HomeMy WebLinkAboutNC0020656_Recon Inspection_20030305At7A NCDENR North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor March 5, 2003 CERTIFIED MAIL RETURN RECEIPT REQUESTED The Honorable Ann B. Slaughter Mayor, City of Laurinburg PO Box 249 Laurinburg, NC 28352 SUBJECT: NOTICE OF VIOLATION Reconnaissance Inspection _ City of Laurinburg Wastewater Treatment Facility NPDES Permit No. NC20656 Scotland County William G. Ross, Jr., Secretary Alan Klimek, P.E., Director Division of Water Quality Dear Mayor Slaughter: On February 18, 2003, Don Register and Belinda Henson, of the Fayetteville Regional Office, Division of Water Quality, visited the Leith Creek Wastewater Treatment Facility. After speaking with Mr. Ricky Odum, Back-up ORC, staff proceeded to inspect the recently rebuilt secondary clarifiers. The chlorine contact chamber was also inspected and staff witnessed activated sludge solids flowing through the unit into the effluent channel (see below). Staff, at that time, proceeded to find Mr. Odum to alert him of the solids washout and to stop it immediately. Fayetteville Regional Office . . •u_ a_.L n__ r nooni cnno Mayor Slaughter Page 2 March 5, 2003 It is the opinion of this office that the discharge of solids in this manner is a violation of your NPDES Permit Part II Section C. 2 that states: Proper Operation and Maintenance- "The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of this permit". • While waiting for the violation to stop, Mr. Robert Ellis, the operator in responsible charge (ORC) of the facility arrived on site. When he was asked the reason for the violation, he commented that it must be the recent rain in the area that was washing' the solids out. The clarifier overflow rates did not appear to be excessive, which would indicate high flows. Upon request, Ricky Odum, checked the sludge blanket depth of the #1 clairifier (which was not overflowing the weirs) and it appeared to be a nine foot blanket in a 12 ft. deep sidewall depth. The #2 clarifier, the one overflowing solids at that particular time, appeared to be overloaded with solids or the solids had a settling problem. Judging by the requested flow data received for the week of the violation, the flow did not appear to be too high. The day of the violation, the total daily flow was measured at 3.557 MGD (permitted flow.4 MGD) and the 24 hour effluent composite sample measured at 650 mg/1 for the total suspended solids (620 mg/1 over the Town's limit of 30 mg/1). This office is requesting the following data to help determine the source(s) of the problem noted. Typically, problems can be generally categorized as design or operational. We ask that you provide the following information for the, months of September 2002 through February 2003 on or before April 15, 2003: 1. The dates of the usage of the equalization basin and the flows (MGD) that was diverted to the EQ basin. 2. Copies of weekly circular flow charts. 3. Each of the aeration basin (MLTSS) mixed liquor total suspended solids analysis in mg/1. 4. The clarifier blanket readings recorded for each clarifier. 5. The date and the number cif gallons wasted to the digester. 6. The level of the digester each day. 7. The biosolids land application events for 2002 and the volume applied during each event. 8. The calculation(s) used to determine sludge wasting. 9. A plan of action to prevent discharges of similar nature from reoccurring. In addition to the above, we would like to draw your attention to the attached Compliance Biomonitoring Inspection for the inspection conducted the week of March 26, 2001. Please note during that inspection, regional staff observed a similar discharge of high solids and a Notice of Violation was also forwarded at that time. By documenting two (2) occurrences where waste solids were leaving the municipal wastewater treatment facility in a manner inconsistent withthe permit, this office has no choice but to consider this a reoccurring problem. As previously requested, we ask that you provide a plan of action that will prevent further violations of this nature. Mayor Slaughter Page 3 March 5, 2003 Please be advised that this notice does not prevent the Division of Water Quality from taking enforcement actions for the violation(s) noted or any violation past or future. Your response to this letter will be considered in determining if further action, to include civil penalties, will be warranted. Should you have any questions regarding this matter, please do not hesitate to contact me at 910-486- 1541. Paul E. Rawls Water Quality Regional Supervisor PER:DR/BH:bs Enclosures cc: Robert Ellis, ORC, City of Laurinburg Ricky Odum, Back-up ORC, City of Laurinburg Shannon Langley, DWQ NPDES Compliance Unit Hope Walters, DWQ Operator Training and Certification Unit FRO DWQ File Division of Water Quality Fayetteville Regional Office MichaelF. Easley, Governor William G. Ross, Jr., Secretary Kerr T. Stevens, Director The Honorable Ann Slaughter Mayor, City of Laurinburg P.O. Box 520 Laurinburg,.NC 28379 Subject: April.17, 2001 NOTICE OF VIOLATION, . COMPLIANCE BIOMONITORING INSPECTION City of Laurinburg Wastewater Treatment Plant NPDES Permit No. NC0020656 Scotland County Dear Ms. Slaughter: Enclosed you will . find a. copy of the Compliance Biomonitoring Inspection report for the inspection conducted the week of March 26, 2001. The inspection included the same objectives as that of a routine Compliance Evaluation Inspection (conducted•on March 26, 2001) plus an Aquatic Toxicity •(AT) test to evaluate the. biological effect of the facility's discharge on test organisms. • As part of the inspection a tour •of the Wastewater Treatment Plant Was conducted. All observations and recommendations are in Part D: Summary of Findings/Comments of this inspection report. A 24-hour 001 effluent composite.sample was collected at your facility on March 27 and on March. 30. s The aquatic toxicity samples were sent to the Division of•Water Quality Aquatic Toxicology Laboratory (located on Reedy Creek Road in Raleigh). • The chronic Ceriodaphnia. dubia 31% pass/fail toxicity test using these samples resulted in a Pass, indicating that the effluent would not be predicted to have water quality impacts on the receiving waters. Additionally, on March 27, .the 24-hour Outfall 001 effluent was sampledfor. the following parameters:. Biochemical Oxygen Demand (BOD), Ammonia as nitrogen, Total Kjeldahl Nitrogen, Nitrite plus Nitrate as ,nitrogen, Total. Phosphorus, Copper, and Zinc: On Friday, March 30, a TSS sample was collected from DWQ"s composite sample (collected from noon on March 29`" to noon on March 30th and quickly processed by the DWQ Laboratory in Raleigh); the TSS result was 370 mg/L (which does not agree with the result of the TSS for the composite collected by your facility for the approximate time period of 8:30 AM on March 29th to 8:30 AM on March 30`h). That TSS result was 58 mg/L.. On April 4ththe 24-hour composite sample collected by your facility during the time period of 8:30 AM on Tuesday, April 3d to 8:30 AM on Wednesday April 4th, was split. A TSS sample and a • BOD sample were sent to our DWQ laboratory. The laboratory results of the pending chemistry analyses will be forwarded to you when they. are completed by the Division of Water Quality Chemistry Laboratory, located on Reedy Creek Roadin Raleigh. 225 GREEN STREET - SUITE 714 / SYSTEL BUILDING / FAYETTEVILLE, NC 28301-5043 PHONE (910) 486-1541 FAX (910) 486-0707 WWW.ENR.STATE.NC.USiFNR! AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10% POST CONSUMER PAPER DENR TOLL FREE HOTLINE: 1-877-623-6748 copy of the following information was left with Ricky Odum: 1. NPDES Compliance Reminders, 2. Vector Attraction and Pathogens - Class B, 3. An invitation for no cost Operator Wastewater Training on April 6, 2001 at the DWQ-Fayetteville Regional Office (a FAX of this invitation was also sent to Robert Ellis). Based on observations and sample taken, this office considers the Town. of Laurinburg in violation of NPDES permit Part IL Section C. 2. Proper Operation and Maintenance — permittee shall at all times properly operate. and maintain all facilities and systemsof treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions ofthis permit." The following itemsare addressed in this report as violations of the NPDES permit: 1) On the day of the inspection; Monday, March 26,. solids at clarifier #1 were overflowing into the chlorine contact chamber. Solids.had not been wasted since January 2001. 2) Digester capacity was full of solids through the entire week of March 26. 3) The TSS sample, collected from noon on Thursday (March 29) to noon on Friday (March '30) by DWQ, was 370 mg/L. 4) On Friday, March 30, condoms were floating in the chlorine contact chamber: 5) The chlorine contact chamber. was not properly maintained. The walls need immediate repair. This office is very concerned about the solids inventory of the WWTP: We feel that such inventory had reached a critical level due to the reported MLSS of between 5580 to 5880 mg/L. It is our understanding that your target MLSS is 2500. mg/L and that by not disposing of waste residuals (land applying) in a timely manner had resulted in the excessive solids observed and measured leaving your facility: We are requesting that your facility empty your digesters on a more frequent basis. You are asked to perform and document weekly monitoring of the sludge depth in the chlorine contact chambers until further notice. This data will be reviewed during future inspections. You are asked to send a response letter to this office within ten (10) days of receiving this report with a timeline for fixing the holes in the walls of the chlorine contact chamber. The response letter should also address the corrective action(s) that will be taken to eliminate the excessive sludge in the clarifiers; chlorine contact chambers, and digesters:. •Mayor Slaughter Page 3:. April 17, 2001 If you have any questions or comments concerning this report or require clarification. on part(s) of this. report,- please feel free to contact me at 910/486-1541. .Sineereiy,-). ;l1 Paul Rawls . Water. Quality Regional Supervisor. DL:PR/dl Enclosures: Schematic of WWTP., FACILITY SITE REVIEW cc: Kevin Bowden, DWQ, ESB, ATU, Dan Register DWQ-FRO Robert Ellis, City of Laurinburg, (ORC) Ricky Odum, City of Laurinburg, (Backup-ORC) NPDES COMPLIANCE INSPECTION REPORT North Carolina Division of Water Quality Fayetteville Regional Office Section A. National Data System Coding Transaction Code: N Inspector: S NPDES NO. NC0020656 Facility -Type: 1 Facility Evaluation Rating: 3 BI: N QA: N Section B: Facility Data • Name. and Location of Facility Inspected: City of Laurinburg WWTP (Leith Creek) Entry Time: 10:00 AM Exit Time/Date: 02:35 PMi010326 Name(s), Title(s) of On -Site Representative(s): Robert Ellis — (Certified Grade IV) — "ORC" Ricky Odum ---(Certified Grade III) --- "Backup ORC" Name, Title and Address of Responsible Official: Ms: Ann Slaughter, Mayor P.O. Box 249 Laurinburg, NC 28352 Date: 010327 Inspection Type: B Reserved: Reserved: Permit Effective Date: 010301 Permit Expiration Date: 040831 Contacted: No Section C: Areas Evaluated during Inspection (S = Satisfactory, M = Marginal, U = Unsatisfactory, N = Not Evaluated, N/A = Not Applicable) Pei niit: = S Facility Site Review: M. Laboratory: S Pretreatment:. N/A Self -Monitoring Prograin: S Sludge Disposal: NI Records/Reports: S Flow Measurement: S Effluent/Receiving Waters: S Compliance Schedule: N/A Operation & Maintenance: 1N1 Mayor Slaughter Page 5 April 17, 2001 Laurinburg (Leith Creek) Wastewater Treatment Plant (WWTP) BIOMONITORING EVALUTATION INSPECTION. performed during the week of March 26, 2001 DESCRIPTION OF LAURINGBURG WWTP: The Laurinburg WWTP is a 4 MGD wastewater'treatment facility consisting of mechanical bar screen, • mechanical grit removal, influent Parshall Flume and ultrasonic - flow monitoring .device,• aerated equalization basin (E.Q. basin), influent pump station (overflow from the influent pump station goes to the E.Q. pump station, and then to a 6MG.E.Q. basin with six floating aerators), flow splitter box divides flow:'equally between dual extended .aeration.basins (both: aeration basins with. secondary clarification), 2 MGD oxidation ditch with secondary clarification, dualchlorine contact basin, effluent force main pumps treated wastewater approximately one mile to the effluent Parshall Flume (equipped with ultrasonic flow monitoring device), cascade aeration, and discharge of treated wastewater into Big Shoe Heel Creek (Lumber River Basin) Sludge is treated in two aerobic • digesters and sludge drying beds, then land applied at the Laurinburg Maxton AirportCommission land application site. SECTION D: SUMMARY OF FINDINGS/COMMENTS: _ PLANT TOUR--- 1. The facility has influent and effluent flow meters. The effluent flow is used for reporting. 2... The effluent composite sampler is flow proportional (constant volume/variable time), sampling every 50,000 gallons. It has been flowproportional for approximately five years. 3. The automatic climber bar screen has not been operational for three to four weeks (waiting for worm gear replacement items). Screenings go to the Scotland County Landfill. 4. The effluent composite sampler temperature was 5 degrees Celsius. 5. The grit removal system was operational. All grit goes to the Scotland County Landfill. 6. There is a workorder to replace the rails in the influent pump station. 7. The generator at the influent pump station is tested once per month. 8. Influent pumps are tested daily (each morning). 9. The ultrasonic flow -measuring device was installed in November 2000. 10. Land application will occur next week, Monday April 2, at the LMAC land application site. They will remove 700,000 gallons. Both of the aerobic digesters are full. 11. Launders of the clarifiers are cleaned daily. 12. In the winter, it takes approximately 2 to 3 months to dry sludge in the drying beds.. In the summer, it takes approximately 1 month. 13. Solids from the large and small digesters are land applied; solids from the small digester are applied to the drying beds. 14. Routine plant maintenance includes changing the oil in the aerators annually, and inspecting the pump impellers once every 3 months. Mayor Slaughter Page 6 April 17, 2001 15. Sludge blankets in the clarifiers on Monday,. March 26: CLARIFIER # CLARIFIER DEPTH SLUDGE BLANKET DEPTH #1 12 feet ;Solids overflowing • #2 12 feet 5 feet #3 12 feet 5 feet .:... . Sludge blankets in the clarifiers: on Friday, March 30: CLARIFIER # CLARIFIER DEPTH SLUDGE BLANKET DEPTH ,.- Unit #1 12 feet 10 feet Unit #2 12 feet " 12 feet Unit #3 .. . 12 feet . 11 feet Sludge blankets iri the chlorine contact chambers on Tuesday, March 27: CHLORINE CONTACT # Unit# 1 CHAMBER DEPTH 10 feet SLUDGE BLANKET. DEPTH ` 3 feet Unit # 2 10 feet 4feet Unit. # 3 none none Starting on the afternoon of Tuesday, March 27, both chlorine contact chambers were cleaned. Sludge blankets in the chlorine contact chambers on Friday, March 30:. CHLORINE CONTACT # Unit #1 CHAMBER DEPTH 10 feet SLUDGE BLANKET DEPTH * . 5 feet Unit #2 Unit #3 10 feet * 5 feet none none .* Please note the significant increase in the solids from 3/27 to 3/30. 16. Climbing Mechanical Bar Screen is not in operation due to gearbox. repair (waiting for the main drive worm gear replacement items). This has not caused compliance problems. • 17. During the inspection the back-up ORC initiated cleaning of Contact Basin #1, followed by #2. Normally, the chlorine contact basins are cleaned out once per month. 18. Two of the walls of Chlorine Contact Basin #1 areeroded completely through at the surface. and one wall of Chlorine Contact Basin #2 is also eroded badly. Mayor Slaughter Page 7 April 17, 2001 LABORATORY TOUR -- Laboratory parameters that are analyzed on site: pH, Total Residual Chlorine, Biochemical Oxygen Demand (BOD), Total Suspended Solids (TSS), Fecal Coliform,.Dissolved Oxygen, Conductivity, Ammonia Nitrogen, and temperature Metals (Hg, Cu, and Zn), Total Nitrogen (NH3, NO2; NO3, and TKN) and Total Phosphorus are sent to Oxford Laboratories, Inc: Chronic Toxicity is analyzed at Burlington Research. The pH buffer.: expiration dates are: HACH LOT # EXPIRATION DATE PH BUFFER A0230 : ` August 17, 2004 : 4 A0230 _ August 17, 2002 7 A0066 :. * March 6, 2001 10 *. Expired The millivolts of the,7 pH buffer is 21.2 mV TSS weights are Class S. A 1 mg, 10 mg, and 50 mg weight crosscheck is performed quarterly, and a 50 mg weight iscrosscheck daily.. . Laboratory temperatures: Instrument Temperature (degrees C) BOD Incubator_ . .20.7 Fecal-Coliform 44.4 TSS Drying Oven 106 Sample Refrigerator.. 3 8. An NIST crosscheck of all of the thermometers is performed and documentedannuaiiy. 9. The YSI Model 5100 is used for measuring the IDO and FDO of the BOD. The membrane is changed every three weeks. 10. The BOD GGA standard is purchased from North Central Laboratory. RECORDKEEPING:AND REPORTING: Eighty-four DMR data points from December 2000 were crosschecked with the laboratory bench. All data points were in agreement. Slaughter Page 8 April 17, 2001 RECOMMENDATIONS--- 1. Recommend that, in order to calculate the % error, the calibration. report sheet of the ultrasonic flowmeter at the Parshall Flume have the ultrasonic's reading beforeand after calibration, and the Parshall Flume's head measurement (in inches at the ultrasonic flowmeter location). According to 15A NCAC 2B .0505 (b) (1): "Devices selected shall be capable of measuring flows with a maximum deviation of less than 10 percent from true discharge.v.olumes. Flow, measurement devices shall be accurately calibrated at a minimum of once per year and :Maintained to ensure that the accuracy of the measurements are consistent with the accepted capability of that type of device.".:;-- .. 2. Remind. the facility that the following parameters are to be run on a grab sample: Chlorine, pH, Dissolved Oxygen, and Fecal. Coliform.. . . ' • - 3. Require that the pH, dissolved oxygen; and chlorine analyses be performed within fifteen minutes of collection as according to 40 CFR 136, page 29, Table II ---Required Containers, Preservation Techniques, and Holding Times: `Analyze immediately' usually means within 15 minutes or less of sample collection." .4. Recommend that the chlorine contact chamber be cleaned out when the sludge depth is no greater than one foot deep in the chamber. 5. Suggest that your facility empty the digesters on a quarterly basis to minimize the solids in the plant. 6. Require that your facility perform and. document weekly monitoring of the sludge depth in the chlorine contact chambers. ' • . -` 7. Require that your facility send this office a response letter within ten days of receiving this report addressing a timeline for fixing the holes .in the walls of the chlorine contact chamber and also addressing the corrective actions thatwill be taken to eliminate the excessive sludge in the clarifiers, chlorine contact chambers, and the digesters. ` 8. Require that your laboratory10 pH buffer be replaced because it has exceeded the expiration date.. .. .• 9. Since the effluent composite sample refrigerator temperature was:5 degrees Celsius, recommend that samples be collected, transported, and stored as according to the official storage temperature requirement published in 40 CFR Part 136.3(e), Table II. The acceptable temperature range is 0 to 4 degrees Centigrade. . However, the sample must not be frozen, especially for a biological sample. -The intent of cooling samples to 4 degrees Centigrade is to minimize any biological and chemical reactions such that the integrity of the sample is not compromised. Name aupignature of Insp ,ctor Agency/Office/Telephone Dale Lopez `�,��',� {.�, NCDENR/Fayetteville/(9 1 0) 486-1541 Don Register ``= = ; . 7 j> NCDENR/Fayetteville/(910) 486-1541 ' 1,; Name and Signature of Reviewer Agency/Office/Telephone Belinda Henson NCDENR/Fayetteville/(910) 486-1541 art 1-114..00 Date Date Mayor Slaughter• Page9. April 17, 2001 Action Taken Regulatory Office Use Only Compliance Status Noncompliance _Compliance Date /i s gC1 �r',A,lc':oF wrs1TWA;cIz Flaw 1-tncD S-Ncoopocj[,- nl .)-1A r= 5521pl. ND. cot . MA`;' -,s, ►yea ao�, • jJ A"E_LA71o1J �.9SIN 0 - 0 Ca tfi�LL*�,j GAL EQv�n.L�?�TT�r.J 3�Sr�l &42,1 S tNJ° .464l7-0 ENT ve« r^G DAY L_ LCU 7 $.o r.-' C- r11X17.t! A_ U71uN ' aS!1J 1.- MGD 0 0 0 FGw 0.5-NF • N -r1cA6 .pv46_ (CC1J!' t DZ%74v RPDS 0- P7_LM1L CU?c1:1EZ N. 2_ ZCIECUI.PMDJ Feu m P '11,1 ,7 c f r yr �� DE ctAcrFlaE 1 >_ Si.vreDE-ywe. DS f�En 11nV nasi 1Jj• 3 Dt.'7AcT SaSln1 Ave._ ra .. ) ./ Ai1LE T//ems s.F IEEL Section D:_SIunmary of Findings/Comments Brief Facility Description: '(' tin 2�)b56 /P,9rj? FACILITY SITE REVIEW . Yes 6N/A 1 . Treatment units properly operated and maintained. .FL 1-)/(;-1) Yes &c, N/A 2. Standby power or other equivalent provision provided. � y • Yes C9 N/A.. 3. Adequate•alarm system for power or equipment failure available, 4. .Sludge disposal procedures appropriate: Ye No N/A a. Disposal of sludge according to regulations No N/A b. State approval for sludge disposal received. Yes io1 N/A 5 All treatment units other than backup units in service.(f./'b' SC'i'CC h /5 Yes 6Tc�' N/A 6. Sufficient sludge disposed of to maintain treatment process equilibrium. CZ -es) No N/A 7.: .Adequate number of qualif ed operators on staff. Y9>%No N/A 8. Established procedures available for.training new employees. Yes i Tp) N/A 9. Adequate spare parts and supplies inventory maintained. . Yes Yes Yes NIA 10. a. Hydraulic overflows and/or organic overloads experienced N/A b. Untreated bypass discharge occurs during power failure N/A c. Untreated overflows occurred since last inspection. est No N/A 11. Plant has general safety structures such as rails around or covers over tanks, pits, or wells.. . es; No N/A 12. Plant is generally clean, free from. open trash areas. Yes No N/A No ..N/A Yes LI§ • N/A Ye No. N/A Yes N ' N/A Yes wi NIA des:) N/A h Yes No - N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No. N/A -Yes No N/A Yes No N/A Yes No N/A Yes No NIA . Yes No N/A • Yes No N/A .Yes No N/A Yes No N/A • Yes No N/A Yes No N/A 13. Screening: a. Manual b. -Mechanical Gcvr GF S�ot'�'1� E c. Buildup of de ris : . d. Screenings properly disposed of. Page 2 7-2-'h'EE. c.47 Fe?cif; 14. Grit Removal: a. Excessive organic content in the grit chamber b. Excessiveodors c. Grit properly disposed of. 15: • Primary clarifier: a. Excessive gas bubbles' b. • Black and odorous wastewater c. Poor suspended solids removed . d:• Excessive buildup of'solids-in center well of circular clarifier e. Weirs level f. Weir blockage • . g. Evidence of short circuiting h. Lack of adequate scum removal I. Excessive floating sludge j. Broken sludge scraper. 16 Trickling Filter:_ a. Trickling filter ponding(indicating clogged media) • b: Leak at center column of trickling •filter's- distribution arms. c.. Uneven distribution of flow on trickling filter surface • d.' • Uneven or discolored growth. -e. Excessive sloughing of growth • _ f. - Odor g. • Clogging of trickling filter's distribution arm orifices h. Filter. flies, worms, or snails: 17 Rotating Biological Contactors (RBC): . Yes No N/A a. Development of white biomass on rotating biological contactor media • Yes No N/A b. Excessive sloughing of growth Yes No NIA , c. Excessive breakage of rotating disks or shafts in RBC units Yes No N/A d. Excessive breakage of paddles on brush aerators Yes No NIA) e. Shaft, bearing, drive gear, or motor failure on disk or brush aerators. Page 3 Cy_ pi) No NrA Yes i T N/A Yes No 63 No N/A NIA Yes Yes Yes Yes No Yes No Yes No Yes No Yes N/A Yes N/A Yes i o N/A. .Yes N/A • Yes ' ' N/A. Yes o) N/A Yes i 9) • N/A N/A No N/A o N/A Yes Yes Yes Yes Yes Yes No No No No No No 18. Activated Sludge Basins/Oxidation Ditches: a. Dead spots b. Failure of surface aerators c. Air rising in clumps d: Dark foam or bad color., e.. Thick billows of White, sudsy foam f. Air rising unevenly g. Excessive air leaks in compressed air piping. 19. 'Stabilization Ponds/Lagoons: a. Excessive weeds including duckweed in stabilization ponds b Dead fish or aquatic organisms c. Buildup of solids around influent pipe d: Excessive scum on surface. 2 /"1 21. N/A N/A N/A N/A N/A N/A (re No N/A ) No N/A • j No N/A • Yes No NiA Yes No 2, Yes No ")IL4) Yes No NiA Yes No N/A Secondary Clarifier: a. Excessive gas bubbles on surface b. Unlevel overflow weirs c. Weir blockage d. Evidence of short circuiting e. Excessive buildup of solids in center well of circular clarifier f. Pin floc in overflow g. Ineffective scum rake h. Floating sludge on surface i. Excessive high sludge blanket j. Clogged sludge withdrawal ports on secondary clarifier. Filtration: a: ' Filter surface clogging . Short filter run c. Gravel displacement' of filter media d. Loss of filter media during backwashing e. Recycled filter. backwash water in excess of 5 percent • f. Formation of mudballs in filter media. 22. Chlorination Unit: Sludge buildup in contact chamber Gas bubbles Floating scum and/or solids. Adequate ventilation of chlorine feeding room and storage area NIOSH-approved 30 minute air pack • All standing chlorine cylinders chained in place All personnel trained in the use of chlorine Proper chlorine feed, storage,_ and reserve supply. a. b. c. d. e. f. g• h. Page 4 23. Ultraviolet radiation disinfection present and in use. 7—Th 24. Dechlorination: N/A N/A NIA Yes No Yes No Yes No Yes No a. Proper storage of sulfur dioxide cylinders b. Adequate ventilation of sulfur dioxide feeding room c. Automatic sulfur dioxide feed or feedback control not operating properly. 25. Aerobic Digester: Yes N/A a ExcessiVe foaming in tank Yes 9) N/A: b. Noxious odor Yes No N/A c. Mechanical aeration failure Yes No N/A d. Clogging of diffusers. 26. naerobic Digester: Yes No N/A a. Floating cover tilting Yes No N/A b. Gas burner operative Yes No N/A c. Supernatant has a sour odor. 27. Sludge Drying and/or disposal: Yes (NIg',-- ) N/A.:..a. Poor sludge distribution on drying beds. ?;-.1 No N/A b. Vegetation in drying beds _13) No N/A c. Dry sludge remaining in drying beds • 6..eS) No NIA d. Dry sludge stored on site (es) No N/A e. Filtrate from sludge drying beds returned to front. of plant (Ye) No ' NIA f. Approved:disposal site for the sludge iYes) No N/A EY... Sludge land applied. .......„ Yes No Yes 'NO • Yes No yes No Yes No Yes No Yes No N/A N/A N/A N/A N!A 1N/A 28. Fitter Press: A. High level of solids in filtrate from filter presses or vacuum filters -b. Thin filter cake caused by poor dewatering c. Sludge buildup on beltsand/or rollers of filter press d. Excessive moisture in belt filter press sludge cake. 29. Polishing Ponds or Tanks: a. Objectionable odor, excessive foam, floating solids, or oil sheens on water surface b. Solids or scum accumulations in tank or at side of pond c. Evidence of bypassed polishing ponds or tanks because of low capacity No N/A 30. Plant Effluent: a. (Excessive suspended solids turbidity, foam, grease, scum; color, and other macroscopic particulate matter present Yes (N N/A b. Potential toxicity (dead fish, dead plant at discharge) Yes i o,' N/A c. Outfall discharge line easily accessible. 31. Flow. Measurement: es).No N/A - a. Proper placement of flow measurement device es No N/A b, Flow meter calibrated :. . Yes go,!:.N/A c: Buildup of solids in flume or weir Yes c7 N/A d. Broken or cracked flume or weir Yes�y No - " e:..Properly:functioning magnetic flometer . : Yes No f. ;Clogged or broken stilling wells. - Yes No JA` g. Weir plate edge corroded or damaged ) No N/A h. System capable of measuring maximum flow Yes No N/A i. Flow measurement error less than 10N.. 32. Sampling: es -iNo N/A. a. Sampling and analysis completed on parameters specified by permit 'S No N/A b. Samples refrigerated during compositing es,) No . N/A c. Composite sample temperatures. maintained at 0 to 4 degrees Celsius during sampling d. Contract laboratory used for sample analysis e. Composite samples obtained are flow proportional. es J No . N/A e_, No . N/A RECORDKEEPING AND REPORTING teilsT) No N/A 1. Records and reports maintained as required by permit. cs? No N/A 2. All required information available, complete, and current. pNo N/A 3. Recordsmaintained for.3 years and all sludge records maintained for 5 years. /Yes No N/A 4. Analytical results consistent with data reported on DMRs. 5. Sampling and analyses data adequate and include: e ' No N/A a. Dates, times, and location of sampling No N/A b. Name of individual performing sampling es) No N/A c. Results of analyses and calibration Y.es) No N/A . d. Dates o.f analyses. es) No N/A e. Name of person performing analyses. L'YF)No N/A ee&s No. N/A No N/A 6. Monitoring records adequate and include; a Monitoring charts kept for 3 years b. Flowmeter calibration records kept for .3'years. Page 6 No N/A 7. Laboratory equipment calibration and maintenance records adequate. No N/A 3. BOD incubator temperature maintained at 20 +/- 1 Degrees Celsius and the temperature maintained in a log for:every day of operation. 9. Fecal coliform incubator maintained at 44.5+/- 0.2Degrees Celsius and the temperature maintained in a log for every`day of operation. 10. Plant records' adequate and include EV No. N/A a. 0 & M Manual es No N/A b. "As -built" engineering drawings es) No N/A c. Schedules and dates of equipment maintenance repairs es No N/A d. Equipment data cards. Yes No �N/A11:... Permittee is meeting compliance schedule: Yes) No N/A 9NoN/A s1 No . N/A 'No N/A- • es ? No N/A es No . N/A Revised 7/11/00 by Belinda Henson' 12. DMRS complete and include all NPDES permit -required parameters. 13. ORC visitation logs available and current. 14.: ORC certified at a level equal to or greater than the classification of the wastewater facility. 15. Backup Operator certified at one level less than the classification of. the wastewater facility or greater. 16. Current copy of the complete NPDES permit on site. 17. Facility description verified as contained in NPDES permit.