Loading...
HomeMy WebLinkAbout20130739 Ver 1_Intent to Approve with Comments_20130815Strickland, Bev From: Kulz, Eric Sent: Thursday, August 15, 2013 12:52 PM To: Strickland, Bev Subject: FW: *Intent to Approve with Comments* NCEEP Mitigation Portal Plan Review - St. Clair Creek Restoration Project / Beaufort County / (SAW- 2008 - 02655) (UNCLASSIFIED) Attachments: St. Clair Mitigation Plan Review Memo.pdf For laserfiche 13 -0739 Eric W. Kulz Environmental Senior Specialist N.C. Division of Water Resources Compliance & Permitting Unit 1650 MSC Raleigh, NC 27699 -1650 Phone: (919) 807 -6476 - Water Quality Programs Wetlands, Buffers, Stormwater - E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties - - - -- Original Message---- - From: Crumbley, Tyler SAW [ mailto: Tyler.Crumbley(@usace.army.mil] Sent: Thursday, August 15, 2013 11:42 AM To: bowers.todd(@epa.gov; Karoly, Cyndi; Kulz, Eric; Jones, Scott SAW; Marella Buncick ( Marella Buncick(@fws.gov); McLendon, Scott C SAW; Cox, David R.; Pearce, Guy; Ellis, Eric; Sollod, Steve; Gibby, Jean B SAW; Wilson, Travis W.; Emily Jernigan(@fws.gov; Kathryn Matthews(@fws.gov; Montgomery, Lori; Biddlecome, William J SAW; fritz.rohde(@noaa.gov; Smith, Heather; Wicker, Henry M JR SAW; Wescott, William G SAW; Steffens, Thomas A SAW; Wheeler, Tracey L SAW; Schaffer, Jeff; Scarbraugh, Anthony Cc: Tugwell, Todd SAW; Crumbley, Tyler SAW Subject: *Intent to Approve with Comments* NCEEP Mitigation Portal Plan Review - St. Clair Creek Restoration Project / Beaufort County / (SAW- 2008 - 02655) (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE All, The 30 -day comment review period for the St. Clair Creek Stream and Wetland Restoration project (SAW 2008- 02655)(EEP# 95015), closed on 14 August, 2013. All comments that were posted on the Mitigation Plan Review Portal during the review process are attached for your records. Additionally, comments can be reviewed on the Mitigation Plan Review Portal. We have evaluated the comments generated during the review period, and determined that the concerns expressed during the review are generally minor and can be addressed in the final mitigation plan. Accordingly, it is our intent to approve this Mitigation Plan unless a member of the NCIRT initiates the Dispute Resolution Process, described in the Final Mitigation Rule (33 CFR Section 332.8(e)). Please note that initiation of this process requires that a senior official of the agency objecting to the approval of the mitigation plan (instrument amendment) notify the District Engineer by letter within 15 days of this email (by COB on 30 August, 2013). Please notify me if you intend to initiate the Dispute Resolution Process. Provided that we do not get any objections, we will provide an approval letter to NCEEP at the conclusion of the 15 -day Dispute Resolution window. This approval will also transmit all 1 comments generated during the review process to NCEEP, and indicate what comments must be addressed in the Final Mitigation Plan. All NCIRT members will receive an electronic copy of the letter and all comments for your records. Thanks for your participation, Tyler Crumbley Regulatory Division Wilmington District U.S. Army Corps of Engineers 11405 Falls of Neuse Road Wake Forest, NC 27587 (919) 846 -2564 Classification: UNCLASSIFIED Caveats: NONE N REPLY TO ATTENTION OF: CESAW -RG /Crumbley DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403 -1343 MEMORANDUM FOR RECORD 15 August, 2013 SUBJECT: St. Clair Creek Restoration Project- NCIRT Comments During 30 -day Mitigation Plan Review PURPOSE: The comments and responses listed below were posted to the NCEEP Mitigation Plan Review Portal during the 30 -day comment period in accordance with Section 332.8(g) of the 2008 Mitigation Rule. NCEEP Project Name: St. Clair Creek Restoration Project, Beaufort County, NC USACE AID #: SAW- 2008 -02655 NCEEP #: 95015 30 -Day Comment Deadline: 14 August, 2013 1. T. Crumbley, USACE, 13 August 2013: • Pg. 9 -1, 9.1.1, We have a concern over the number of events proposed for meeting success. It is proposed for these headwater features to have gauges installed within the braided channels along with visual documentation of surface water flow for 30 consecutive days for only 2 events within 5 years. Due to the small drainage areas for these features (32 ac on UT3 and 90 ac on UT2), please be advised that if UT2 or UT3 does not meet the 30 day flow requirement, or exhibit a prevalence of OHWM indicators as defined in RGL 05 -05, these areas may be subject to reductions in stream credit generation. • Pg. 11 -1, In the Final Mitigation Plan, the long -term management plan discussion should be expanded upon. Particularly if the site is to be transferred to the NCDENR Stewardship Program. 2. Eric Kulz, NCDWR; 14 August 2013: • DWR CO has reviewed the mitigation plan, and the site appears to be a good candidate for restoration. In addition, DWR WaRO staff visited the site on Monday, 8/12 and concurred that we have no comments. • FYI looking at Figure 2.2, it was unclear why the watershed delineation for UT 2 ended at Peoples Road. I calculated the watershed sizes using the USGS streamstats website, and they may be larger than reported. Streamstats calculated 358 acres for UT 2 and 43 acres for UT 3, so they may be larger than reported. Also, WaRO personnel confirmed fairly well- defined valleys (for Beaufort County) on the site.