HomeMy WebLinkAbout20211241 Ver 1_Pre-Filing Meeting Information_20210919DWR Pre-Fil ing Meeting Req u est Form
Contact Name *
Contact Email Addre ss *
Proje ct Owne r *
Proje ct Name *
Proje ct County *
Owne r Addre ss:*
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Ple ase list all e xisting proje ct ID's associate d with this proje cts.*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low and include location information.*
Dave McHenry
dgmchenry@ncdot.gov
NCDOT
B-3186/B-5898 US 74/23/19 Bridges
Haywood
City
Sylva
State / Province / Region
NC
Postal / Zip Code
28779
Country
USA
Street Address
253 Webster Road
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
B-3186/B-5898
Kevin Mitchell
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature *
Submittal Date
The project involves replacing and widening five bridges and
interchange reconfiguration at the intersection of US 74/23/19 in
Haywood County.
Note that there already has been coordination with Kevin Mitchell on
this project including two site visits (January 13, 2021 and March
15(?), 2021) as well as follow-up email coordination regarding
impacts, permitting and likely mitigation. However, I wanted to submit
this just in case it was also needed for the PCN submittal I need to get
in soon.
Thanks
Dave
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
8/13/2021