Loading...
HomeMy WebLinkAbout20211241 Ver 1_Pre-Filing Meeting Information_20210919DWR Pre-Fil ing Meeting Req u est Form Contact Name * Contact Email Addre ss * Proje ct Owne r * Proje ct Name * Proje ct County * Owne r Addre ss:* Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Ple ase list all e xisting proje ct ID's associate d with this proje cts.* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low and include location information.* Dave McHenry dgmchenry@ncdot.gov NCDOT B-3186/B-5898 US 74/23/19 Bridges Haywood City Sylva State / Province / Region NC Postal / Zip Code 28779 Country USA Street Address 253 Webster Road Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No B-3186/B-5898 Kevin Mitchell Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature * Submittal Date The project involves replacing and widening five bridges and interchange reconfiguration at the intersection of US 74/23/19 in Haywood County. Note that there already has been coordination with Kevin Mitchell on this project including two site visits (January 13, 2021 and March 15(?), 2021) as well as follow-up email coordination regarding impacts, permitting and likely mitigation. However, I wanted to submit this just in case it was also needed for the PCN submittal I need to get in soon. Thanks Dave pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 8/13/2021