Loading...
HomeMy WebLinkAbout20130852 Ver 1_More Info Received_201308135. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑Yes ®No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? previously authorized Nationwide Permit 29 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? none 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation Yes No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? previously reviewed maps from State archaeology office in Raleigh 8. Flood Zone Designation (Corps Requirement) ® Yes, Impact S1 (NW14) and temporary 8a. Will this project occur in a FEMA- designated 100 -year floodplain? impacts S3 and S4 (NW12) ® No, Impact S1 and W1 - NW29 8b. If yes, explain how project meets FEMA requirements: The only impact areas within the 100 year flooplam are associated with the residential collector road (S I) as requested under NW 14 and proposed sewer and water utility line installations under NW l2. Areas of the 100 -year floodplam will be impacted by filling above the floodplain elevation to allow lots to be developed above the floodplain; however, there are no wetland fills within the 100 year floodplain. The plan assumes that FEMA approval of a CLOMR- F will be obtained prior to fill being placed in the floodplain. If CLOMR -F is approved with a no -rise condition then a floodplain cut balance will not be required. If a floodplain cut - balance is required, it will be completed without impacts to wetlands. 8c. What source(s) did you use to make the floodplain determination? project engineer / GIS Tamp Bandy At2'ea 8 -9 -13 Agent / Consultant's Printed Name Date A App icant/Agent' i ( gent's signature is valid only if an au riz nature IM Is provided.) Q to; M ff WRE V AUG 1 3 2013 Di-R-- WA AUTY %Wdil 1111ioncn