Loading...
HomeMy WebLinkAboutNC0020656_Inspection_20020418ATA NCDENR North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor The Honorable Ann Slaughter Mayor, City of Laurinburg PO Box 520 Laurinburg, NC 28379 April 18, 2002 SUBJECT: Compliance Evaluation Inspection City of Laurinburg Wastewater Treatment Plant NPDES Permit No. NC0020656 Scotland County Dear Ms. Slaughter: William G. Ross Jr., Secretary Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality Enclosed is a copy of the Compliance Evaluation Inspection conducted April 11.2002. As part of the inspection a tour of the Wastewater Treatment Plant was conducted. The facility continues to have a high inventory of solids in the system. Please submit a Plan of Action in writing to our office concerning reduction of solids in the facility and address item #9 from Part D. Summary of Findings/Comments of this report by May 31.2002. The other observations and recommendations are also located in Part D.of this report. The cooperation of Mr. Robert Ellis, Grade IV ORC and Mr. Ricky Odum, Grade III Backup Operator was appreciated. During the inspection a copy of the NPDES Compliance Reminders were reviewed and left with Mr. Odum. As a reminder preservation of the Waters of the State can only be acquired through consistent NPDES permit compliance. Please review the attached report. If you or your staff have any questions do not hesitate to contact me at 910-486-1541. Sincerely, 2 . % ce 'i7 Belinda S. Henson Environmental Chemist /bsh Enclosures cc: Mr. Robert Ellis, ORC, City of Laurinburg Fayetteville Regional Office 225 Green Street— Suite 714, Fayetteville, North Carolina 28301-5043 Phone: 910-486-15411 FAX: 910-486-07071Internet: www.enr.state.nc.us/ENR An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper NPDES COMPLIANCE INSPECTION REPORT North Carolina Division of Water Quality Fayetteville Regional Office Section A. National Data System Coding Transaction Code: N NPDES NO. NC0020656 Date: 020411 Inspection Type: C Inspector: S Facility Type: 1 Reserved: Facility Evaluation Rating: 3 BI: N QA: N Reserved: Section B: Facility Data Name and Location of Facility Inspected: City of Laurinburg Leith Creek WWTP Entry Time/Date: 10:05am/020411 Permit Effective Date: 010301 Exit Time/Date: 1:35pm/020411 Permit Expiration Date: 040831 Name(s), Title(s) of On -Site Representative(s): Robert Ellis (Certified Grade IV) - "ORC" Ricky Odum (Certified Grade III) - "Backup Operator" Phone Number(s): (910)276-3522 Name, Title and Address of Responsible Official: Ms. Ann Slaughter, Mayor PO Box 249 Laurinburg, NC 28352 Contacted: no Section C: Areas Evaluated During Inspection (S = Satisfactory, M = Marginal, U = Unsatisfactory, N = Not Evaluated, N/A = Not Applicable) e.ernirt: acili lte: .eview=. J: Flow easurement::, oratory: 5. retreatmnen onitorin . udgeDisposal rogram:.; uen eceivmg Waters S 'Complmike, S'chedule Aeration ner 1aintenance. S Section D: Summary of Findings/Comments: 1. The facility has four (4) influent pumps which operate as needed depending on flow. 2. , The automatic bar screen appeared to be operational. It is operated on a continuous basis. All screenings are properly disposed of through the county landfill. 3. The grit removal system appeared to be operational. All grit is properly disposed of through the county landfill. 4. The influent flow to this facility is equally split with one half ('V2) going to SIDE #1 (aeration basins) and the remaining flow going to SIDE #2 (oxidation ditch). 5. The influent composite• sampler refrigerator temperature was 4 degrees C. The acceptable temperature range of samples during storage and for stored sample extracts, is 1.0 - 4.4 degrees C. 6. A backup generator is on site too operate the headworks and equalization basin pumps. As a reminder the backup generator should be operated at least monthly to verify operation and documented when this is done. 7. The Equalization Basin was empty at the time of the inspection. 8. SIDE #2-The oxidation ditch appeared to be operating adequately. The most recent Mixed Liquor Suspended Solids (MLSS) result was 4600 mg/L for March 8, 2002. The sludge depth in Clarifier #3 was 3 ''A feet with a tank depth of 13 feet. Chlorine is added to the effluent before it enters the parshall flume before it is discharged. It does not flow through the chlorine contact tank. 9. SIDE #1-The two (2) aeration basins were not aerating at the initial time of the inspection. As per Mr. Odum, a staff member (laborer) had been decanting supernatant from the digester and cleaning the chlorine contact tank that when combined resulted in an overload of Clarifiers # 1 and #2. At the time of the inspection the sludge depths in both clarifiers were less than (>) 1 foot. As a recommendation clarifier sludge blankets should be checked and documented daily on a frequent basis. The most recent Mixed Liquor Suspended Solids (MLSS) was 9980 mg/L for aeration basin #1 and 5020 mg/L for aeration basin #2. The chlorine contact tank operates a parallel dual system where flow from one clarifier goes to one side of the tank and flow from the other clarifier goes to the other side. While one side of the chlorine contact tank was down for cleaning the sludge depth in the other side ranged from 2 '/z -3 '/Z feet. As a reminder sludge depths in the chlorine contact tank should not exceed 12 inches. 10. The flow meter was calibrated March 28, 2002 by Jim Haven Inc. It is advisable that the flow meter calibration document contain the % error before and after calibration in the future by the technician. 11. The effluent cascade aeration outfall was accessible and the effluent appeared to be free of solids. 12. The effluent composite sampler temperature was 6 degrees C. The temperature should be adjusted to the acceptable range of 1.0 - 4.4 degrees C for proper preservation of samples. 13. A effluent bar screen was also inspected and it appeared to be properly maintained. Slaughter Page 4 April 18, 2002 14. The small digester appeared to be approximately ('h) full with the larger digester appearing to be (3/4) full. Sludge from the small digester is pumped to the drying beds. Dried sludge appeared on six (6) of the eight (8) drying beds with the two (2) remainders used for storage. Sludge from the larger digester is land applied. The land application permit # WQ0002526 allows 300 acres to be used for sludge disposal. During the week of March 18, 2002 sludge was land applied of approximately 811, 569 gallons. 15. The on site laboratory analyzes the following NPDES permit required parameters: BOD, TSS, Fecal Coliform, Chlorine Residual, Ammonia and Temperature. "Oxford Laboratory" analyzes Total Nitrogen, Total Phosphorus and Metals. "TBL" contracts another laboratory "Meriteck " to analyze for Toxicity. 16. Laboratory records were reviewed for the months: May and September 2001 and compared to Discharge Monitoring Reports (DMRs). On May 6th an ammonia value was reported as >.10 mg/L and when laboratory records were reviewed the result was another value. Please submit an amended copy for May 2001 with the following procedures: A. All corrected data should be written in red ink or hi -lighted. B. At the top to the Effluent Page, the words "Corrected Report" or "Amended Report" should be written in red ink on all copies. This will differentiate between originally submitted report and corrected report. C. Two (2) copies of the corrected report should be submitted to this Division and one (1) copy must be retained by the permittee. The specific page or pages that have been corrected should only be submitted. D. A brief explanation for the correction should be written either on the back side of the Effluent page or in a cover letter accompanying the reports. Name and Signature of Inspector Belinda S. Henson ) (.:11. t..o--) .. ftie,itocrlD Name and Signature of Reviewer Paul E. Rawls /) Action Taken Agency/Office/Telephone Date DENR/Fayetteville/(910)486-1541 Agency/Office/Telephone Date DENR/Fayetteville/(910)486-1541 Regulatory Office Use Only Compliance Status _Noncompliance _Compliance Date Section D: Summary of Findings/Comments Brief Facility Description: The facility is a 4.0 MGD WWTP consisting of the following treatment components: mechanical bar screen, mechanical grit removal. influent flow monitoring, aerated equalization basin, influent pump station, flow splitter box, dual 1 MGD extended aeration basins with secondary clarification, 2 MGD oxidation ditch with secondary clarification. chlorination; effluent flow measurement, two aerobic digesters, sludge drying beds, effluent force main and cascade aeration. FACILITY SITE REVIEW es No N/A 1. Treatment units properly operated and maintained. o N/A 2. Standby power or other equivalent provision provided. Yes No N/A 3. Adequate alarm system for power or equipment failure available. 4. Sludge disposal procedures appropriate: des% No N/A a. Disposal of sludge according to regulations ("Y' No N/A b. State approval for sludge disposal received. Yes c N/A 5. Sufficient sludge disposed of to maintain treatment process equilibrium. Cre. No N/A 6. The ORC and Backup Operator are officially designated with NCDENR/DWQ Training and Certification Unit. Yes No N/A 7. Adequate spare parts and supplies inventory maintained. T+Rpe-ilars i .,Za)rs z}t need . !�► No N/A 8. Plant has general safety structures such as rails around or covers over tanks, pits, or wells. es No N/A 9. Plant is generally clean, free from open trash areas. 10. Screening: No N/A a. Manual Tesi No N/A b. Mechanical Yes ed7 N/A c. Buildup of debris (Ze. No N/A d. Screenings properly, disposed of. Yes ( 07 N/A Yes Oa N/A V No N/A 11. Grit Removal: a. Excessive organic content in the grit chamber b. Excessive odors c. Grit properly disposed of. Page 2 12. Primary clarifier: Yes No (ft7 a. Excessive gas bubbles Yes No N/A b. Black and odorous wastewater Yes No N/A c. Poor suspended solids removed Yes No N/A d. Excessive buildup of solids in center well of circular clarifier Yes No N/A e. Weirs level Yes No N/A f Weir blockage Yes No N/A g. Evidence of short circuiting Yes No N/A h. Lack of adequate scum removal Yes No N/A i. Excessive floating sludge Yes No N/A j. Broken sludge scraper. 13. Trickling Filter: Yes No c a. Trickling filter ponding(indicating clogged media) Yes No N/A b. Leak at center column of trickling filter's distribution arms Yes No N/A c. Uneven distribution of flow on trickling filter surface Yes No N/A d. Uneven or discolored growth Yes No N/A e. Excessive sloughing of growth Yes No N/A f Odor Yes No N/A g. Clogging of trickling filter's distribution arm orifices Yes No N/A h. Filter flies, worms, or snails. Yes N/A Yes No N/A Yes Th-o N/A Yes too N/A Yes (loj N/A Yes No N/A Yes No J ' 14. Activated Sludge Basins/Oxidation Ditches: a. Dead spots b. Failure of surface aerators c. Air rising in clumps d. Dark foam or bad color e. Thick billows of white, sudsy foam f. Air rising unevenly g. Excessive air leaks in compressed air piping. 15. Stabilization Ponds/Lagoons: Yes No a. Excessive weeds including duckweed in stabilization ponds Yes No N/A b. Dead fish or aquatic organisms Yes No N/A c. Buildup of solids around influent pipe Yes No N/A d. Excessive scum on surface. Page 3 16. Yes ChL ' N/A Yes No N/A Yes o N/A Yes N/A Yes N/A Yes NO' N/A CTei No N/A Yes N/A Yes (go' N/A Yes N/A 1 Yes No V/ Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A ,CZe„ No N/A Yes N/A Yes N/A Yes No N/A Yes No N2 ' Yes No �esr ) No N/A No N/A Yes No CEZ Yes Yes Yes Secondary Clarifier: a. Excessive gas bubbles on surface b. Level overflow weirs c. Weir blockage d. Evidence of short circuiting e. Excessive buildup of solids in center well of circular clarifier f. Pin floc in overflow g. Effective scum rake h. Floating sludge on surface i. Excessive high sludge blanket j. Clogged sludge withdrawal ports on secondary clarifier. Filtration: a. Filter surface clogging b. Short filter run c. Gravel displacement of filter media d.. Loss of filter media during backwashing e. Recycled filter backwash water in excess of 5 percent f Formation of mudballs in filter media. 18. Chlorination Unit: a. Sludge buildup in contact chamber b. Gas bubbles c. Floating scum and/or solids d. Adequate ventilation of chlorine feeding room and storage area NIOSH-approved 30 minute air pack All standing chlorine cylinders chained in place All personnel trained in the use of chlorine Proper chlorine feed, storage, and reserve supply. e. f. g. h. 19. Ultraviolet radiation disinfection present and in use. 20. Dechlorination: No �7T a. Proper storage of sulfur dioxide cylinders No N/A b. Adequate ventilation of sulfur dioxide feeding room No N/A c. Automatic sulfur dioxide feed or feedback control operating properly. 21. Aerobic Digester: Yes (l o N/A a. Excessive foaming in tank Yes (&gT i N/A b. Noxious odor Yes Rc N/A c. Mechanical aeration failure Yes No d. Clogging of diffusers. Page 4 Yes No ai�h2 Yes No N/A 22. Anaerobic Digester: a. Floating cover tilting b. Gas burner operative 23. Sludge Drying and/or disposal: Yes (ro, N/A a. Poor sludge distribution on drying beds Yes CR-8 N/A b. Vegetation in drying beds C MP No N/A c. Dry sludge remaining in drying beds cS'es) No N/A d. Dry sludge stored on site CaS7 No N/A e. Filtrate from sludge drying beds returned to front of plant (ZesNo N/A f. Sludge disposal through county landfill. 'es No N/A g. Sludge land applied. 24. Filter Press: Yes No A- a. High level of solids in filtrate from filter presses or vacuum filters Yes No N/A b. Thin filter cake caused by poor dewatering Yes No N/A c. Sludge buildup on belts and/or rollers of filter press Yes No . N/A d. Excessive moisture in belt filter press sludge cake. Yes No Yes No N/A Yes No N/A 25. Polishing Ponds or Tanks: a. Objectionable odor, excessive foam, floating solids, or oil sheens on water surface b. Solids or scum accumulations in tank or at side of pond c. Evidence of bypassed polishing ponds or tanks because of low capacity. 26. Plant Effluent: Yes No~ N/A a. Excessive suspended solids, turbidity, foam, grease, scum, color, and other macroscopic particulate matter present Yes T i N/A b. Potential toxicity (dead fish, dead plant at discharge) es No N/A c. Outfall discharge line easily accessible. 27. Flow Measurement: T'eTs No N/A a. Proper placement of flow measurement device No N/A b. Flow meter calibrated Yes (1% N/A c. Buildup of solids in flume or weir Yes CSIo? N/A d. Broken or cracked flume or weir Yes No as-LAi' e. Clogged or broken stilling wells Yes No Wf. Weir plate edge corroded or damaged Yes No N/A g. Flow measurement error less than 10%. Page 5 No N/A Yes o) N/A es No N/A �Y'.esD No : N/A 28. Sampling: a. Sampling and analysis completed on parameters specified by permit b. Composite sample temperatures maintained at 4 degrees Celsius or less (but above freezing) during sampling c. Contract laboratory used for sample analysis d. Effluent composite samples obtained are flow proportional. N/A es:"No N/A e,'No N/A Ye ? No N/A es) No N/A Otes1No N/A es No N/A es= No N/A ei No N/A es 'No N/A CZes'No N/A 'j No N/A Yes No N/A No N/A es ; No N/A RECORDKEEPING AND REPORTING 1. Records and reports maintained as required by permit. 2. • All required information available, complete, and current. 3. Records maintained for 3 years and all sludge records maintained for 5 years. 4. Analytical results consistent with data reported on DMRs. Sampling and analyses data adequate and include: a. Dates, times, and location of sampling b. Name of individual performing sampling c. Results of analyses and calibration d. Dates of analyses e. Name of person performing analyses. 6. Monitoring records adequate and include: a. Monitoring charts kept for 3 years b. Flowmeter calibration records kept for 3 years. 7. The pH meter is calibrated daily with two buffers and checked with a third buffer and properly documented. 8. Expiration dates of pH buffers adequate. 9. All thermometers used in NPDES permit reporting is calibrated annually with an NIST certified thermometer or a traceable thermometer annually and documented. 10. The following NPDES permit required parameters are analyzed on site: pH, Temperature, Dissolved Oxygen and Chlorine Residual. Page 6 %. No N/A C No N/A ejp No N/A Yes No N/A Yes No N/A '- No N/A Yes No �T - 11. The NPDES permit required parameter Total Chlorine Residual is analyzed by approved method. 12. BOD incubator temperature maintained at 20 +/- 1 Degrees Celsius and the temperature maintained in a log for every day of operation. 13. Fecal coliform incubator maintained at 44.5 +/- 0.2 Degree Celsius and the temperature maintained in a log for every day of operation. 14. Plant records adequate and include: a. 0 & M Manual e N ae Oct nt b. "As -built" engineering drawings Mize vo1 <mt c. Schedules and dates of equipment maintenance repairs d. Equipment data cards. Yes No 15. ges�"No N/A 16. Yes No J es7'No N/A N/A eso N/A �Ye�S�No N/A I'e"s No N/A Yes No N/A Permittee is meeting compliance schedule. DMRs complete and include all NPDES permit required parameters. 17. The facility has a permitted flow greater than 5 MGD and is required to operate seven days per week 24 hours a day. 18. ORC visitation logs available and current. 19. ORC certified at a level equal to or greater than the classification of the wastewater facility. 20. Backup Operator certified at one level less than the classification of the wastewater facility or greater. 21. -Current copy of the complete NPDES permit on site. 22. Facility description verified as contained in NPDES permit. 23. Facility analyzes process control parameters for example: MLSS, MCRT, Settleable Solids and others that are applicable. Yes No N/A 24. Revised 7/16/01 by Belinda Henson Industrial Waste Surveys (IWS) sent to all possible Significant Industrial Users (Sills) within the last five years (especially new industries). �it, of CaurioDurg May 21, 2002 Belinda S. Hinson Environmental Chemist, NCDENR 225 Green Street, Suite 714 Fayetteville, North Carolina 28301-5043 OndDrol OFFICE OF SUPERINTENDENT ; WASR & WASTEWATER PLANT i e MAY 3 0 2002 Subject: Compliance Evaluation Inspection Report City of Laurinburg Wastewater Treatment Plant NPDES Permit No. NC0020656 Scotland County Dear Ms. Hinson: Enclosed please find the response to :your inspection that was conducted April 11, 2002. In reference to Item #9 from part D, we are monitoring clarifier sludge blankets daily and recording these results in a daily log we are also monitoring sludge depths in our chlorine contact chambers and are cleaning them per your recommendation. The plan of action to reduce the solids concentration at Leith Creek Plant is as follows: 1. EMA Resources will be on site June 3, 2002 to begin a lime stabilization process on our large digester. This will allow, us to continue wasting solids out of the plant on a daily basis. 2. We propose to duplicate #1 when the digester has reached full capacity. 3. We have signed a contract to complete #1 and depending on resources we hope to be able to complete the process two additional times. 4. Continue regular land application process. In reference to #16 from part D please find enclosed corrected copies of DMR from September 2001. The reason we are resubmitting this report is that the results for Ammonia Nitrogen on September 6, 2001 were inadvertently omitted. 603 LAUCHWOOD DRIVE • P.O. BOX 249 • LAURINBURG, N.C. 28352 • 919/277-0214 If you have any questions concerning these matters please give me a call at (910) 277- 0214. Sincerely, Robert A. Ellis City of Laurinburg Treatment Plants Director Cc: Mr. Joseph Huffman, City Manager UNITED STATES 11 POSTAL SERVICE.. WE CARE Dear Postal Customer: We sincerely regret the damage to your mail during handling by the Postal Service. We hope this incident did not inconvenience you We realize that your mail is important to you and that you have every right to expect it to be delivered in good condition. Although every effort is made to prevent damage to the mail, occasionally this will occur because of the great volumehandled and'the rapid processing. methods which must be employed to assure the most expeditious distribution possible. We hope you understand. We assure you that we are constantly striving to improve ni it processing. methods in order that even a rare occurrence may be eliminated. Please accept our apologies. Sincerely, Your Plant Manager . Your Postmaster Fayetteville P&DC PO BOX 28302 Fayetteville, NC 28302-9997 Fayetteville, NC 28302-9998