HomeMy WebLinkAbout20211336 Ver 1_Meeting Request Review_20210909 tie R•.'.
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20211336 Version* 1
Regional Office* Winston-Salem Regional Office-(336)776-9800
Reviewer List* Dave Wanucha
Pre-Filing Meeting Request submitted 9/9/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Kevin Hining
Contact Email Address* kjhining@ncdot.gov
Project Name* B-5979 Hunting Hills Bridge Replacement
Project Owner* Town of Boone
Project County* Watauga
Owner Address: Street Address
567 W King Street
Address Line 2
City State/Rovince/Region
Boone NC
Fbstal/Zip Code Country
28607 United States
Is this a transportation project?* (' Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below and include location information.*
The Hunting Hills Bridge(#346)is located along Martin Luther King Jr.
drive(SR 1622,formerly Hunting Hills Lane) in Boone, North Carolina.
The existing two-lane structure crosses the South Fork New River(SFNR)
and provides the only access(closed loop)to the Hunting Hills
neighborhood as well as Town of Boone(TOB)Water Intake,a TOB
greenway trail, and a commercial business(daycare). Lands to the west
of the Bridge are owned by the TOB and include greenway trails and
parking access(trailhead);these are maintained lawn as well as riparian
forest. Lands to the east of the bridge include the TOB Intake structure
and riparian forest area owned by the National Guard Armory.
The proposed project involves replacing Bridge No.346 on Hunting Hills
Lane over the South Fork New River(SFNR)and 0.111 miles of roadway
improvements.The present structure, including two traffic lanes,one
bicycle lane, and one sidewalk, is approximately 60'in length and 24.5' in
width.The existing obsolete structure will be replaced with a 2 @ 70' L x
42'W x 24" D cored slabbed bridge on existing location.
Please attach the documentation you would like to have the meeting about.
B-5979 Env Features Map.pdf 3.16MB
B-5979 Vicinity Map.pdf 3.35MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
Submittal Date 9/9/2021
Reviewer Meeting Request Decision
Is a meeting required or is there more info needed?*
r Yes (' No
If rrnre inforr ration is needed,please add convents for the email notification below.