HomeMy WebLinkAbout20191132 Ver 1_As-Built Review_20210810Strickland, Bev
From: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>
Sent: Tuesday, August 10, 2021 11:19 AM
To: Davis, Erin B; Kim Browning; Haywood, Casey M CIV (USA); Tugwell, Todd J CIV
USARMY CESAW (US); Leslie, Andrea J; Wilson, Travis W.; Bowers, Todd; Youngman,
Holland J
Cc: Jones, M Scott (Scott) CIV USARMY CESAW (USA)
Subject: [External] As -Built review for the Wildlands Little Tennessee Umbrella Mitigation Bank
- East Buffalo Site (SAW-2019-01296)
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good morning IRT,
The As-Buit Report review and credit release has been requested by Wildlands Engineering, Inc (WEI). The package has
been uploaded to RIBITS and the bank information is below. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this
review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email
notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing
comments please indicate if your concerns are great enough that you intend to request a site visit prior to the As -Built
credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the
conclusion of this comment period, a copy of all comments will be provided to WEI and the NCIRT along with District
Engineer's intent to approve or disapprove this As -Built credit release.
Site Summary:
Sponsor: Wildlands Engineering, Inc
Name: Wildlands Little Tennessee UMB - East Buffalo Mit Site
USACE ID: SAW-2019-01296
River Basin: Little Tennessee River Basin
HUC: 06010204
County: Graham
CREDIT RELEASE:
15% of the total stream restoration and enhancement credits and 3% of preservation credits: 509 cold stream
mitigation units
15% of the total wetland re-establishment, rehabilitation, and enhancement credits: 0.26 wetland mitigation units
15-Day Comment Start Date: August 10, 2021
15-Day Comment Deadline: August 24, 2021
*NOTE: If a site visit is request by the IRT, comments are due 15 days after the site visit is complete.
You can find the As -Built Report on RIBITs at the link below.
https://ribits.ops.usace.army.mil/ords/f?p=107:278:4652869204007::NO:RP,278:P278 BANK ID:5162
1
Regards,
Steve Kichefski
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District, Asheville Field Office
151 Patton Avenue, Suite 208
Asheville, NC 28801
(828)-271-7980 Ext. 4234
(828)-933-8032 cell
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at our website at
https://regulatory.ops.usace.army.mil/customer-service-survey/ to complete the survey online.
2