Loading...
HomeMy WebLinkAbout20190157 Ver 1_As-Built Review_20210622Strickland, Bev From: Crocker, Lindsay Sent: Tuesday, June 22, 2021 5:12 PM To: Tugwell, Todd J CIV USARMY CESAW (US); Haywood, Casey M CIV (USA); Kim Browning; Wilson, Travis W.; Davis, Erin B Cc: Dow, Jeremiah J; Baumgartner, Tim; Stanfill, Jim; Harmon, Beth; Jason Lorch Subject: Notice of NCDMS As -Built Review / Perry Hill / SAW-2019-00125 / Orange Co. Attachments: Perry Hill_100093_NS 01_STR_Initial Release.pdf Follow Up Flag: Follow up Flag Status: Flagged All, The final baseline (as -built) report and record drawings were uploaded to the DMS/IRT SharePoint and DWR Laserfiche for IRT review: https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx Project Information — Name: Perry Hill USACE ID: SAW-2019-00125 DWR ID: 20190157 DMS Project #: 100093 RFP: 16-007576—Issued 5/17/2018 Institution: 12/13/2018—Full Delivery River Basin: Neuse 03020201 County: Orange Mitigation Plan Assets: 4,042.400 SMUs (Warm) / 878,894.828 BMUs As -built: 4,042.400 SMUs (Warm) / 874,590.412 BMUs Design creditable stream length is 5,401 If and as -built creditable stream length is 5,399 If. No change in project stream credits is requested. Provider: Wildlands Engineering, Inc., Jason Lorch, 919-851-9986 DMS PM: Jeremiah Dow, 919-218-0226 Please note: Stream construction was completed March 2021 and planting was completed April 2021. 2021 will be Monitoring Year 1 for this project. Deviations from the construction plan are shown in Section 5 of the report. A drone video of the site is available here: https://www.youtube.com/watch?v=meKnt6HANEU The credit ledger for the 30% release was posted and is attached. Lindsay Crocker NC DEQ Division of Mitigation Services 1 217 West Jones St., Raleigh, NC 27603 919.594.3910 lindsay.crocker@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. 2 Mitigation Project Name Perry Hill Site USACE Action ID 2019-00125 DMS ID 100093 DWR Permit 2019-0157 River Basin Neuse Date Project Instituted 12/13/2018 Cataloging Unit 03020201 Date Prepared 6/22/2021 County Orange Stream/Wet. Service Area Neuse 03020201 Signature of Official Approving Credit Release 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases 0/0 Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A 2018 N/A 2 - Year 0 / As -Built 30.00% 1,212.720 1,212.720 0.000 1,212.720 2021 6/22/2021 3 - Year 1 Monitoring 10.00% 404.240 2022 4 - Year 2 Monitoring 10.00% 404.240 2023 5 - Year 3 Monitoring 10.00% 404.240 2024 6 - Year 4 Monitoring 5.00% 202.120 2025 7 - Year 5 Monitoring 10.00% 404.240 2026 8 - Year 6 Monitoring 5.00% 202.120 2027 9 - Year 7 Monitoring 10.00% 404.240 2028 Stream Bankfull Standard 10.00% 404.240 2025 Totals 1,212.720 Total Gross Credits 4,042.400 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,212.720 Total Percentage Released 30.00% Remaining Unreleased Credits 2,829.680 Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 3,526.000 Warm Stream Enhancement I 947.000 Warm Stream Enhancement II 928.000 Page 1 of 2 Mitigation Project Name DMS ID River Basin Cataloging Unit County Perry Hill Site 100093 Neuse 03020201 Orange USACE Action ID DWR Permit Date Project Instituted Date Prepared Stream/Wet. Service Area 2019-00125 2019-0157 12/13/2018 6/22/2021 Neuse 03020201 Debits Warm Stream Restoration Credits Beginning Balance (mitigation credits) 4,042.400 Released Credits 1,212.720 Unrealized Credits 0.000 Converted Credits 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 1,212.720 Remaining Balance (Unreleased credits) 2,829.680 Total Remaining Balance (Released and Unreleased credits) 4,042.400 Page 2 of 2