HomeMy WebLinkAbout20130862 Ver 1_CAMA Application_201308144L
�� 20 1 3486 2
RCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat McCrory Braxton C. Davis John E. Skvarla, III
Governor Director Secretary
August 12, 2013
MEMORANDUM
TO:
FROM:
SUBJECT:
Applicant:
Karen Higgins, Webscape Unit Supervisor
Division of Water Quality - Raleigh
Doug Huggett
Major Permits Processing Coordinator
AUG 142013
DiENR - WATER UALITY
CAMA/DREDGE & FILL Permit Application Review
Nancy McHugh
Project Location: Lot 35, N Hunt Club Trail in Holiday Island, Perquimans County
Proposed Project: Bulkhead construction & backfill (land lost to erosion)
Please indicate below your agency's position or viewpoint on the proposed project and return this
form by 09/02/13 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252 - 247 - 3330).
If you have any questions regarding the proposed project, please contact Lynn Mathis at (252)
264 -3901, ext. 234. When appropriate, in -depth comments with supporting data are requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED DATE
1367 US 17 South, Elizabeth City, NC 27909
Phone: 252 - 264 -39011 FAX: 252-264-3723; Internet: www.nocoastalmanagement.net
An Equal Opportunity 1 Affirmative Action Employer
MAJOR PERMIT FEE MATRIX
ADDIicant: N ANVI rn cH LA G q
Selection
Development Type
Fee
DCM %
DW4 %
(1430016014351000931625 6253)
(243001602 435100095 2341)
I. Private, non - commercial
development that does not
$250
100%($250)
0%($0)
involve the filling or
excavation of any wetlands
or open water areas:
II. Public or commercial
development that does not
$400
100%($400)
0%($0)
involve the filling or
excavation of any wetlands
or open water areas:
III. For development that
involves the filling and /or
excavation of up to 1 acre
of wetlands and /or open
water areas, determine if A,
B, C, or D below applies:
III(A). Private, non -
commercial development, if
$250
100% ($250)
00/00)
General Water Quality
Certification No. 3490 (See
attached ) can be applied:
III(B). Public or commercial
development, if General
$400
100%($400)
0%($0)
Water Quality Certification
No. 3490 (See attached)
can be applied:
III(C). If General Water
Quality Certification No.
$400
60%($240)
40%($160)
3490 (see attached) could
be applied, but DCM staff
determined that additional
review and written DWQ
concurrence is needed
because of concerns
related to water quality or
aquatic life:
III(D). If General Water
Cj
Quality Certification No.
$400
60% ($240)
40%($160)
3490 (see attached) cannot
be applied:
IV. For development that
E]
involves the filling and/or
$475
60%($285)
40%($190)
excavation of more than
one acre of wetlands and/or
open water areas:
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Nancy McHugh
2. LOCATION OF PROJECT SITE: The applicant's property location is Lot 35, Section
N Hunt Club Trail in Holiday Island Subdivision, in Perquimans County.
Photo Index — 2006:157-6918 (P15 & P16) 2000:157-1790 (P15 & P16)
1995:157-1516 (Q13 & Q14) 1989: 1 16 -5 (L9 & L10)
State Plane Coordinates - X: 2775891 Y:860530
3. INVESTIGATION TYPE: CAMA/D &F
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — July 25, 2013
Was Applicant Present — No
(Three meetings prior to submittal)
5. PROCESSING PROCEDURE: Application Received Complete - Aug_ ust 8, 2013
Office - Elizabeth City
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Perquimans County
Land Classification From LUP - Residential
(B) AEC(s) Involved: EW, PTA & ES
(C) Water Dependent: Yes
(D) Intended Use: Private
(E) Wastewater Treatment: Existing - None
Planned - None
(F) Type of Structures: Existing - Bulkhead
Planned - Bulkhead
(G) Estimated Annual Rate of Erosion: 2' per year — However, this erosion has
occurred due to isolated severe storm events over the last 2 years
Source — Applicant, aerial photographs and site investigation
7. HABITAT DESCRIPTION: [AREA]
DREDGED' FILLED OTHER
(A) Vegetated Wetlands
(B) Non - Vegetated Wetlands
(C) Other: High Ground
------------- - - - - -4
------------- - - - - -4
Cut and gra e:
6,6128f
Shallow Bottom
------------- - - - - -4
1,650sf
(D) Total Area Disturbed: 8,262sf (.19 acres)
(E) Primary Nursery Area: No
(F) Water Classification: SB Open: No
8. PROJECT SUMMARY: The applicant proposes to recover land lost due to erosion
along a residential lot over a two year period. The work proposed includes the filling of
1,650sf of shallow bottom.
Nancy McHugh
Field Investigation Report
Page 2
Project Setting
The applicant, Nancy McHugh is the owner of a vacant lot located at the end of Hunt Club Trail,
Lot 35, Section N, Holiday Island Subdivision, in Perquimans County. The property is a .55
acre (23,958 square foot) pie shaped lot bounded by two developed residential lots. Ms.
McHugh is the owner of the adjacent lot (36 -N) to the north of the property in question. Lot 35
is situated adjacent to the mouth of a man -made canal system facing south towards the
Albemarle Sound.
Flora on the property is limited to a six trees including Carolina Red Maple (Acer rubrum),
Mimosa (Albizia julibrissin) and Shortleaf Pine (Pinus echinata); and a mix of domestic grasses
and weeds. Fauna on and near the property is common to rural/residential neighborhoods in
the area and includes, but are not limited to a variety of small mammals, possum, snakes, deer,
raptors, songbirds and water fowl. The elevation of the lot along the shoreline is 2' to 5' above
normal water level (NWL). Water depths along the old bulkhead alignment are 1.5' to 2' below
NWL. Soil on the property is old spoil placed on the property when the canal system was
excavated to create Holiday Island.
Shoreline erosion control structures adjacent to the project site are bulkheads. In the case of
the applicant's lot a large breach formed along the south side of the property as a result of
severe storms beginning with Hurricane Irene in 2011 that removed 59' of bulkhead. The
breach along the applicant's bulkhead is 1 00' x 16.5' (average) or 1,650 square feet (sf), with a
high bank that is an average of 4' above the water bottom. Erosion along the applicant's
shoreline has increased over the past year as evidenced by a comparison of available aerial
photography and onsite findings. The erosion is depositing the sediment into the canal,
shallowing water depths adjacent to the remnant bulkhead.
There is a 59' gap in the bulkhead along the 100' breach. Approximately 26' of bulkhead is 3'
to 12' water ward of the NWL the east side, and a 15' section of bulkhead is 3' to 8' water ward
of NWL on the west side of the breach. Existing vertical tiebacks/dead men for the original
bulkhead are visible within the breach.
The Water Classification for the Albemarle Sound adjacent to Holiday Island is SB and is
closed to shellfish harvesting. No submerged aquatic vegetation is growing within the proposed
work area or in the immediate surroundings. There are no known archeological sites on or
near the applicant's property.
Development Proposal
The applicant, Nancy McHugh, proposes to repair 100' feet of bulkhead along a breach in an
existing bulkhead, and backfill the area with dirt from existing high ground on the property and
from a locally available high ground source.
Approximately 244 cubic yards of fill will be required to repair the 100' x 16.5' breach and will
result in the filling of 1,650sf of shallow bottom. It is anticipated that approximately 6,612sf of
high ground will be disturbed during the construction and backfill activities. Backfill originating
,r
i
Nancy McHugh
Field Investigation Report
Page 3
on the property will only be utilized as practicable. The replacement bulkhead is proposed
along the same alignment of the original bulkhead as shown on the drawing submitted and in
the attached photographs.
Anticipated Impacts
The project, as proposed, will result in the filling of approximately 1,650sf of shallow bottom and
the disturbance of 6,612sf of high ground. The total area of disturbance will be approximately
8,262sf. It is anticipated that temporary turbidity of the water will occur during construction of
the bulkhead.
Stabilization of the shoreline along the applicant's property will reduce the overall amount of
sediments washing into the adjacent canal.
Submitted by: Lynn Mathis
Date: August 9, 2013
2- d
f s►Xc�
Oro) t'pP.
o ssoj u-s��s `�,� fl �►s �� Il!m -f1
q
f
p.,fS�nS
-1 -- -- - - - 1- � -- - -- - -
p 4 Jp9��� sl
4y)lw!
- Svc'
CIN 8 - end
�_ ►off° —g
Ghsb- �V�1 -tiib
PIP f 111V
J
_ __ _ _- __ __ __S___ _ _- _�,_ -.
_ _ _ f
I
r
S
f
r
i
I
_____. ___ _ _ _ _ t _ _ _ __
r
- - - �
v '
Bawl
WFLICATIONfor
MsMrDweNpmeol
(last nwlaed 1=7=)
D
JUL 19 2013
Fi
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
"'
Business Name
Project Name (I applica
e)
AUG - 8 2013
Agentl Contractor 1: First Name
Applicant 1: First Name
MI
Last Name
MI
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
-any
' O Box
a5`I(c
City '
Elm e
State
A) L
ZIP
;)q q U (
Country
ferQu 6'}1ay\
Phone No.
- 673- 9 "1 ext.
FV No.
- -
Street Address (if different from above)
''ot3 LI,i + i - �-r��t
City
���c {
State
tv
ZIP
�'-t 9 y'-/
Email
2. Agent/Conti actor Information
Business Name
Agentl Contractor 1: First Name
MI
Last Name
Agentl Contractor 2: First Name
MI
Last Name
Mailing Address
PO Box
City
State
ZIP
Phone No. 1
-
ext.
Phone No. 2
- - ext.
FAX No.
Contractor #
Street Address (ifdifferent from above)
City
State
ZIP
Email
<Form continues on back>
252. 808.2808 :: 1.888.4RCOAS1t :: www.nocoastalmanagement.net
Form DCM MP -1 (Page 2 of 4) APPLICATION for
Major Development Permit
3 Project Location
County (can be multiple)
Street Address
State Rd. #
P67etpLt /tLJ41Ll5
I--
230 )TUtu% CLu,-3
d. Approximate elevation of tract above NHW (normal high water) or
Subdivision Name
!sG✓an!�
City
I ��15
State
KC,
Zip 2-7 VIII
III
-
Hai ii
f. Man -made features and uses now on tract
Ajouc, - v-�CAXT
g. Identify and describe the existing land uses adjacent to the proposed project site.
Phone No.
Lot No.(s) (if many, attach additional page wide list)
qI -672 - q ext.
35" ,
a. In which NC river basin Is the project located?
b. Name of body of water nearest to proposed project
P44 reUCT wlL(if
AL JUIL1/412C E '�:u, U O
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
❑Natural ❑Manmade ❑Unknown
,4 ijn i i�S ��•{jE
e. Is proposed work within city limits or planning jurisdiction?
I. If applicable, list the planning jurisdiction or city limit the proposed
PYes ❑No
work falls within. v
/P,,�,WWu m n`(/tN S
4. Site Description
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft )
I
-CSSAC o2 25fZ73 -T
c. Size of individual lots) S5A C
d. Approximate elevation of tract above NHW (normal high water) or
D
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
❑t4HW or JVNWL
e. Vegetation on tract
�)u /Lt : f t L 6✓?ASS -J?Z
f. Man -made features and uses now on tract
Ajouc, - v-�CAXT
g. Identify and describe the existing land uses adjacent to the proposed project site.
?ES! n &j v 77 r L
h. How does local government zone the tract?
I. Is the proposed project consistent with the applicable zoning?
12,(- 5 ! /� &iV T7A
ttach zoning compliance certificate, if applicable)
Yes ❑No ❑NA
J. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes pNo
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes A, o ❑NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes XNo DNA
National Register listed or eligible property?
<Folm continues on next page>
252- 808 -2808 :: 1- 888.4RCOAST :: www.neeoastalmanagement.not
r
• Form D6M MP -1 (Page 3 of 4) APPLICATION for
Major Development Permit
m. (I) Are there wetlands on the site?
❑Yes PIO
(ii) Are there coastal wetlands on the site?
❑Yes *0
(iii) If yes to either (1) or (11) above, has a delineation been conducted?
A6 S 10E1U1-74 L [r 5,L-- /A/ CoA-11 U.-1 c 1vAI
❑Yes ❑No
(Attach documentation, If available)
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
n. Describe existing wastewater treatment facilities.
A�/tGK/"7'E / � rS/h2e-E w PL'A/r%'
f- -, - -• . - r --
4 AM iMA.14 - IZIeJt J
d. List all development activities you propose. C-Cj /t/ S j.RU C— N&W A /N
CX /S /-ZM('o A61 &"44 /Lf F
e. Are the proposed activities maintenance of an existing project, new work, or both?
f. What is the approximate total disturbed land area resulting from the proposed project?
o. Describe existing drinking water supply source.
g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes AFNo ❑NA
that the public has established use of?
CI:UM 1`v
p. Describe existing storm water management or treatment systems.
1. Will wastewater or stormwater be discharged into a wetland?
❑Y es gNo ❑NA
/4044
❑Yes ❑No ❑NA
S. Activities and h0pa6ts ,
a. Will the project be for commercial, public, or private use?
❑Commensal ❑Public(Govemment
4Private /Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
A6 S 10E1U1-74 L [r 5,L-- /A/ CoA-11 U.-1 c 1vAI
W / n-/ A /7% 11C 4�7 .1/ i
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
A�/tGK/"7'E / � rS/h2e-E w PL'A/r%'
,Pk'" Th A� C C- 6&A.) C-pe
4 AM iMA.14 - IZIeJt J
d. List all development activities you propose. C-Cj /t/ S j.RU C— N&W A /N
CX /S /-ZM('o A61 &"44 /Lf F
e. Are the proposed activities maintenance of an existing project, new work, or both?
f. What is the approximate total disturbed land area resulting from the proposed project?
WSq.Ft or ❑Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes AFNo ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
1. Will wastewater or stormwater be discharged into a wetland?
❑Y es gNo ❑NA
If yes, will this discharged water be of the same salinity as the receiving water?
❑Yes ❑No ❑NA
J. Is there any mitigation proposed?
❑Yes No ❑NA
If yes, attach a mitigation proposal.
<Form continues on back>
252 - 808 -2808 :: 7- 888.4RCOAST :: www.necoastalmanagement.not
Form DCM MP -1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed applicetion form, (MP - -1) the following Items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) - (l) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required Items below.
a. A project narrative. A
b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, dearly indicate on maps, plats, drawings to distinguish
between work completed and proposed. ✓
c. A site or location map that is suffidently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management
Name ,t'rG .4,u 4 9 Arz ` 19XA• S Nd-Ju 7 -DAJ Phone No.
Address 2 t GE-OR2 b2,) S JZ 2Ct Al G, lCi4. 20 1& 51
Name GQoF7 -ZW t)1O Atlr- C&ye p. Phone No.
Address 2- Lt 43 t*4 al TS Al 4 [D r 01 AAW ti�tK di}. z3 s-Z�"o
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract Include permit numbers, permidee, and issuing dates.
r'P# SgosSfj � IIli 7D A/44;cy &Cdz, &14
h. Signed consultant or agent authorization form, if applicable
i. Wetland delineation, if necessary.
J. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owned
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. I I 3 1 -10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. t;Vriification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up
monitoring of the project.
I further certify that the information provided in this application pis truthful to the best of my knowledge.
1
Date 1-� ' A) 3 Print Name 1 V ct n C V E' 1 W,R/ uA k
Please indicate application attachme pertaining to your proposed prof ct. :11J ,NDCM MP -2 Excavation and Fill Info atio AUG — $ 2 QDCM MP -5 ridges and Cul erts U�L 19 2013 ❑DCM MP -3 Upland Development ❑DCM MP-4 Structures Information , , - . ,
252- 808 -2808 :: 1. 888- 4RCOAST :: www.nccoastaimanagement.net
4
r '
Form DCM MP -2
EXCAVATI
(Except for bridges and cuW
AUG - 8 2013
r L
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1.
JUL ' 9 2013
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and /or fill activities. All values should be given In feet.
Joint
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards.
c. (i) Does the area to be excavated include coastal wetiands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW - ❑SAV ❑SB
OWL ❑None
(ii) Describe the purpose of the excavation in these areas:
d. High -ground excavation In cubic yards.
�7. DISPOSAi; QI� EXCAVATED MATERNAL' - IIThis section notepplicable
a. Location of disposal area. b. Dimensions of disposal area.
c. (1) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance?
❑Yes ❑No ❑NA ❑Yes ❑No ❑NA
(ii) If no, attach a letter granting permission from the owner. (ii) If yes, where?
e. (i) Does the disposal area include any coastal wetlands /marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SIB),
or other wetlands (WL)? If any Boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ❑None
(fi) Describe the purpose of disposal In these areas:
f. (i) Does the disposal include any area in the water?
❑Yes ❑No ❑NA
(ii) If yes, how much water area is affected?
252 - 808.2808 :: 1- 888.4RCOA8T :: www.necoastalmanagernent.net revised: 12/26106
Access
Other
Chan el
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
(excluding
NWL
Breakwater
shoreline
stabilization
Length
Width
Avg. Existing
Depth
-
- NA
NA
Final Project
Depth
NA'...
NA
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards.
c. (i) Does the area to be excavated include coastal wetiands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW - ❑SAV ❑SB
OWL ❑None
(ii) Describe the purpose of the excavation in these areas:
d. High -ground excavation In cubic yards.
�7. DISPOSAi; QI� EXCAVATED MATERNAL' - IIThis section notepplicable
a. Location of disposal area. b. Dimensions of disposal area.
c. (1) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance?
❑Yes ❑No ❑NA ❑Yes ❑No ❑NA
(ii) If no, attach a letter granting permission from the owner. (ii) If yes, where?
e. (i) Does the disposal area include any coastal wetlands /marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SIB),
or other wetlands (WL)? If any Boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ❑None
(fi) Describe the purpose of disposal In these areas:
f. (i) Does the disposal include any area in the water?
❑Yes ❑No ❑NA
(ii) If yes, how much water area is affected?
252 - 808.2808 :: 1- 888.4RCOA8T :: www.necoastalmanagernent.net revised: 12/26106
Form ®CM MP -2 (Excavation and Fill, Page 2 of 2) ' .
3 SHORELINE STABILIZATION ' ❑This section not appll ble
(If development is a wood grin, use MP-4 - Structures)
a- Tvoe of shoreline stabilization: b. Length: S
�$uikhead ❑ Riprap ❑Breakwater /Sill ❑Other.
c. �Average distance waterward of NHW or NWL:
Width: or
d. Maximum distance waterward of NHW or NWL:
32'
e. Type of stabilization material: f. (1) Has there been shoreline erosion during preceding 12
Vin Y L months?
%Yes []No ❑NA
(ii) If yes, state amount of erosion and source of erosion amount
Information.
Iv r
g. Number of square feet of fill to be placed below water level.
)( Bulkhead backfill Riprap
Breakwater /Sill Other
1. Source of fill material.
(vrilrn 6?tif1A 5U�'�G�a2 — /fr�tfi 61-'0 LICl '
Sou ✓t c 6-
h. Type of fill material.
14r ,,-� if G rz(x, A► T> 171 R j
4.. OTHER FILL ACTImiES CJ7his section notapplieable
(Excluding shoreline Stabilization) ,
a. (i) Will fill material be brought to the site? []Yes []No ❑NA b. (1) Will fill material be placed in coastal wetlands/marsh (CW),
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
submerged aquatic vegetation tt~), sneu Doaom too), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL []None
(ii) Describe the purpose of the fill in these areas:
15. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline,
controlled? badchoe, or hydraulic dredge)?
AuLKlfYfir7 AA)rJ S-L7 tDUC f�JfiLJC( j
C. (i) Will na atlonai aids be required as a result of the project? d. (1) Will wetlands be crossed in transporting equipment to project
❑Yes�No ❑NA site? []Yes o ❑NA
(11) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
Date -
firoject Name
c� � : ---
N -.�
Applicant NMI
I
>i� C G,' - 8 2013
App, llc@ni Sign re
'i1 Fa: w I s f' :f i ii''-
252. 808.2808 :: 1. 888- 4RCOAST :: www.nccoastalmanaaement.net devised: 12/26/06
JUL 1 9 2013
c� � : ---
N -.�
Applicant NMI
I
>i� C G,' - 8 2013
App, llc@ni Sign re
'i1 Fa: w I s f' :f i ii''-
252. 808.2808 :: 1. 888- 4RCOAST :: www.nccoastalmanaaement.net devised: 12/26/06
ro euw- 4 780767. --......_.. .n. Faye
<5
so
DO 4
J''
SON
`� ' 1 mole, / I l •• - 1
4 •\ � 1 1 h ° �. w I 1 l i �
238 Hunt Club Tr
Holiday Island
,EOM - s Perquimans Count
o,taa araaa aP 17 Para 4► _ "� (tuo1f '
45
I�. C7
mot, r - - —_- ,f • i ' =i- - _ Ph. r^ C { �` Tj n' r• I 7 '
L 1�
Slott
SMILE
� , a ° P'alnf - .�; •_III +aet � ^.` � .
wailit
- � -_._ ' 1 °rit --� - �•�' +eyy ¢°acts ,rte � 5 � I - -� _•��A� __ - _
C �1 PL,"
as
Nancy McHugh
Major Permit Application
Perquimans Count
1 , +� � I � �. -°, - � • ?'� qtr *.�.�L, � a -- � , � ,` — -- _ I '-
_ -_ :: c •� ' 000 '
I
l
�._-47
I!
7264nI14.ry
DRRW/Al� &IrrtlE 13ucX#t7t13 ev4tsjaec-7ruv)
Uet
i
Vt-
m
4 co -
i �
(o
•
OWA L a.
,31M fie,: -
NAWC-A? MUtuc H
23.8 F&d"r ctuiy 7X,
M�Rr-FGK� (IG P?3�f�f
SGAGE .' / � 30'
ilaTE: 7�ZZ/ /g
Pam � aF' 2
G- 7�C�tf lip H&Al>
At"
V — M•tk- �''1�c�E C.o vivL �.
Ext 5T7AJC- *uutt7tAo
"30.x'
� � ` � � • MrT �'1�v S7'L�PiSA�Ve`c _
r I
Ir \
C
� I
\ I
Q= AREA &:-Lcwov L m
AE- ec4(W1,4 --o
l.6So.sF'
9%fL = , of WIN, WATT /�L