Loading...
HomeMy WebLinkAbout20190157 Ver 1_Notice of As-Built Review_20210702Strickland, Bev From: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil> Sent: Friday, July 2, 2021 7:57 AM To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B; Bowers, Todd; kathryn_matthews@fws.gov; Twyla Cheatwood - NOAA Federal (twyla.cheatwood@noaa.gov); Wilson, Travis W.; Munzer, Olivia; Haywood, Casey M CIV (USA) Cc: Dow, Jeremiah J; Crocker, Lindsay; Jason Lorch; Baumgartner, Tim; Stanfill, Jim; Harmon, Beth; Gibby, Jean B CIV USARMY CESAW (USA); Norton, April R CIV USARMY CESAW (USA); Crumbley, Tyler A CIV USARMY CETAM (USA) Subject: [External] Notice of NCDMS As -Built Review /Perry Hill / SAW-2019-00125 / Orange Co. Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning IRT, The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: July 02, 2021 15-Day Comment Deadline: July 17, 2021 45-Day Credit Release Approval Deadline: August 16, 2021 Project information and location of the FINAL As -Built Baseline Monitoring Report (MY0): Project Information — Name: Perry Hill USACE ID: SAW-2019-00125 DWR ID: 2019-0157 DMS Project #: 100093 RFP: 16-007576—Issued 5/17/2018 Institution: 12/13/2018—Full Delivery River Basin: Neuse 03020201 County: Orange Mitigation Plan Assets: 4,042.400 SMUs (Warm) / 878,894.828 BMUs 1 As -built: 4,042.400 SMUs (Warm) / 874,590.412 BMUs Design creditable stream length is 5,401 If and as -built creditable stream length is 5,399 If. No change in project stream credits is requested. Provider: Wildlands Engineering, Inc., Jason Lorch, 919-851-9986 DMS PM: Jeremiah Dow, 919-218-0226 Please note: Stream construction was completed March 2021 and planting was completed April 2021. 2021 will be Monitoring Year 1 for this project. Deviations from the construction plan are shown in Section 5 of the report. The final baseline (as -built) report and record drawings were uploaded to the DMS/IRT SharePoint and DWR Laserfiche for IRT review: https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx A drone video of the site is available here: https://www.youtube.com/watch?v=meKnt6HANEU RIBITS: https://ribits.ops.usace.army.mil/ords/f?p=107:278:22815775375559::NO:RP,278:P278 BANK ID:5333 Please reach out to the mitigation team if you have questions. Thank you, Casey Casey Haywood Mitigation Specialist, Regulatory Division 1 U.S. Army Corps of Engineers BUILDING STRONG ® 2