HomeMy WebLinkAbout20180666 Ver 1_Notice of Initial Credit Release_20210728Strickland, Bev
From: Browning, Kimberly D CIV USARMY CESAW (USA)
<Kimberly.D.Browning@usace.army.mil>
Sent: Wednesday, July 28, 2021 2:05 PM
To: Haywood, Casey M CIV (USA); Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B;
Bowers, Todd; Youngman, Holland J; Merritt, Katie; Wilson, Travis W.; Munzer, Olivia
Cc: Bradley Breslow; Ryan Medric; Allen, Melanie; Stanfill, Jim; Harmon, Beth; Wiesner,
Paul; Jones, M Scott (Scott) CIV USARMY CESAW (USA); Crumbley, Tyler A CIV
USARMY CESAW (USA); Matthews, Monte K CIV USARMY CESAW (USA)
Subject: [External] Notice of Initial Credit Release /Groundhog Hollow / SAW-2018-00450 /
Alexander Co.
Attachments: Groundhog Hollow_100049_CT 01_STR_Initial Release KB.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good afternoon all,
The 15-Day As-Built/Record Drawing review for the Groundhog Hollow Mitigation Site (SAW-2018-00450) ended July 16,
2020. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. All
comments received from the NCIRT are incorporated within this email. There were no objections to issuing the initial
30% credit release. Please find attached the current signed ledger. A site visit is not requested at this time.
DWR Comments, Erin Davis:
1. Regarding the May 2021 repairs, please callout the repair locations on the MY1 report CCPV.
2. If additional planting becomes an action item during the monitoring period, DWR requests that at least one or
two additional species be used to promote more diversity. Two of the fixed veg plots are starting out with only three
species present.
3. Please confirm there were no changes to the approved seed mixes.
4. Several of the pool cross section photos appear to show significant fine sediment present. Since January, have
you observed this material flushing through the project reaches? Do you expect the MY1 cross section data to deviate
substantially from MVO?
5. The Flow Gauge GF4-A photo shows a rock sill structure upstream. What is the drop depth from this structure?
Were there any concerns with how it was installed?
USACE Comments, Casey Haywood:
1. Appreciate veg plot 8 and random veg plot 2 being established in existing wetlands. Recommend including
wetland indicator status for planted stems in Table 7 in future reports.
2. Table 9. Veg plots 1, 2, 3, 6, & R1 are all meeting success, however the plots are dominated by a single species
and account for more than half of the planted stems. Okay with the addition of sugarberry to the planting plan species
list, but would encourage the addition of one or two species if a supplemental planting is needed in the future.
Please reach out if you have any questions.
Thanks
Kim
1
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
Project Information:
Groundhog Hollow Site (DMS#100049)
USACE ID: 2018-00450
DWR#: 2018-0666
RFP: 16-007277— Issued 06/21/2017
Institution Date: 2/7/2018— Full Delivery
Catawba River Basin
Cataloging Unit 03050101
Alexander County, North Carolina
Proposed Mitigation Plan Assets:
4,093.950 SMUs (warm)
As -Built MVO Project Credits:
4,093.950 SMUs (warm)
Mitigation Plan Lengths/ Acreages:
6,129 LF
As-Built-MY0 Lengths/ Acreages:
6,134 LF
Mitigation Project Name Groundhog Hollow USACE Action ID 2018-00465
DMS ID 100049 DWR Permit 2018-0666
River Basin Catawba Date Project Instituted 2/7/2018
Cataloging Unit 03050101 Date Prepared 6/11/2021
County Alexander Stream/Wet. Service Area Catawba 03050101
KimberlyDanielle BrowningDigitally signed by Kimberly Danielle Browning
Date: 2021.07.28 13:55:23 -04'00'
Signature of Official Approving Credit Release
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the
NCIRT and posted to the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Warm Stream Credits
Project Credits
Scheduled
Releases0/O
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
1,228.185
1,228.185
0.000
1,228.185
2021
6/11/2021
3 - Year 1 Monitoring
10.00%
409.395
2022
4 - Year 2 Monitoring
10.00%
409.395
2023
5 - Year 3 Monitoring
10.00%
409.395
2024
6 - Year 4 Monitoring
5.00%
204.698
2025
7 - Year 5 Monitoring
10.00%
409.395
2026
8 - Year 6 Monitoring
5.00%
204.698
2027
9 - Year 7 Monitoring
10.00%
409.395
2028
Stream Bankfull Standard
10.00%
409.394
2025
Totals
1,228.185
Total Gross Credits
4,093.950
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1,228.185
Total Percentage Released
30.00%
Remaining Unreleased Credits
2,865.765
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Warm Stream
Restoration
2,851.000
Page 1 of 2
Mitigation Project Name Groundhog Hollow
DMS ID 100049
River Basin Catawba
Cataloging Unit 03050101
County Alexander
USACE Action ID 2018-00465
DWR Permit 2018-0666
Date Project Instituted 2/7/2018
Date Prepared 6/11/2021
Stream/Wet. Service Area Catawba 03050101
Warm Stream
Enhancement I
306.000
Warm Stream
Enhancement II
2,972.000
Debits
Warm
Stream
Restoration
Credits
Beginning Balance (mitigation credits)
4,093.950
Released Credits
1,228.185
Unrealized Credits
0.000
Converted Credits
0.000
Owning Program
Req. Id
TIP #
Project Name
USACE Permit
#
DWR
Permit #
DCM
Permit #
Remaining Balance (Released credits)
1,228.185
Remaining Balance (Unreleased credits)
2,865.765
Total Remaining Balance (Released and Unreleased credits)
4,093.950