Loading...
HomeMy WebLinkAboutNCC202248_NOT Closeout Documents_20210916North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Catawba Project: Maiden Creek Solar Project -Solar Array River basin: Catawba Person financially responsible: Mortenson - Tom Schmall, Vice President, Project #: CATAW-2020-015 Operations Address: 700 Meadow Lane North, Minneapolis, MN 55422 1. Project Location: Water Plant Road, Maiden Pictures: No 2. Weather and soil conditions: Sunny, workable soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Katlyn Beebout Title: Motenson Inspection report: Sent Report Date given/sent: September 20, 2021 9. Corrective action needed: 10. Comments: Overall, the site has sufficient permanent ground cover to restrain erosion, however there are some bare areas and rills that need to be repaired and stabilized. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. All project that have been approved prior to April 01, 2019, under the old permit system, are not required to take any additional actions. The stormwater permit is terminated at the same time as the termination of this erosion control permit. Reported by: Jesse McDonnell Date of inspection: September 14, 2021 cc: Yes Others present: Time arriving on site: 9:20 AM Time leaving site: 10:45 AM