Loading...
HomeMy WebLinkAbout20110720 Ver 4_Credit Release #1_20130814North Carolina Pat McCrory Governor August 14, 2013 Mr. Thomas L. Rinker Environmental Banc & Exchange, LLC 909 Capability Drive, Suite 3100 Raleigh, NC 27606 DWQ Project #: 2011 -0720 v4 Granville County Re: Upper Neuse River Basin Umbrella Mitigation Banking Instrument (UMBI) Hatley (Phase I) Bank Parcel Credit Release — Tasks 1, 2, 3, 7 Dear Mr. Rinker: On December 28, 2012, the Division of Water Quality, hereby referred to as Division of Water Resources (DWR) approved a Bank Parcel Development Package (BPDP) for the Hatley Bank Parcel submitted by Environmental Banc & Exchange, LLC (EBX) on August 9, 2012. On May 10, 2013, the DWR received a signed and recorded conservation easement for Phase 1 of the subject site assigned to the North Carolina Wildlife Habitat Foundation as the Grantee. Additionally, EBX has elected to construct the subject project without posting a performance bond. On June 14, 2013, DWR received an As -Built Report for Phase I of the subject site submitted by EcoEngineering on behalf of EBX. On August 9, 2013, Katie Merritt, with DWR, with assistance from Aaron Speaks with EBX, inspected the site to compare site conditions with the As -Built report and confirm that the subject site had been completely planted and monitoring devices had been established. According to the UMBI signed on February 10, 2012, the following Project Milestones have been met, and the corresponding credits shall be released: Task /Milestones Credit 1) Approval of BPDP, Conservation Easement Recorded and Financial 20% Assurance posted (not needed for this Bank) 2) Mitigation Site Earthwork, Planting and Installation of Monitoring 20% Devices completed Wetlands, Buffers, Streams - Compliance and Permitting (Webscape) Unit 1650 Mail Service Center, Raleigh, North Carolina 27699 -1650 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919 - 807 -63001 FAX: 919 - 807 -6494 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer EBX August 14, 2013 Page 2 of 2 3) Monitoring Financial Assurance Posted and Approval of 10% As -Built Report 7) Item B (1) of Section IX (assign conservation easement to land trust or 5% stewardship) has been completed and approved by DWQ TOTAL: 55% By copy of this correspondence, DWR confirms that you have satisfied the above requirements for the above - referenced tract and 55% of your Neuse riparian buffer credits (0.55 x 310,838 ft' = 170,960.90 ft2) are now available for sale. Additionally, 55% of your nitrogen nutrient offset credits (0.55 x 16,774.88 lb -N = 9,226.181b -N) and 55% of your phosphorous nutrient offset credits (0.55 x 1,080.43 lb -P = 594.24 lb -P) are now available for sale. Please note that nutrient offset credits generated at this site must be used for impacts in HUC 03020201 of the Upper and Lower Falls Lake Watersheds as defined in 15A NCAC 02B .0276 and provided in 15A NCAC 02B .0282. Additionally, the riparian buffer credits must be used for impacts in the Neuse River Basin according to guidelines in 15A NCAC 02B .0242. Please use the attached Credit Ledger Template to track and report credit availability for the Hatley (Phase I) Mitigation Bank. Upon receiving this correspondence, please submit three credit ledgers to DWR reflecting the available credits released for each mitigation type. Please feel free to call Katie Merritt at (919) 807 -6371 if you have any questions regarding this correspondence. Sincerely, �j Karen Higgins, Supervisor �! Wetlands, Buffers, Stormwater — ��� Compliance and Permitting Unit KAH/km Attachments: Credit Ledger Template cc:File Copy (Katie Merritt) Aaron Speaks - Environmental Banc & Exchange, LLC (via electronic mail) vi C co cL cl) co bA _0 E C: E :3 0 c v u E 3: C: 0 E 0 (o a Z a. U m 0 co m '0 0) u 0 I-- 0 (D cr o Q 0 0 .w '0 tw c 2 z 0 E 2 -0 0 V) _0 w co Q) -0 w c 2 0 Q) :3 - N ca Q) 0 -@ - 0 c cc 0 0 w _0 :tf c 2 '0 :5 - 0 u 0 CL 0 (Y u