Loading...
HomeMy WebLinkAboutNCC202248_Notice of Termination_20210916Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 9/16/2021 11:31:01 AM (NOT Submittal) Approve by Morman, Alaina 9/19/2021 1:40:48 PM (NOT Request Review- NCC202248) • The task was assigned to Morman, Alaina. The due date is: September 21, 2021 5:00 PM 9/16/2021 11:31 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC202248 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status PAID Nby be blank (if not yet billed). Information associated with this permit: Project Name Maiden Creek Solar Project - Solar Array Address 2853 Diddley Dadburn Road, Maiden, NC County Catawba Latitude 35.6113 Longitude -81.1608 Permittee Listed M.A. Mortenson Company Legally Responsible Tom Schmall Individual NC Reference No. NCG01-2020-2248 E&SC Plan ID CATAW-2020-015 Original NOI 26095 Tracking No. Date COC Issued 5/29/2020 Prior Rescission Cate populates only if COCwas already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for IT Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * r Mistake or Invalid Coverage r Other Additional IVbre information about the basis of this request, if needed. Explanation Supporting upload Supporting Documentation if applicable. Documentation Mist beRYforrrat Project Close-out Information: Final Close-out 9/14/2021 Inspection Approval Project Close-out CATAW-2020-015_9.14.2021.pdf 38.13KB Approval Must be FDFforrrat Documentation North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature 1�_ Awr Type Name* Katlyn Eileen Beebout Title * Associate Environmental Specialist Organization* M. A. Mortenson Construction Date * 09/16/2021 Email for katlyn.beebout@mortenson.com Confirmation * Contact Telephone* 5078293848 NOT Certification 2021.09.15 - Maiden Creek Solar Project - Solar Form Array CATAW-2020-015 NOT Certification. pdf Mist be FDF Forrrat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification En -ails (Optional) Original Permittee CCd on Wification Bmils Email tom.schmall@mortenson.com Original Site Contact CCd on Notificaiton Errails Email nick.berzins@mortenson.com 99.75KB