Loading...
HomeMy WebLinkAboutNCC201190_NOT Closeout Documents_20210915North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Craven Project: Tyler Pool House & Amenity Center Person financially responsible: DR Horton, Inc. - Jessica Meyer, Raleigh Division Project # NPDES Compliance Admin. Address: 2000 Aerial Center Parkway, Suite I I OA, Morrisville, 1. Project Location: Olivia Road, New Bern Pictures: Yes - Digital 2. Weather and soil conditions: sunny, hot, dry 3. Is site currently under notice of violation? Yes 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Neuse CRAVE-2020-024 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one. Title: Inspection report: Sent Report Date given/sent: August 24, 2021 9. Corrective actippryy 94f4i ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction 10. Comments: Activities (NCGOI) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edoes.deg.ne.2ov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: James Edwards Others present: Date of inspection: August 12, 2021 Time arriving on site: 2:00 PM Time leaving site: 2:15 PM cc: