HomeMy WebLinkAbout20190157 Ver 1_As-Built Review_20210622Strickland, Bev
From: Crocker, Lindsay
Sent: Tuesday, June 22, 2021 5:12 PM
To: Tugwell, Todd J CIV USARMY CESAW (US); Haywood, Casey M CIV (USA); Kim
Browning; Wilson, Travis W.; Davis, Erin B
Cc: Dow, Jeremiah J; Baumgartner, Tim; Stanfill, Jim; Harmon, Beth; Jason Lorch
Subject: Notice of NCDMS As -Built Review / Perry Hill / SAW-2019-00125 / Orange Co.
Attachments: Perry Hill_100093_NS 01_STR_Initial Release.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
All,
The final baseline (as -built) report and record drawings were uploaded to the DMS/IRT SharePoint and DWR Laserfiche
for IRT review:
https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx
Project Information —
Name: Perry Hill
USACE ID: SAW-2019-00125
DWR ID: 20190157
DMS Project #: 100093
RFP: 16-007576—Issued 5/17/2018
Institution: 12/13/2018—Full Delivery
River Basin: Neuse 03020201
County: Orange
Mitigation Plan Assets: 4,042.400 SMUs (Warm) / 878,894.828 BMUs
As -built: 4,042.400 SMUs (Warm) / 874,590.412 BMUs
Design creditable stream length is 5,401 If and as -built creditable stream length is 5,399 If. No change in project stream
credits is requested.
Provider: Wildlands Engineering, Inc., Jason Lorch, 919-851-9986
DMS PM: Jeremiah Dow, 919-218-0226
Please note:
Stream construction was completed March 2021 and planting was completed April 2021. 2021 will be Monitoring Year 1
for this project. Deviations from the construction plan are shown in Section 5 of the report.
A drone video of the site is available here: https://www.youtube.com/watch?v=meKnt6HANEU
The credit ledger for the 30% release was posted and is attached.
Lindsay Crocker
NC DEQ Division of Mitigation Services
1
217 West Jones St., Raleigh, NC 27603
919.594.3910
lindsay.crocker@ncdenr.gov
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third
parties unless the content is exempt by statute or other regulation.
2
Mitigation Project Name Perry Hill Site USACE Action ID 2019-00125
DMS ID 100093 DWR Permit 2019-0157
River Basin Neuse Date Project Instituted 12/13/2018
Cataloging Unit 03020201 Date Prepared 6/22/2021
County Orange Stream/Wet. Service Area Neuse 03020201
Signature of Official Approving Credit Release
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and
posted to the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Warm Stream Credits
Project Credits
Scheduled
Releases 0/0
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
2018
N/A
2 - Year 0 / As -Built
30.00%
1,212.720
1,212.720
0.000
1,212.720
2021
6/22/2021
3 - Year 1 Monitoring
10.00%
404.240
2022
4 - Year 2 Monitoring
10.00%
404.240
2023
5 - Year 3 Monitoring
10.00%
404.240
2024
6 - Year 4 Monitoring
5.00%
202.120
2025
7 - Year 5 Monitoring
10.00%
404.240
2026
8 - Year 6 Monitoring
5.00%
202.120
2027
9 - Year 7 Monitoring
10.00%
404.240
2028
Stream Bankfull Standard
10.00%
404.240
2025
Totals
1,212.720
Total Gross Credits
4,042.400
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1,212.720
Total Percentage Released
30.00%
Remaining Unreleased Credits
2,829.680
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Warm Stream
Restoration
3,526.000
Warm Stream
Enhancement I
947.000
Warm Stream
Enhancement II
928.000
Page 1 of 2
Mitigation Project Name
DMS ID
River Basin
Cataloging Unit
County
Perry Hill Site
100093
Neuse
03020201
Orange
USACE Action ID
DWR Permit
Date Project Instituted
Date Prepared
Stream/Wet. Service Area
2019-00125
2019-0157
12/13/2018
6/22/2021
Neuse 03020201
Debits
Warm Stream
Restoration
Credits
Beginning Balance (mitigation credits)
4,042.400
Released Credits
1,212.720
Unrealized Credits
0.000
Converted Credits
0.000
Owning Program
Req. Id
TIP #
Project Name
USACE Permit #
DWR Permit
#
DCM Permit
#
Remaining Balance (Released credits)
1,212.720
Remaining Balance (Unreleased credits)
2,829.680
Total Remaining Balance (Released and Unreleased credits)
4,042.400