HomeMy WebLinkAbout20211296 Ver 1_More Info Requested_20210917 September 17, 2021 DWR # 20211296 Wake County Fujifilm Diosynth Biotechnologies U.S.A., Inc. Attn: Thomas Schmalzbauer 101 J Morris Commons Lane Morrisville, NC 27560 (delivered via email to thomas.schmalzbauer@fujifilm.com) Subject: REQUEST FOR ADDITIONAL INFORMATION Project Galaxy Mr. Schmalzbauer, On September 2, 2021 (fee receipt date), the Division of Water Resources (Division) received your application requesting an Individual Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on-hold until all of the following information is received: 1. The project proposes a contractor parking and equipment staging area on the northern end of the site. This staging and parking area indicates temporary activities with permanent impacts to streams and wetlands. It does not appear this area is slated for further development. This Office believes that the contractor parking and equipment staging area can be moved or reconfigured to avoid the impacts. Please revise the plans to avoid the impacts or provide a detailed explanation of why this plan for the activity cannot be practically accomplished, reduced or reconfigured to avoid permanent impacts in this area. [15A NCAC 02H .0506(b)(1)] 2. Please enumerate all wetland and stream impacts on the site plans and clearly label impacts (Impact ID 1, 2, 3, etc.). The Division recommends highlighting by hatching or shading all impacts areas for temporary impact areas and permanent impact areas. Impact maps should clearly depict the nature of the impact, impact type, and impact amount. [15A NCAC 02H .0502(a)(9)] 3. If the U.S. Army Corps of Engineers requests a response to any comments received as a result of the Public Notice or other requests, please provide the Division with a copy of your response to the USACE. [15A NCAC 02H .0502(c)] 4. Please provide a detailed engineering plan, profile view, and cross-section of all proposed culverts. These drawings must include details regarding stream alignment in relation to pipe DocuSign Envelope ID: 7324B63D-55C7-4DA8-8E85-EE93AFD59D99 alignment, pipe slope, pipe burial, and dissipater pad. [15A NCAC 02H .0502(a) and .0502(a)(9)] 5. Please provide the Division with a copy of any information submitted to the USACE regarding the proposed roadway from Green Oaks Parkway between Thomas Mill Road and NC 55 to the proposed location of Project Galaxy. On September 14, 2021, the USACE indicated sufficient information on this roadway had not been received to support the proposal. The Division has similar concerns regarding the roadway. [15A NCAC 02H .0502(c)] 6. This Office believes that the northern entrance road can be moved or reconfigured to avoid the impacts to streams and/or wetlands. Please revise the plans to avoid the impacts or provide a detailed explanation of why this plan for the activity cannot be practically accomplished, reduced or reconfigured to avoid permanent impacts in this area. [15A NCAC 02H .0506(b)(1)] 7. This Office believes that the access road on the western end of the site near the Lab and admin building (Impact ID 7) can be moved or reconfigured to avoid or minimize the multiple impacts to the wetland. Please revise the plans to avoid the impacts or provide a detailed explanation of why this plan for the activity cannot be practically accomplished, reduced or reconfigured to avoid permanent impacts in this area. [15A NCAC 02H .0506(b)(1)] 8. This Office believes that the southern north-south road can be moved or reconfigured to avoid the impacts and loss of stream at Impact ID 8. Please revise the plans to avoid the impacts or provide a detailed explanation of why this plan for the activity cannot be practically accomplished, reduced or reconfigured to avoid permanent impacts in this area. [15A NCAC 02H .0506(b)(1)] 9. You have indicated that the southern electrical pad may need to be relocated from its currently proposed location. Please provide detailed impact maps (see #2 above) and a revised impact table for the new pad location if the any additional or changed impacts are proposed. [15A NCAC 02H .0502(c)] Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please respond in writing within 30 calendar days of receipt of this letter by sending one (1) copy of all of the above requested information to the 401 & Buffer Permitting Branch, 1617 Mail Service Center, Raleigh, NC 27699-1617 OR by submitting all of the above requested information through this link: https://edocs.deq.nc.gov/Forms/Supplemental-Information-Form (note the DWR# requested on the link is referenced above). If all of the requested information is not received within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be denied as incomplete. The denial of this DocuSign Envelope ID: 7324B63D-55C7-4DA8-8E85-EE93AFD59D99 project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please be aware that you have no authorization under the Section 401 of the Clean Water Act for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Please contact Rick Trone at rick.trone@ncdenr.gov if you have any questions or concerns. Sincerely, Paul Wojoski, Supervisor 401 & Buffer Permitting Branch cc: Matt Michel, Timmons Group (via email) Lyle Phillips, USACE Raleigh Regulatory Field Office (via email) DWR 401 & Buffer Permitting Branch file Filename: 20211296 Ver 1_Project Galaxy_Wake_RFAI DocuSign Envelope ID: 7324B63D-55C7-4DA8-8E85-EE93AFD59D99