Loading...
HomeMy WebLinkAbout20180666 Ver 1_Notice of Initial Credit Release_20210728Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Wednesday, July 28, 2021 2:05 PM To: Haywood, Casey M CIV (USA); Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B; Bowers, Todd; Youngman, Holland J; Merritt, Katie; Wilson, Travis W.; Munzer, Olivia Cc: Bradley Breslow; Ryan Medric; Allen, Melanie; Stanfill, Jim; Harmon, Beth; Wiesner, Paul; Jones, M Scott (Scott) CIV USARMY CESAW (USA); Crumbley, Tyler A CIV USARMY CESAW (USA); Matthews, Monte K CIV USARMY CESAW (USA) Subject: [External] Notice of Initial Credit Release /Groundhog Hollow / SAW-2018-00450 / Alexander Co. Attachments: Groundhog Hollow_100049_CT 01_STR_Initial Release KB.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon all, The 15-Day As-Built/Record Drawing review for the Groundhog Hollow Mitigation Site (SAW-2018-00450) ended July 16, 2020. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. All comments received from the NCIRT are incorporated within this email. There were no objections to issuing the initial 30% credit release. Please find attached the current signed ledger. A site visit is not requested at this time. DWR Comments, Erin Davis: 1. Regarding the May 2021 repairs, please callout the repair locations on the MY1 report CCPV. 2. If additional planting becomes an action item during the monitoring period, DWR requests that at least one or two additional species be used to promote more diversity. Two of the fixed veg plots are starting out with only three species present. 3. Please confirm there were no changes to the approved seed mixes. 4. Several of the pool cross section photos appear to show significant fine sediment present. Since January, have you observed this material flushing through the project reaches? Do you expect the MY1 cross section data to deviate substantially from MVO? 5. The Flow Gauge GF4-A photo shows a rock sill structure upstream. What is the drop depth from this structure? Were there any concerns with how it was installed? USACE Comments, Casey Haywood: 1. Appreciate veg plot 8 and random veg plot 2 being established in existing wetlands. Recommend including wetland indicator status for planted stems in Table 7 in future reports. 2. Table 9. Veg plots 1, 2, 3, 6, & R1 are all meeting success, however the plots are dominated by a single species and account for more than half of the planted stems. Okay with the addition of sugarberry to the planting plan species list, but would encourage the addition of one or two species if a supplemental planting is needed in the future. Please reach out if you have any questions. Thanks Kim 1 Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers Project Information: Groundhog Hollow Site (DMS#100049) USACE ID: 2018-00450 DWR#: 2018-0666 RFP: 16-007277— Issued 06/21/2017 Institution Date: 2/7/2018— Full Delivery Catawba River Basin Cataloging Unit 03050101 Alexander County, North Carolina Proposed Mitigation Plan Assets: 4,093.950 SMUs (warm) As -Built MVO Project Credits: 4,093.950 SMUs (warm) Mitigation Plan Lengths/ Acreages: 6,129 LF As-Built-MY0 Lengths/ Acreages: 6,134 LF Mitigation Project Name Groundhog Hollow USACE Action ID 2018-00465 DMS ID 100049 DWR Permit 2018-0666 River Basin Catawba Date Project Instituted 2/7/2018 Cataloging Unit 03050101 Date Prepared 6/11/2021 County Alexander Stream/Wet. Service Area Catawba 03050101 KimberlyDanielle BrowningDigitally signed by Kimberly Danielle Browning Date: 2021.07.28 13:55:23 -04'00' Signature of Official Approving Credit Release 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases0/O Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1,228.185 1,228.185 0.000 1,228.185 2021 6/11/2021 3 - Year 1 Monitoring 10.00% 409.395 2022 4 - Year 2 Monitoring 10.00% 409.395 2023 5 - Year 3 Monitoring 10.00% 409.395 2024 6 - Year 4 Monitoring 5.00% 204.698 2025 7 - Year 5 Monitoring 10.00% 409.395 2026 8 - Year 6 Monitoring 5.00% 204.698 2027 9 - Year 7 Monitoring 10.00% 409.395 2028 Stream Bankfull Standard 10.00% 409.394 2025 Totals 1,228.185 Total Gross Credits 4,093.950 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,228.185 Total Percentage Released 30.00% Remaining Unreleased Credits 2,865.765 Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 2,851.000 Page 1 of 2 Mitigation Project Name Groundhog Hollow DMS ID 100049 River Basin Catawba Cataloging Unit 03050101 County Alexander USACE Action ID 2018-00465 DWR Permit 2018-0666 Date Project Instituted 2/7/2018 Date Prepared 6/11/2021 Stream/Wet. Service Area Catawba 03050101 Warm Stream Enhancement I 306.000 Warm Stream Enhancement II 2,972.000 Debits Warm Stream Restoration Credits Beginning Balance (mitigation credits) 4,093.950 Released Credits 1,228.185 Unrealized Credits 0.000 Converted Credits 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 1,228.185 Remaining Balance (Unreleased credits) 2,865.765 Total Remaining Balance (Released and Unreleased credits) 4,093.950 Page 2 of 2