Loading...
HomeMy WebLinkAbout20211336 Ver 1_Meeting Request Review_20210909 tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20211336 Version* 1 Regional Office* Winston-Salem Regional Office-(336)776-9800 Reviewer List* Dave Wanucha Pre-Filing Meeting Request submitted 9/9/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Kevin Hining Contact Email Address* kjhining@ncdot.gov Project Name* B-5979 Hunting Hills Bridge Replacement Project Owner* Town of Boone Project County* Watauga Owner Address: Street Address 567 W King Street Address Line 2 City State/Rovince/Region Boone NC Fbstal/Zip Code Country 28607 United States Is this a transportation project?* (' Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information.* The Hunting Hills Bridge(#346)is located along Martin Luther King Jr. drive(SR 1622,formerly Hunting Hills Lane) in Boone, North Carolina. The existing two-lane structure crosses the South Fork New River(SFNR) and provides the only access(closed loop)to the Hunting Hills neighborhood as well as Town of Boone(TOB)Water Intake,a TOB greenway trail, and a commercial business(daycare). Lands to the west of the Bridge are owned by the TOB and include greenway trails and parking access(trailhead);these are maintained lawn as well as riparian forest. Lands to the east of the bridge include the TOB Intake structure and riparian forest area owned by the National Guard Armory. The proposed project involves replacing Bridge No.346 on Hunting Hills Lane over the South Fork New River(SFNR)and 0.111 miles of roadway improvements.The present structure, including two traffic lanes,one bicycle lane, and one sidewalk, is approximately 60'in length and 24.5' in width.The existing obsolete structure will be replaced with a 2 @ 70' L x 42'W x 24" D cored slabbed bridge on existing location. Please attach the documentation you would like to have the meeting about. B-5979 Env Features Map.pdf 3.16MB B-5979 Vicinity Map.pdf 3.35MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 9/9/2021 Reviewer Meeting Request Decision Is a meeting required or is there more info needed?* r Yes (' No If rrnre inforr ration is needed,please add convents for the email notification below.