HomeMy WebLinkAbout20190157 Ver 1_Notice of Initial Credit Release_20210728Strickland, Bev
From: Browning, Kimberly D CIV USARMY CESAW (USA)
<Kimberly.D.Browning@usace.army.mil>
Sent: Wednesday, July 28, 2021 2:25 PM
To: Haywood, Casey M CIV (USA); Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B;
Bowers, Todd; kathryn_matthews@fws.gov; Wilson, Travis W.; Munzer, Olivia; Merritt,
Katie
Cc: Dow, Jeremiah J; Crocker, Lindsay; Jason Lorch; Stanfill, Jim; Harmon, Beth; Gibby, Jean
B CIV USARMY CESAW (USA); Crumbley, Tyler A CIV USARMY CESAW (USA);
Matthews, Monte K CIV USARMY CESAW (USA)
Subject: [External] Notice of Initial Credit Release / NCDMS Perry Hill Mitigation Site/
SAW-2019-00125 / Orange Co.
Attachments: Perry Hill_100093_NS 01_STR_Initial Release KB.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as
an attachment to Report Spam.<mailto:report.spam@nc.gov>
Good afternoon all,
The 15-Day As-Built/Record Drawing review for the Perry Hill Mitigation Site (SAW-2019-00125) ended July 17,
2021. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review
process. All comments received from the NCIRT are incorporated within this email. There were no objections
to issuing the initial 30% credit release. Please find attached the current signed ledger. The IRT would like to
plan on a site visit in 2022.
DWR Comments, Erin Davis:
1. The redline drawings did not show any changes in the species/quantities installed from the mit plan
approved plant list and seed mixes. Please confirm.
2. In the mitigation plan review comments, the IRT expressed concern about UT1 Reach 1 flow. Based on
channel vegetation and dryness shown in the March/April photos and drone footage, DWR is still concerned
about flow for this reach at this time.
3. Besides lunker log, were any other stabilization treatment options considered before riprapping the slope
above UT1?
4. While photo points 7 and 8 are located in the vicinity of the Reach 4 crossing, the distance and angle
makes it difficult to get a clear view of the double culverts. Please add a photo point at the downstream
culvert crossing in future monitoring reports.
5. DWR appreciated the drone video provided. It was very helpful for this review. All of the wood added to
the channels looked great.
6. Drone video 15:52 - How are the logs laying above the brush anchored to the bank?
7. Drone video 25:14 - It appeared multiple log sills were notched, is this a common practice during initial
construction? Do notches typically extend across the majority of the exposed log?
1
USACE Comments, Casey Haywood:
1. I appreciate the consideration that was given to planting zones and having the wetland indicators listed for
planted species. The drone video was also helpful.
2. There are concerns about flow on UT1 R1. Stream photos and drone video indicated that the channel was
dry and it had grass growing throughout the entire channel.
Please reach out if you have any questions.
Thanks
Kim
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
Project Information -
Name: Perry Hill
USACE ID: SAW-2019-00125
DWR ID: 2019-0157
DMS Project #: 100093
RFP: 16-007576-Issued 5/17/2018
Institution: 12/13/2018-Full Delivery
River Basin: Neuse 03020201
County: Orange
Mitigation Plan Assets: 4,042.400 SMUs (Warm) / 878,894.828 BMUs
As -built: 4,042.400 SMUs (Warm) / 874,590.412 BMUs
Design creditable stream length is 5,401 If and as -built creditable stream length is 5,399 If. No change in
project stream credits is requested.
2
Mitigation Project Name Perry Hill Site USACE Action ID 2019-00125
DMS ID 100093 DWR Permit 2019-0157
River Basin Neuse Date Project Instituted 12/13/2018
Cataloging Unit 03020201 Date Prepared 6/22/2021
County Orange Stream/Wet. Service Area Neuse 03020201
Kimberly Danielle Browning n Digitally signed by Kimberly Danielle Browning
Date: 2021.07.28 14:17:18 -04'00'
Signature of Official Approving Credit Release
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and
posted to the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Warm Stream Credits
Project Credits
Scheduled
Releases 0/0
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
2018
N/A
2 - Year 0 / As -Built
30.00%
1,212.720
1,212.720
0.000
1,212.720
2021
6/22/2021
3 - Year 1 Monitoring
10.00%
404.240
2022
4 - Year 2 Monitoring
10.00%
404.240
2023
5 - Year 3 Monitoring
10.00%
404.240
2024
6 - Year 4 Monitoring
5.00%
202.120
2025
7 - Year 5 Monitoring
10.00%
404.240
2026
8 - Year 6 Monitoring
5.00%
202.120
2027
9 - Year 7 Monitoring
10.00%
404.240
2028
Stream Bankfull Standard
10.00%
404.240
2025
Totals
1,212.720
Total Gross Credits
4,042.400
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1,212.720
Total Percentage Released
30.00%
Remaining Unreleased Credits
2,829.680
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Warm Stream
Restoration
3,526.000
Warm Stream
Enhancement I
947.000
Warm Stream
Enhancement II
928.000
Page 1 of 2
Mitigation Project Name
DMS ID
River Basin
Cataloging Unit
County
Perry Hill Site
100093
Neuse
03020201
Orange
USACE Action ID
DWR Permit
Date Project Instituted
Date Prepared
Stream/Wet. Service Area
2019-00125
2019-0157
12/13/2018
6/22/2021
Neuse 03020201
Debits
Warm Stream
Restoration
Credits
Beginning Balance (mitigation credits)
4,042.400
Released Credits
1,212.720
Unrealized Credits
0.000
Converted Credits
0.000
Owning Program
Req. Id
TIP #
Project Name
USACE Permit #
DWR Permit
#
DCM Permit
#
Remaining Balance (Released credits)
1,212.720
Remaining Balance (Unreleased credits)
2,829.680
Total Remaining Balance (Released and Unreleased credits)
4,042.400
Page 2 of 2