263026302 6 3 0 26302630 263026302 630 2 6 3 0 2630263126312631263126312631 2631263126312632263226322632 2 6 3 2 2632 26322632 26322633 263326332633 26332633 2633 2 6 3 3 263326342634 2 634 2 6342634 26342634 26342 6 3 5 2 6 3 5 2635263526352 63 5 2635 2 6 35 26352635 2 6 3 5 26352635263526352636 263626362636 263626362636 26362637263726372637263726 3 7263726382 6 3 8 2638263826382638263826392639263926 392 6 3 9 2639263926 4 0 2640 2640264026402640 264 02640264026 402640264026402 6 4 1 26412641264126412641264126412641264226422 6 4 2 2642264226422642264226432643 26432643 264326432643 264326442644 264 4264426442644264426442645264526452 6 4 5 264526452645 2645264526452645 264526 45264526452 6 46264626462646 26462 6 4 6264626462 6 47 26472647264726 4 72647 2647 2647 2 6 4 8 26 4826482648 264826482648 2648 2649 26 492649264 9264926492649 2649 2650 2 6 5 0265026502 6 5 0 2650 2650 26502650265026502650 2 6 50 2650265026502650 2651265126512651 265126 5 126512 6 5 1265226522652265226522652 2 6 5 2 26522 6 5 2 2652 2 6 5 3 265326532 6 5 32653 265326532653265326532653265326532 6 5 42654 265426542 6 5 4 2 6 5 4 26542654 26542654265426542 6 5 5 2655 2 6 5 5 265526552655265526552655 26552655 26552 6 5 5 2655 26552 6 5 5 2 6 5526552655265526 5 526552656 2656265626562656 2656 2656 26562656265626562 65 7 265726572657 2 6 5 7 2657 2657 2657265726572657 265826582658265826582 6 5 8 26582658265826 582658 2 659 26592659265926592659 2659 265926592 6 5 9 2659 2 660 266026602660 26602660 26602660266026 6 02660 2660 2660 26602660266026602660266026612661 2 6 6 1 266126612661 2661266126622 6 62 2 6 6 2 2 66226622 66 226622662266326632663266 326632663 266326632664 26642 664266426642664 2664266426652665266526652665 266526652665 2665 2 6 6 5 2665 2665 2665 26652666 2666 2666266 6 2666266626662 6 6 7 2 6 6 7 2667266 7 2667266726672 6 6 8 26682668 2668266826682668 2 6 6 9 2669 2669266926692670 2670 2 67 0 2670 2670 267026 70267026702670267026712671 2671267126712672 2672 26722 6 72 26722673267326 732673 267326742674267426742674267426752675 26752675 2675 26752675 267526752675267526 762676 2676 2676 267626762 67 7 2677 2677 2677 2677267726782678 26782678267826792 67 9267926792679268026802680 2 6 8 026802680 2680 268026802680268026812 6 8 1 2 6 8 1 2681 268126812682268226822 68 2 2682 268226832683268326832683 268326842684268426842684 2684268526852685 268526852685 26852685 2685 2 68 52685268526852686268626862686 268626862687 26872687 2687 26 87 2 6 8 7 26872688 268826882688 26882688268926892689 2689 2689268926 9026902 6 9 0269026902690 2690 26902690 2690269026902691 269126912691 269126912692269226922692 269226922693269326932693 26932 6 9 3 26942694 2694 2 6 9 4 26942695 269526952 695 2695 2695 2695 26952695269526952695269626962696 269626962 6 9 6 269726972697 2697269726 972698269 82698 26982 6 9 8 2 6 98 2699269 92699 269926992 6 9 9 2700 270027 002700 2700 2700270027 00270 0270027012701 2701 27012701270 1 27022702 2702 270227022703 27032703 27032704 27042704 2704 270427052 7 05 2705 27052 70 52 705 2705 27052705270 52706 27062 70 62 7 0 6 2706 2707270727 07 2707 27072 707 27 08 27082708 2708 27082709 2709 2709 27092710 2 7 10 2710 27102710 2710 2 7 1 0 27102 7 10 2 7 11 27112 711 2711 2711 2 712 271227 12271 227 122713 2713 2713 2714 2714 271427152 7 15 2715 271527152 7152715 2716 2716 271627162717 271727172718 271827182719 27192719 27202720 2720 272027 202720 27 2 027212 7 2 1 2 7 2 1 27222 7 2 2 272227232723272327242 7 2 4 2724 272527252725272527252726 2 7 2 6 27262727272727282728 2 7 2 8 2728 27292729 2730 273027302730 2731273127312 7 3 1 27322732 2732 2732 2733273327342734 273527352735273527352736 273627362737 273727372 7 3 8 2738273827392739 273927402740 2740 2740274027412741 2741274227422743 2743274427442745 2745274527452 7 4 5 27462746 2746 27472747 2747 27482748 27492749275027502750 27512751FILL 1.8:1 STA 49+15.00FILL 2:1 STA 49+25.00MATCHLINE -L- STA. 45+00, SEE SHEET 6MATCHLINE -L- STA. 59+00, SEE SHEET 87 FOR -Y1LT- PROFILE, SEE PROFILE SHEET 17 & 18 FOR -Y1RT- PROFILE, SEE PROFILE SHEET 17 & 18 FOR -L_RT- PROFILE, SEE PROFILE SHEET 13 & 14 FOR -L_LT- PROFILE, SEE PROFILE SHEET 13 & 14 MATCHLI NE -Y1RT- STA. 23+00, SEE SHEET 10PAVEMENT REMOVAL SEE SHEET 3D-2 FOR DRAINAGE DITCH DETAILS NAD 83/ 2011 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:NCDOT\NCDOT-B3186_TO2_c_\6.0_CAD_BIM\6.2_Work_In_Progress\B-3186-B-5898\Hydraulics\PERMITS_Environmental\Drawings\B3186-B5898_PRM_WET_PSH.dgnUSER:TCARTERDATE:5/12/2021Hydro_color_pdf.pltcfgPLOT DRIVER:4:00:28 PMTIME:NCDOT_permits_CON.tbl DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 B-3186 / B-5898 WW FENCE PROP (CHORD) BREAK POINT INTERMITTENT /PERENN IAL EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEO-TEXTILE EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEO-TEXTILE 2GI 2GI REMOVE REMOVE REMOVE REMOVEREMOVEREMOVEREMOVE2GI SYSTEM RETAIN 2GI 2GI 2GI 2GI SEE DETAIL G W/SILL 2GI 18" RCP- I V 18" RCP- I V 30" RCP-IV 24" RCP-IV 18" RCP-IV 18" CSP18" RCP-I V 30" RCP-IV18" RCP-I V 18" RCP-I V 18" RCP-IV RCP-IV 18" 2GI NO DECK DRAINS REQUIRED 18" RCP-IV 18" RCP-IV 3GI-AW/ ELBOWS18" CSP TB 2GI TB 2GI TB 2GI TB 2GI 30" RCP- I V3 0 " RC P -IV 2GI W/ ELBOW S30" CSP TB 2GI TB 2GI TB 2GI JB w/MH RCP-IV 18" DETAIL V SEE SHEET 3D-2 STREAM STABILIZATION DETAIL 'D' SEE SHEET 3D-2 BEHIND RETAINING WALL CONCRETE DITCH DETAIL H SEE SHEET 3D-2 50 SY GEOTEXTILE EST 17 TONS W/CLASS 'B' RIPRAP 2' SPECIAL CUT BASE DITCH DETAIL H SEE SHEET 3D-2 50 SY GEOTEXTILE EST 17 TONS W/CLASS 'B' RIPRAP 2' SPECIAL CUT BASE DITCH DETAIL 'D' SEE SHEET 3D-2 BEHIND RETAINING WALL CONCRETE DITCH DETAIL J SEE SHEET 3D-2 SPECIAL CUT DITCH SEE SHEET 3D-2 DETAIL 'D' BEHIND RETAINING WALL CONCRETE DITCH DETAIL T SEE SHEET 3D-2 STREAM STABILIZATION DETAIL X SEE SHEET 3D-2 STREAM STABILIZATION DETAIL Y SEE SHEET 3D-2 STREAM STABILIZATION SEE SHEET 3D-3 ENERGY DISSIPATOR RIFFLE 2GI-A 2GI-AREMOVE RCP-IV 18" DDE=20 CY DETAIL C SEE SHEET 3D-2 126 SY GEOTEXTILE EST 43 TONS W/CLASS 'B' RIPRAP 2' LATERAL BASE DITCH DDE=1847 CY DETAIL U SEE SHEET 3D-2 STREAM STABILIZATION RCP-IV 18" RCP-I V 18"2GI TB DETAIL V SEE SHEET 3D-2 STABILIZATION STREAM REMOVEREMOVEREMOVE REMOVEREMOVEREMOVERE MOVE DETAIL Q SEE SHEET 3D-2 62 SY GEOTEXTILE EST 46 TONS W/CLASS 'I' RIPRAP 2' SPECIAL CUT BASE DITCH DETAIL J SEE SHEET 3D-2 CUT DITCH SPECIAL BOX REM 2GI TB W/ ELBOWS 18" CSP 2GI TB REMOVE 4OTCB RCP-IV 24" TB JB w/MH TB JB w/MH 30" RCP-IV 30" RCP-IV TB 2GI TB 2GI 2GI-A 2GI 2GI 2GI SEE SHEET 3D-2 DETAIL K L=101', SLOPE=3.89% 2' STANDARD BASE DITCH SEE SHEET 3D-2 DETAIL 'D' IN FRONT OF RETAINING WALL CONCRETE DITCH 2GI D DE=141 CYDETAI L SSEE SH EET 3D-2L=39', SLO PE=16.67%40 SY G EOTEX TI LEEST 13 TON SW/CLASS 'B' RI PRAP2' STA NDARD BASE DI TCH DETA I L SSEE SHEET 3D -2 L=98', SLO PE=14.20%101 SY G EOTEX TI LEEST 33 TON SW/CLA SS 'B' RI PRAP2' STAN DA RD BASE D I TCHSITE 3 S TS LEGEND S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY C C F F F FF W DI DI DI CB HW HWHW HW DI CB CB30" CMP18" CMP18" CMP15" CMP24" CMP 24" CMP 24" CMP18" CMP24" CMP24" CMP24" C MP PAVED DITCH PAVED DITCH 5' WW & 1SBW 5' WW & 1SBWBSTBST5'WW & 1SBW 5'WW & 1S BWWOODS 18" RCPWOODSSHRUBS1SMTL BUS GR GR CONC 6' CHL & 3SBW1SF SWITCH BOXES ELECTRIC PANELS 1SMTL SATALITE DISH BST 18" C & G CONC SW 6" CHL & SBW GR CONC PAD WOODS WOODS BST BSTBST BST WOODS WOODS WOODS18" C & G 30" C & G CB CBCB 18" C & G LTLT LTLT LT LT LT LT 6" CONC CURB DI DI DI WOODS WOODS WOODS M TL GUARD RAI LM TL GUARD RAI LMTL GUARD RAI LM T L G U A R D R A IL MTL GUARD RAIL 18" CMP18" CMP 24" CONC C& G CONC CONC SW(EA S T B OUND )U S 2 3/7 4SS48" OAK RIP RAP METER POWER T5' CHL GATE GATE 6' CHL US 19( W EST BOUND) (EAST BOUND)US 19US 19( W EST BOUND) (EAST BOUND)US 1918" HDPEHI KORY HI LL ROAD16' BST16' BST30' DUKE POWER CO. EASEMENT30' DUKE POWER CO. EASEMENT30' DUKE POWER CO. EASEMENT30' DUKE POWER CO. EASEMENT1341819202 1 HEDGE HEDGE HEDGE HEDGE HEDGE HEDGE HEDGE WOODS WOODS DITCH PAVED US 23 /74 (WEST BOUND )WOODS HEDGE DI PAD CONC DUMPSTER WOODS 6" CHL & SBW SHEET __ OF __ PERMIT DRAWING -L- TS Sta. 46+11.55 -L- SC Sta. 49+47.55 -L- CS Sta. 54+04.47 50+00 55+00-L- TS Sta. 58+97.47 45+00 50+00 55+0025 +00 30+0035+00-L_LT- TS Sta. 46+20.74 -L_RT- SC Sta. 48+31.45 -L_LT- SC Sta. 49+56.74 -Y1LT- ST Sta. 26+65.97 -Y1LT- CS Sta. 24+65.97 -L_LT- CS Sta. 54+40.85 -L_LT- SRS Sta. 57+76.85 -L_RT- CS Sta. 55+30.36 -Y1RT- PCC Sta. 32+50.64 -L_RT- SRS Sta. 58+66.36 -Y1RT- CS Sta. 36+12.49 -L LT- -L RT- -L- -L- -L LT- -L RT- -Y1 R T--Y 1R T --Y1LT- -Y1LT- -L_LT- POS Sta. 56+11.71 36' LT -Y1LT- POT Sta. 33+16.69 = 45+00 -L- ST Sta. 57+40.47 -Y1RT- POC STA. 27+54.43 -L- POC STA. 49+91.10 = 45+00 50+00 55+0025+0030+00NAD 83/ 2011 3 4 6 7 5 cc c c c c c c c c 50+00 5 5 +00 50+00 5 5+0002010100030405060707060504 030202030302B-77 25' (TYP) 25'(TYP )FILL 1.8:1 STA 49+15.00FILL 2:1 STA 49+25.00MATCHLINE -L- STA. 45+00, SEE SHEET 6MATCHLINE -L- STA. 59+00, SEE SHEET 87 FOR -Y1LT- PROFILE, SEE PROFILE SHEET 17 & 18 FOR -Y1RT- PROFILE, SEE PROFILE SHEET 17 & 18 FOR -L_RT- PROFILE, SEE PROFILE SHEET 13 & 14 FOR -L_LT- PROFILE, SEE PROFILE SHEET 13 & 14 MATCHLI NE -Y1RT- STA. 23+00, SEE SHEET 10PAVEMENT REMOVAL SEE SHEET 3D-2 FOR DRAINAGE DITCH DETAILS NAD 83/ 2011 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:NCDOT\NCDOT-B3186_TO2_c_\6.0_CAD_BIM\6.2_Work_In_Progress\B-3186-B-5898\Hydraulics\PERMITS_Environmental\Drawings\B3186-B5898_PRM_WET_PSH.dgnUSER:TCARTERDATE:5/12/2021Hydro_color_pdf.pltcfgPLOT DRIVER:3:59:35 PMTIME:NCDOT_permits_NOCON.tbl DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 B-3186 / B-5898 WW FENCE PROP (CHORD) BREAK POINT INTERMITTENT /PERENN IAL EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEO-TEXTILE EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEO-TEXTILE 2GI 2GI REMOVE REMOVE REMOVE REMOVEREMOVEREMOVEREMOVE2GI SYSTEM RETAIN 2GI 2GI 2GI 2GI SEE DETAIL G W/SILL 2GI 18" RCP- I V 18" RCP- I V 30" RCP-IV 24" RCP-IV 18" RCP-IV 18" CSP18" RCP-I V 30" RCP-IV18" RCP-I V 18" RCP-I V 18" RCP-IV RCP-IV 18" 2GI NO DECK DRAINS REQUIRED 18" RCP-IV 18" RCP-IV 3GI-AW/ ELBOWS18" CSP TB 2GI TB 2GI TB 2GI TB 2GI 30" RCP- I V3 0 " RC P -IV 2GI W/ ELBOW S30" CSP TB 2GI TB 2GI TB 2GI JB w/MH RCP-IV 18" DETAIL V SEE SHEET 3D-2 STREAM STABILIZATION DETAIL 'D' SEE SHEET 3D-2 BEHIND RETAINING WALL CONCRETE DITCH DETAIL H SEE SHEET 3D-2 50 SY GEOTEXTILE EST 17 TONS W/CLASS 'B' RIPRAP 2' SPECIAL CUT BASE DITCH DETAIL H SEE SHEET 3D-2 50 SY GEOTEXTILE EST 17 TONS W/CLASS 'B' RIPRAP 2' SPECIAL CUT BASE DITCH DETAIL 'D' SEE SHEET 3D-2 BEHIND RETAINING WALL CONCRETE DITCH DETAIL J SEE SHEET 3D-2 SPECIAL CUT DITCH SEE SHEET 3D-2 DETAIL 'D' BEHIND RETAINING WALL CONCRETE DITCH DETAIL T SEE SHEET 3D-2 STREAM STABILIZATION DETAIL X SEE SHEET 3D-2 STREAM STABILIZATION DETAIL Y SEE SHEET 3D-2 STREAM STABILIZATION SEE SHEET 3D-3 ENERGY DISSIPATOR RIFFLE 2GI-A 2GI-AREMOVE RCP-IV 18" DDE=20 CY DETAIL C SEE SHEET 3D-2 126 SY GEOTEXTILE EST 43 TONS W/CLASS 'B' RIPRAP 2' LATERAL BASE DITCH DDE=1847 CY DETAIL U SEE SHEET 3D-2 STREAM STABILIZATION RCP-IV 18" RCP-I V 18"2GI TB DETAIL V SEE SHEET 3D-2 STABILIZATION STREAM REMOVEREMOVEREMOVE REMOVEREMOVEREMOVERE MOVE DETAIL Q SEE SHEET 3D-2 62 SY GEOTEXTILE EST 46 TONS W/CLASS 'I' RIPRAP 2' SPECIAL CUT BASE DITCH DETAIL J SEE SHEET 3D-2 CUT DITCH SPECIAL BOX REM 2GI TB W/ ELBOWS 18" CSP 2GI TB REMOVE 4OTCB RCP-IV 24" TB JB w/MH TB JB w/MH 30" RCP-IV 30" RCP-IV TB 2GI TB 2GI 2GI-A 2GI 2GI 2GI SEE SHEET 3D-2 DETAIL K L=101', SLOPE=3.89% 2' STANDARD BASE DITCH SEE SHEET 3D-2 DETAIL 'D' IN FRONT OF RETAINING WALL CONCRETE DITCH 2GI D DE=141 CYDETAI L SSEE SH EET 3D-2L=39', SLO PE=16.67%40 SY G EOTEX TI LEEST 13 TON SW/CLASS 'B' RI PRAP2' STA NDARD BASE DI TCH DETA I L SSEE SHEET 3D -2 L=98', SLO PE=14.20%101 SY G EOTEX TI LEEST 33 TON SW/CLA SS 'B' RI PRAP2' STAN DA RD BASE D I TCHSITE 3 S TS LEGEND S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY C C F F F FF INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 2,590 2,580 2,570 2,560 2,550 2,540 2,590 2,580 2,570 2,560 2,550 2,540 2,600 2,610 2,600 2,590 2,580 2,570 2,560 2,550 2,540 V = 65 MPH VC = 820' K = 158 PI = 36+90.00 EL = 2590.57' (2 FT THICK) TO CAP. (TYP.) SLOPE 1.5:1 NORMAL CLASS II RIP RAP (STRUCTURE PAY ITEM) EXCAVATION = 1250 CY NATURAL GROUND LEFT EXCAVATION ELEV = 2567.5' 100 YR THEORETICAL SCOUR 500 YR THEORETICAL SCOUR PROPOSED GRADE PROFILE -L_LT- ALONG STRUCTURE -L- 44+38.96, EL. 2587.0' LOW POINT EXCAVATION ELEV = 2567.2' -L_LT- 45+08.12, EL. 2586.9' LOW POINT DATE: 1/14/2021 ELEV.=2564.0 NORMAL WS LOW SIDE/LOW CHORD (2 FT THICK) TO CAP. (TYP.) SLOPE 1.5:1 NORMAL CLASS II RIP RAP (TYP.) 3.5' KEY DEPTH REMOVE EXISTING BRIDGE OF ROAD EXISTING TOP EXISTING GROUND V = 65 MPH VC = 850' K = 157 PI = 36+55.00 EL = 2590.87' (2 FT THICK) TO CAP. (TYP.) SLOPE 1.5:1 NORMAL CLASS II RIP RAP PROP. 100 YR ELEV.=2576.3 (STRUCTURE PAY ITEM) EXCAVATION = 1250 CY (TYP.) 3.5' KEY DEPTH 100 YR THEORETICAL SCOUR 500 YR THEORETICAL SCOUR EXCAVATION ELEV =2567.5' -L_RT- 44+98.71, EL. 2586.83' LOW POINT PROPOSED GRADE EXISTING GROUND PROFILE -L_RT- ALONG STRUCTURE -L- 44+38.96, EL. 2587.0' LOW POINT EXCAVATION ELEV = 2567.2' L o GP ELEV. 2587.8' 1@132', 1@100', SKEW 120 72" MBT, W/4.0 DEEP CAPS BRIDGE C STA. 42+71 -L- DATE: 1/14/2021 ELEV.=2564.0 NORMAL WS ELEV.=2575.0 PROP. 50 YR LOW SIDE/LOW CHORD (2 FT THICK) TO CAP. (TYP.) SLOPE 1.5:1 NORMAL CLASS II RIP RAP REMOVE EXISTING BRIDGE OF ROAD EXISTING TOP 2,600 2,590 2,580 2,570 2,560 2,550 2,540 L o GP ELEV. 2587.8' 1@132', 1@100', SKEW 120 72" MBT, W/4.0 DEEP CAPS BRIDGE C STA. 42+71 -L- SHEET __ OF __ PERMIT DRAWING SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER B-3186 / B-5898 REVISIONS PENTABLE:FILE:B-3186 B-5895_RICHLAND CREEK_BSR_PRMUSER:_USERNAME_DATE:5/11/2021NCDOT_pdf_color_eng_100.pltPLOT DRIVER:5:17:09 PMTIME:NCDOT_PFL_XSC_RED BRIDGE.tblDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED (-)0.5000% (-)0.5000% (-)0.5000% NATURAL GROUND RIGHT (-)0.5000% (-)0.5000% (-)0.5000% 40+00 41+00 42+00 43+00 44+00 45+00 40+00 41+00 42+00 43+00 44+00 45+00 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 2,550 2,560 2,570 2,580 2,590 2,600 2,550 2,560 2,570 2,580 2,590 2,600 LOW SIDE/LOW CHORD CENTERLINE OF DETOUR EXISTING GROUND ALONG L SKEW 90, GP ELEV. 2578.39 TEMPORARY BRIDGE OAL= 300'+ BRIDGE C STA. 42+55 -DET01_EB- o ELEV. TYP. = 2568' EXCAVATION FOR INSTALLATION (TYP.) 3.5' KEY DEPTH (2 FT THICK) TO CAP. (TYP.) SLOPE 1.5:1 NORMAL CLASS II RIP RAP 100 YR THEORETICAL SCOUR DATE: 1/14/2021 WS ELEV.=2564.0 NORMAL BEGIN TEMPORARY BRIDGE EL = 2,579.01' -DET01_EB- STA. 41+05.00 END TEMPORARY BRIDGE EL = 2,577.64' -DET01_EB- STA. 44+05.00 NATURAL GROUND LEFT PROFILE -DET01_EB- ALONG STRUCTURE SHEET __ OF __ PERMIT DRAWING 40+00 41+00 42+00 43+00 44+00 45+00 46+0039+005/14/99SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER B-3186 / B-5898 REVISIONS PENTABLE:FILE:B3186-B5898_DETOUR_BSR_PRMUSER:_USERNAME_DATE:5/11/2021NCDOT_pdf_color_eng_100.pltPLOT DRIVER:5:20:58 PMTIME:NCDOT_PFL_XSC_RED BRIDGE.tblDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED (-)0.5000% NATURAL GROUND RIGHT PI = 39+05.00 EL = 2,580.14'(-)5.8779% (-)0.5000% VC = 630' K = 117 V = 55 MPH (-)0.6882% Hand Permanent Permanent Existing Existing Permanent Temp. Excavation Mechanized Clearing SW SW Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in impacts impacts SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands (Pond)(Stream)impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1 42+71 -L- BRIDGE 0.02 165 2 42+71 -L- RT DETOUR BRIDGE 0.05 94 3 42+71 - 55+00 -L- RT DETOUR/STREAM STABILIZATION 0.08 < 0.01 1169 32 TOTALS* THIS SHEET: 0.08 0.07 1169 291 TOTALS* 0.08 0.07 1169 291 *Rounded totals are sum of actual impacts. NOTES: The Unnamed Tributary to Richland Creek is being piped temporarily due to the traffic detour required. Once the detour is removed, the stream will be stabilized. Revised 2016 09 09 SHEET OF WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS HAYWOOD COUNTY TIP B-3186 / B-5898 STATE PROJ. # 38332.1.FS.1 / 48030.1.FS.1 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS MAY 2021