Loading...
HomeMy WebLinkAbout20211384 Ver 1_Shoreline Stabilization_20210917Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: Pre- Submittal Meeting Request Form.pdf 3.1MB Pre -fling Meeting or Request Date 8/17/2021 ID# Version I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * randy@watersidedocks.com Rease provide an err -ail address for payment and requests for pure infornation here. Owner Information: Name: * Randy Keith Waterside Marina Email: * randy@watersidedocks.com Phone Number:* (704)902-5445 (xxx)xxx-xxxx Mailing Address:* Street Address 762 Brawley School Road Address Line 2 City State / Frovince / Region Mooresville NC Fbstal / Zip Code Country 28117-9122 US Is there an agent working on the project? * Agent/Consultant Information ................................................................................................................. Name: Company Affiliation:* Email: Phone Number:* Mailing Address:* F Yes r No Janice Estep CBC Stone & Recycling, LLC info@cbcstoneandrecychng.com (704)660-5111 (XXX)XXX-XXXX Address 638 Oakridge Farm Hwy Address Line 2 City Mooresville Fbstal / Zip Code 28115 Asigned and dated copyof the Agent Authorization letter:* Auth. Form.pdf 1.34MB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] ........................................................................................................................................................................................... Project Name:* Waterside Marina Dredge and Shoreline State / Province / Fdegion NC Country United States If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* r Upload File r Lookup address Property Address Lookup:* Latitude:* 35.695300 Street Address 7774 Hudson Chapel Road Address Line 2 City Catawba Fbstal / Zip Code 28609-8864 State / Province / Region NC Country US Longitude:*-80.994165 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Site Plan.pdf 2.69MB Buffer Form.pdf 2.01MB Buffer Mitigation Letter.pdf 1.88MB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Dredge Area Pic s.pdf 32.73MB Dredge Areas Map.pdf 1.7MB Shoreline Section Apdf 15.66MB Shoreline Section B.pdf 23.3MB Shoreline Section C.pdf 72.83MB 4. Location of the property (where work is to be conducted) Nearest Town:* Catawba County:* Catawba Lake/ river/ ocean adjacent to Norman property: Subdivisions name or site address:* 7774 Hudson Chapel Rd. Catawba, NC 28609 Tract B Include phasellot nunber Directions to site:* 610 E Center Ave Mooresville, NC 28115 Head south on Evergreen St toward E Center Ave 197 ft Turn right onto E Center Ave 381 ft Turn right onto E Statesville Ave 1.2 mi E Statesville Ave turns slightly right and becomes NC-115 N/N Broad St Continue to follow NC-115 N Pass by McDonald's (on the right in 6.1 mi) 10.1 mi Turn left onto Old Mountain Rd 3.2 mi Turn left onto Buffalo Shoals Rd 4.1 mi Continue onto Hudson Chapel Rd Destination will be on the right 0.2 mi 7774 Hudson Chapel Rd Catawba, NC 28609 Rease include road names and nunbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Commercial Marina with existing buildings Pesidential, undeveloped, etc. 6. Property Size 2.420 acres Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Dredge 4 areas for new cluster docks to be built. Shape and slope 150' section of shoreline, install matting and boulder rip rap on adjacent property with permission from owner to left property line of marina. From left property line of marina to proposed 30' wide bulkhead, shape and slope a 20' section of shoreline, install matting and install boulder rip rap. Install a 26' x 30' concrete pad behind bulkhead. From right side of bulkhead to existing boat ramp, shape and slope a 35' section of shoreline, install matting and install boulder rip rap. Repair existing 28' wide boat ramp. From right side of boat ramp, shape and slope 319' of shoreline, install matting and boulder rip rap. In buffer area near boat ramp, extend and add height to existing block walls. In area to right of walls, install trees, shrubs and mulch to stabilize steep bank. In area past steep bank where proposed boardwalk will be located extending to right property line, remove trees along shoreline and in buffer to properly stabilize shoreline and allow for boardwalk to be built. Install mulch in buffer area above boardwalk. Buffer credits applied for 2,619 sf. 8. How will the work be done? * I7 From Land r1 From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 2,912 cubic yards on dredge, 6' below on shoreline (2,934 sf) square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward: * (including all clearing, backfill, excavation, rip rap, retaining walls, etc.) 0' above on dredge, 1' above on shoreline (489 sf) Buffer mitigation (2,619 sf of permanent impact) 10' x 50' access corridor (500 sf temp. impact) square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nunber of trees, for instance) Access project areas using existing boat ramp. Remove 9 trees in buffer area and on immediate shoreline along area where boardwalk is to be built. Permanent impact to buffer is 2,619 sf of area (includes extending existing walls, boardwalk, bulkhead, installation of concrete pad behind bulkhead) There is an existing drainpipe at area where proposed bulkhead will be installed Sketch: Dredge Appheation.pdf 29.37MB Dredge Spoils Info.pdf 17.48MB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): 0 $240.00 for impacts to lake (below normal water level) of less than 1 acre 0 $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); 0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Janice Estep Signature: Submittal Date: 9/17/2021 Initial Review Is this accepted into the review process?* Project Number:* 20211384 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Alan Johnsomeads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 Contact Name * Janice Estep Contact Email Address* info@cbcstoneandrecyciing.com Project Owner* Randy Keith Project Name * Waterside Marina Dredge and Shoreline Project County* Catawba Owner Address:* Street Address 7774 Hudson Chapel Rd. Address Line 2 at State / Province / Region Catawba NC Fbstal / Zip Code Country 28609 us Is this a transportation project?* (- Yes (' No Types) of approval sought from the DWR: i 401 Water Quality Certification - Regular l- Individual Permit W Shoreline Stabilization r 401 Water Quality Certification - Express r- Modification Does this project have an existing project ID#? Yes No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below and include location information. * Dredge 4 areas for new cluster docks to be built at commercial marina by owner. Shape and slope shoreline, install matting and install rip rap. Owner has permission to stabilize shoreline on adjacent property. In buffer zone, extend and increase height of two existing block walls near steps. Owner will be installing plantings and mulch in area behind walls. In buffer zone, remove trees along pathway adjacent to shoreline to prepare area for wooden boardwalk to be installed by owner and will be installing mulch on bank behind boardwalk. Owner will be having a bulkhead installed at shoreline and having concrete installed in area behind bulkhead in buffer zone. Existing boat ramp to be repaired. Owner has received SOA letter from mitigation bank to obtain buffer credits and will purchase credits through bank once DWR approval has been issued. By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project' s thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature 1410 r4 r- Submittal Date 8/17/2021 Parcel Marcel/lot dze ( n e L4 4) r Disposal area requlred €t and/or a r (mil 1 $l �� Adrnowledgement of Nodfffcatlon I'--�°�'- Sr • am aware that the site must adhere to all state regulations and rules regarding sedlHent and erosion control and water quality. And give permission for Marne of lndlvldual and Company to dispose.of their dredge material at the above stated location Owner: ve_Y�-1 ,� Aga—, 'T- Date- Along With form, Please provide: Aerial of parcel/lot (County G!S) Photo of proposed spoil site Identified proposed spoil site CL 0 (D 0 0 49() !-4 E7J 1r) 0 z Ro- STATE OF NORTH CAROLINA IREDELL COUNTY I cerU y that this mop was drown irnm an nctow survey mode under my 5#pe+'ti614r1 Tile unodjusjed rotlo of I1recisIM as Cdculoted is 1l: 1D,00azt; aT t Boundaries not. surveyed, IF MY, ore noted. Deed descrolions are remrda 'in o#: as Poge a. tn, awn .vwtnesg my Wd and $0,01 IWB � fb day of ,tt,3NE 2019, i SITE j z 5�15t S{1111JXIJ 5,. CAS rrr '�'t5551111dprl j (T 115 Professional Land Survey- jD4�'r 152 s i 150 _ r L s370 i NOTES: w ALL DISTANCES ARE NOR17ONTAL. GROUND DISTANCES x� SluR ,\' w f 1 UNLESS 01HERMSE NOTED 'if 4� 0 '�� w AREA 9Y COORDINATE COWLtATM. } i LO�'. PION '. ftj i� • PROPERTY SU€Xct TA ANY VALID do ENFORCEABLE r��l.Ii NOT TO SCALE 51151515>S EASMONTS; RESTRICTIONS & RIGHTS OF WAY - RECORD- LINE TABLE • SURbEY IS BASED ON PHYSICAL EVIDENCE AND EXt5T9AiG LINE BEARING.. DISTANCE MONUMENT FOUND DARING THE SUMEY. s PROPERTY CORNER PIPE SIZES AS SHOW ARE NO"AL L, I N14'58'43 E 60.30 INSIDE DIAMETER. I LZ I MPA-7',71'r ;A 11 LEGEND D nua a� Zrs I: I L6 tN75*30'T2"W IM16 LINES SURNOT (. L7 S54-19�.38" 8za2. SINES NOT S,)RCEY£O..-��••.---�----. SURVEYED TIE €1NE5 OYHD DISTRIBUTION LINE —..:.— PIN 4665-30-1353 (OVERHEAD} OAKRIDGE STORAGE, LLG •� f R/1Vlilal;5 0.8, 2521 PG. 2t133 ctL TTRAN'aMSSON, CI NO Mf3NUMENTATION POWER POLE UNLESS OTHERYASE � � CENTERLtWE NOTED / ! ' PROPERTY LINE f l" (F) DENOTES 'FOUND" I PIN e96e-20-8185 } (S) DENOTES "stir" BRIDGES PROPERTIES, LLC NTS DENO" 'NOT TO SCALP' f D.S. 1b02. [ G_ ts12. / f'+ LOT 36 PG. 150 ,s✓ OONCFR�E ASONt1kfEAiT (F) G793:— fT f {:. E 14G2J5T.44 FT � � NAO I33{ail' T) f � f f i f I "rs j PIN 4667-29-6642 BRMGT'S p ! PROPERTMS, LLC v m i D.S. 15OZ PG. 1,912 M yc PIN 4667-39-0000 ARC08 USA i LC t STAGING AREA DB. 2016: PC, 49E1(CD) rf 0.227 ACRE �—� �-4NAiI$$Ibti 41NE LINE ONLY) NAIL (F) AT SENT N 679337.77 £T 2 3ENT4 NRO 93(£itj'. /RE6AR (F) > 57t.73, GRAPHIC SCALE PIN 46,7 -as-�a4 > � PCMFORLESS HOLDINGS, LLC g 75 150. D.B. 2180 PG. 1029 LOT #Z-P,S, 26 PC..7:3 LENS FILE N(7__ S 9p5t DWG NO,: _ ST9D t SURVEYED 1yY. N.O. WNITti IN FEET) DRAM BY: N.D. WH#T'Li I inch = 150 M CHECKED BY: J_R. HDBE TAX [D: SOURCE OF 9 6642 �- IV45 TITLE FORTAX Dt: 466 -2 TITLE REFER TO iD.BK_ 1602 PG. 7912 PROPERTY OWNED BY —TL BRIDGES PROPERTIES, LL C SURVEY AND MAP PREPARED B r- SURVEY SHOWING LOCATION OF LAKE Ni}RMAN SURVEYING STAGING AMA & MAPPING PLLC —0190 CODDLE CREEK TOWNSHIP IREDELL COUNTY, N.C. IJ7 vennings Road, Suite C Stotes:ille, North Carolino 28625 SCALE: T" = 150' DATE OF SURVEY: JUNE 3, 3019 (704) 876-4450 Fox (704) 876-4451 BOOK: RA DATE OF MAPPING: JUNE 3. 2019 litillilloollilifill Doe I0: KiUB8898t19 Tvpa: CRP Recorded: til2al2004 a 0i:M00 PH Fee um#: 8ti7#,Ctr# Paget of 0 Exadelcse l TaxGcu: tstu$t384C1 Ir. MC Brenda 1l_ sell 9e01stea of Deeds w1602P491 -1914 Excise Tax $654.00 Tax Lot No, Parcel Identifier No 4667-29-6642 and 4668: 20-8185-4.34 Verified by...... .................. .. ................. County on the .;....... day of ... by..................... ___ ........ .......... Mail after recording to: Grantee This instrument prepared by. Lutzel, Gandy Broadway, PLLC Brief Description for the Index TIMDEED made this 22nd....dayof November 2004,byan between GRANTOR Ronald Ray Snyder and wife, Victoria A. Snyder, adkla Viootira A, Snyder GRANTEE Bridges Properties, LLC 678 Oak Ridge Farris Hwy Mooresville, NC 28115 Enter in appropriate block for each putty; name, address, and, if appropriate; character of entity, e.q. corporation or partitersEup. The designation Grantor and Grantee as used herein shalt include said parties, their heirs, successors, and assigns and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETR, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does, grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of .. .................. Township, Iredeil County, North Carolina and more particularly described as follows: See Exhibit "A' attached heretc and mde a part hereof T110 1170P Yheilcinabove described was acquired by Grantor by instrument recorded in Botak : _..,_...:, page ......... A map showing the above described property is recorded m Plat Book ...... .._. _ Page ................ TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Gnntor is seized of the premises in fee single, has the right to convey the same in fee simple, that title is matketable and free and clear of all encuttthm=s, and that Grantor will warrant seal defend the titre against the lawful claims of all persons whomsoever except for the ertcGpteor>s hereinafter stated Title to the property berth above described is subject to the following exceptions All ea;; u=% restrictions and tights of way of record, Ad valorem taxes for the year 2005 and subsequent Years not yet due and payable. All ratters revealed by and accurate survey of the property, IN WITNESS WHMOF, the Grantor has hereunto set his hand and seal, or if corporate, has caused this iristrutateitt to be signed in its corporate name by its duly authorized or,,,(,) by authority of its Board Of Directors, the day and year first above written. (CoporateName) . ........... .............. �•`-.`'CAI.} T3onaly Sny ........: ,- ............... President Attest Victoria A. Snyder ..... ......... .. ................ --- -_. (SEAL) �t ciJ ......... :......................... ........ ............ (SEAL) -0�' XLO�4_ COUN , 4' a '•" 't`c �'-, i, a Notary public of the County and State aforesaid, certify Snyder and Victoria A. .� 'T t 0TA�'ty` � � SNyder, Gnmtor, personally appeared before s d acfouowled ut t ged a executi n of the • • ` foregoing insh-ocut. Witness my hand and o jai s cal this 22nd. y o vember0. A04. My Cornmission tress . .... P� . ........ ... ........Netary lie COIJ 4xiirn��Nd•,. (SEAL) NORTH CARQI. NA.. ......... ............... COUNTY. I, a Notary Public of the Cmurty and state aforesaid, certify that . _...., ......... ............. :------ ' ........... ....,.... .........,..-._.,._.Grantor. personally appeared before me tins day and acknowledged that he/she is .......... of .._..... . ..... a corporation, and that he/she as.......... . :,:...... ......... ......... being authorized to do so, exe. cured the foregoing inshuwnt on behalf ol'the corporation, Witness my hand and official stamp or seat this. -..- --- •-•-day of ................ ....... 20044 My commission Expires; ...... ......... ......... ...... --Notary Public The foregoing .cer iScate(s) of ...., islets certified to be correct. This insirutttent and this certificate are duly , erred at d and time and in the Book and Page Y' A EXHIBIT"A" TRACT 1: BEING all of that cettain 6.49 acre Met located in Coddle Greek Township, Iredell County, North Carolina On NC Hwy 130 By-pass; being more particularly described as follows: BEGINNING at a point in the centerline of the 100 ft. right of way for NC Hwy 150ley-pass, said point being located North 36-17-36=East 2,458.39 ft (ground) from NCGS Monument "Run In" N. 200,469.354 meters E: 445,280.693 meters Dated- 1991 NAD 83; thence continuing from said point of Beginning and along the centerline of the right of way for NC Hwy 150, North 36- 22-I6 East 561.58 ft. to a point; thence leaving said right of way and running with the tine of Whitman property (now or formerly) South 64-0648 East 49.80 ft, to an existing #4 rebar in the eastern margin of the right of way for NC Hwy 150; thence South 444-46-d8 East 246.91 ft, to an existing 1 1/2" pipe; thence continuing with another line of Whitman property North 40-19-43 East 305.82 ft. to an existing 1" pipe; thence North 71-18-07 Post 121.51 tt, to an existing angle iron in the tine of Evelyn Brown (See Deed Book 309, Page 337, Iredell County Registry); thence a new line of John W. Caffey, et at (see teed Book 601, page 538, tredell County Registry) South 42- 31-26 West 221.12 it. to an existing concrete Monument thence another now line of Caffey, et a1 South 15-00 41 West 614,81 ft, to an existing 92 rebar, thence with the northern line of Lot 2, Scott D. Burton Property (see Plat Book 26, rage 73, tredell County Registry) North 74-59-17 West 572.00 #f, to an existing f#2 rebar in the eastern margin of the right of way For NC Hwy 150; thence North 74-59-17 West 53.64 ft. to the point and place of Beginning. TRACT 11: BEING all and the full contents of Lot No; I as shown On plat ofMinor Subdivision for William Wallace Whitman Estate and recorded in Plat Book 36, Page 150,. iredell County Registry, to which plat reference is made for a more first and complete description of said lot by metes and hounds. Duke Ener-ay Excavation Permit Application Form FOR DUKE ENERGY USE ONLY Duke File No. Application Fee $ Security Deposit $ Check # Date Recv'd Initials Date of Duke Energy Lake Services, applicant and/or contractor on -site inspections Date A ; t Initials__Z� Date Final Protection/Avoidance Area Markings Field - Verified Initials Approved to Start Work By * : Date (Print) (Sign) Date Completion Required Date of Any Approved Extension Initials Date Passed Closeout Inspection* Initials Any Stop Work Orders or SMG Violations*? (check one) ❑Yes ❑No (If Yes, explain in PART V) Date Deposit Refunded Initials Date Permit Database Updated Initials * Forward copy of approved application (all pages, plus any attachments that Duke Energy changed) back to applicant with Approval Letter and highlight any changes. File copies of Approval and Close-out Checklists and any Stop Work Orders with application. Part I. Applicant Information (Please Print) Name WC*Q-r 1 P�rTelephone 7o W' q 0a 514,45 Email address: r.C„yvA!4 WpAers16 f' CAAl cic m Contractor Company Mailing Address (if different) -1 lnA \ r I, 1\40 ( S-,r)nl �Y1dor-��v ►tl� , roc �.�� i-� .i` Contractor Contact Person � ;GP Telephone ' l0u _ 141�U ` 5 I Contractor Email Address: LAKE LOT INFORMATION Lake N ; i r► County �1�6xuzloa . City L-�n-w6--L_ State KC, Tax Map No. Subdivision Lot / Section No. Lot SizeAcres 4�ID*�' �I�totd�{ 7y`10`t�3 Duke Energy Page 4 of 13 rev 10/1/2019 Excavation Program Duke Eneru Excavation Permit Application Form Are there any Co -Applicants*? (check one) ❑Yes M o (If Yes, include names, street addresses or lot numbers, pier numbers, phone numbers, and email addresses in Part V — Additional Information) * Co -Applicants exist when the proposed work is being done under a single application, will be performed by a single contractor as one continuous project, and is done to benefit multiple owners / lease holders of Project -front properties within a single development. There can be no more than 4 co -applicants in addition to the lead applicant on any application. Do not continue the application until an on -site inspection has been conducted between a Duke Energy Lake Representative and the applicant and/or the excavation contractor. NOTE: Initialling this portion of the application by a Lake Representative in no way constitutes approval or eminent approval of the excavation or any other lake use permitting activity. Date of on -site inspection 3 2 f Initials (Duke Energy) (applicant/contractor) a C-.. 0 "1 Duke Energy Page 5 of 13 rev 10/1/2019 Excavation Program Duke Eneray Excavation Permit Application Form Part II. Description of Project A. Basic Information 1. Type of excavation: (check one) ❑ New excavation Maintenance excavation ►0 Purpose of excavation: (check one) ❑ Water Intake Channel ❑ Other (specify): OeBoat Access Channel ❑ Wastewater Discharge Channel 3. Lake use�r category: (check one) ❑Private ❑Residential Marina ffCommercial Marina ❑Public ❑Other (spec): 4. Max. Excavation Area Dimensions (ft): Length Width Depth (Note: include additional area dimensions if necessary so response to #5 below equals max. area dimensions in #4) A 'a U6 Ct1 �i -' yq0 Cl� L'„ • 1, ey -) - I,00q CCl 5. Volume of Excavated Material (TOTAL for the project): �9l a Cubic yards 6. Type of material removed (applicant determines by field sample ifpractical): r+ 1 5*11+ 7. Excavation Site area: l .805 Acre (s) Disposal Site area: a.aG Acre(s) 8. Total Disturbed Area (including equipment staging area): I & k l o Acre (s) 9. Does th�oject meet the requirements of the applicable General Permit? (check one) ides qo 10. Do you claim title to the disposal area? (check one) ❑Yes OTO) 11. Do you claim title to the equipment staging area? (check one) Ves Ito (see oakaehed deed) 12. Are there any water -treatment facilities within 50 feet of the proposed excavation area? (check one) Yes Jo (If Yes, sped): 13. How will the excavated material be entrapped and the erosion controlled? (e.g. see attached erosion control plan and disposal area design): -D redc�e bU )bary, , %ric-o OFF 1-D� kand avlcl iVNe - o d t 5P ()60J s +E koea-�OA- C)C,L,�r`td9e VL k�l� . 11 Lo v`i1�2, IBC a�115 t M0.4er't CLI (s3& Duke Energy Page 6 of 13 rev 10/1/2019 Excavation Program Duke Energy Excavation Permit Application Form 14. Type(s) of excavation equipment to be used: Long reach E' XCQ vcL+o e- 15. Will waters or wetlands be crossed in transporting equipment to or from the site? (check one) 5T�'es ❑No (If yes, explain) 'R>� -;� V, 16. Will return water re-enter the reservoir? (Check one) ❑Yes f1To ❑N/A (If Yes, sped points) of re-entry and show on Excavation Area Drawing) 17. Is there an existing facility (e.g. pier) that access is being maintained to by conducting the excavation? RVes ❑No (If Yes, provide the existing permit number. If No, include a scaled drawing of the proposed facility). Permit 4 (`ornrnerCICA 111OW,nQL , cluster doc.KS VA - E. , perrn,i-a cfelled cor 18. Total planned duration of the work (Include first equipment mobilization, excavation through final mitigation measures complete): START 16 / a.t FINISH 16 / (Month) (Year) (Month) (Year) Duke Energy Page 7 of 13 rev ioiirzois Excavation Program CD cD 00 O "'+) W CD :"� � G ti � rs" � coo• C ccu � CD CDCD (� O CD CD cr n CD� y d � �� PT,CD 6A IA O Cf 35 CD 4� "^ts O �' 7y ra >AF m ¢ d C O G O i► tD C� a C CD O va 0 n r_+ 55.. CL G O' Uq r+ C�. C C]. El W O N O 'rJ D d CD CD O e�t CD Pr e't 0 in- Q CD 0 O P"r e'•F � Fr! BCD CD 0 CD �CD UQ CL C u o �- o � A A� W d � UQ d � CD C o Q- � o a: Z � CD F.r b CD CD `� y ci £? k �' CD � y cra � �• C<4 0CD W `D A CAD (� Q Fri a� e� 0 K �a � dx� 0 Ci g. �F K �y su m Duke Encry(Excavation, Permit 1 11 Ilication Form C. Applicant's Signatures Comments: NI C k 3 h6r5: LO, � C t q(I e- R6. (26_A-cLw6cL) tle- a S (_Q 09 l�ober� Cher X A0,SS I'll 85 IA u*d:5on &O-Ped Rd. C cl;�awloo_) RC ABU09 Applicant Name (print) Applicant Signature*_, -Date ..5 ja -7 1 -11 A Co -Applicant Name (print) CO -Applicant Signature* Co -Applicant Name (print) Co -Applicant Signature* Co -Applicant Name (print) Date Date Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date *Per my signature, the in -formation provided in this application is correct to the best of my knowledge. Duke Energy Page 10 of 13 rev 10,1U2019 Excavation Program Excavation Project User's Agreement Letter (Please fill in the blanks. Please Print) Date 5�—'- 1 -a, I TO: Duke Energy c/o Lake Services - EC 12Q 526 S. Church Street Charlotte, NC 28202 RE: Excavation For (Subdivision and Lot #'s or Other Project Name) (Lake/County/City) r•, o r,mao /�'' k � / (Applicant's full name) ��,�� &_; y10aLker5►AR ffaTo- hereby agrees to comply with all recommendations, requireme s and/or conditions of Duke Energy, General Permit(s) (if applicable) and other federal, state and local agency requirements pertaining to the application to excavate for the purpose of a j=Q± aae-e-ss IAe,odOCAS - In addition, I/we have read and agree to comply with Duke Energy's current Shoreline Management Plan (SMP) or other applicable guidelines, much of which is repeated herein, and understand that written authorization must be obtained from Duke Energy prior to beginning any activity within the Federal Energy Regulatory Commission (FERC) project boundary or on Duke Energy property associated with a reservoir, collectively referred to as Project Boundary. The excavation will be completed as described in the approved application and within eighteen (18) months from the date of written approval by Duke Energy, unless specifically noted otherwise in the application or unless 1/we obtain approval for a single, time extension (maximum of one year) in writing from Duke Energy. I/we understand that if the SMP or other applicable guidelines or rules change during any extension period, 1/we will be expected to comply with the new requirements to the maximum extent practicable. I/we also recognize that failure to complete the excavation within this build -out period will require the filing of a new application within the then - current SMP or other applicable guidelines and the new application must include any applicable fees and security deposits. I/we attest to be the owner(s) or lease holder(s) of the land immediately adjoining the Project Boundary where the excavation activity is to take place, or if not the owner or lease holder, I/we have included proof of title to the property and written authorization from the owner(s) or lease holder(s) to carry out the proposal within the Project Boundary adjacent to their land. I/we attest to be the owner(s) or lease holder(s) of the land that will be used for equipment staging and disposal of excavated material or if not the owner or lease holder, I/we have included proof of title to the property and written authorization from the owner(s) or lease holder(s) to carry out the work on their land. Duke Energy Page 1 Rev: 4/6/2020 I/we understand that all excavation work must be done directly in front of my/our property and as specified in Duke Energy's approval. Uwe also understand that access channels must run perpendicular to the shoreline while within the third of the cove area that is nearest mylour property. 1/we understand that for proposed excavations, Ilwe must notify the appropriate local, state and federal agencies in advance of the activity by sending them a completed copy of Duke Energy's Excavation Permit Application Form and other required information. I/we understand that written authorization and/or other permits may be required by some of these agencies and such required authorizations must be obtained before Ilwe submit the final application to Duke Energy. At FERC-licensed reservoirs, Uwe understand that except for maintenance excavations, any excavation exceeding 2000 cubic yards of material removed or any excavation or shoreline stabilization work needed to support an application that requires FERC review does itself require specific review and approval by the FERC before Duke Energy can issue any approvals. Ilwe agree that unless specifically approved otherwise in the application, explosives will not be used as part of this excavation activity. Ewe understand that every reasonable effort must be made to minimize any adverse impact on fish, wildlife and other natural resources. Ilwe understand that applicants in South Carolina proposing excavations that are not covered under the General Permit, or are greater than 150 cubic yards, must receive prior written authorization from the South Carolina Department of Health and Environmental Control (SCDHEC) or the US Army Corps of Engineers (as applicable) before submitting the completed application to Duke Energy. I/we agree that excavation activities will not occur during the months of March, April, May and June because of the potential impacts to fish spawning areas. Ilwe understand that trees and vegetation growing within or adjoining the lake play an important role in its overall environmental condition, and the ecological benefit the vegetation has on fish and wildlife habitat directly supports a sound and healthy lake environment. Ilwe also understand that unauthorized removal of shoreline vegetation (e.g. button bushes, willows, cattails, etc.) and/or disturbance of the shoreline buffer may result in suspension or denial of lake use permitting requests, forfeiture of security deposits and require re-establishment of vegetation at mylour expense, particularly if the disturbance is found to be in violation of state or local ordinances or impacts FERC project buffers. Ilwe agree all excavated material will be placed in upland areas, landward of the Project Boundary, and confined to prevent erosion and sedimentation back into the lake or nearby streams. Duke Energy Page 2 Rev: 4/6/2020 Uwe agree to adequately stabilize all excavated material and all disturbed shoreline to prevent erosion and runoff into the lake. Uwe understand that the double handling of excavated material will not be allowed; therefore, all excavated material must be placed above the Project Boundary in one handling. I/we have designed the hydraulic excavation process (if any will be used) so that return water re- enters the lake in the same general vicinity and cove as the excavation, to the maximum extent practicable. I/we agree that the proposed excavation will not be for the purpose of creating additional shoreline, will not alter the Project Boundary or the full pond contour, and will not impact threatened or endangered species, historic properties, or environmentally -important areas, unless special public entity provisions were made in the application. 1/we recognize that it is my/our responsibility to clearly locate in the field and label on my/our work area drawings any areas that require specific protection or avoidance during this excavation work. Examples of these protection/avoidance areas include but are not limited to, any Environmental Areas, Natural Areas or Impact Minimization Zones as identified by Duke Energy; jurisdictional wetlands; historic properties; rare or threatened species; and buried gas, water, sewer, electric or communications lines. I/we agree to provide my/our contractor with a copy of these work area drawings showing these areas to stress the necessary protection measures. Uwe agree that if any archaeological resources (e.g. pottery shards, Indian artifacts, etc,) are discovered during the excavation, work shall be halted immediately. Uwe will then notify Duke Energy and the State Historic Preservation Office to determine what measures, if any, Uwe must pursue to protect or salvage the archaeological resources. Uwe agree that any excavation from within the Project Boundary will not exceed the volume as outlined in the application and will remove and disturb only what is absolutely necessary to achieve the project's stated purpose. Uwe agree to be fully responsible for the permitted lake use and 1/we understand that this responsibility is considered to transfer automatically along with ownership and leases of the adjoining tract. 1/we understand Duke Energy representatives may issue Stop Work Directives for violations of the SMP or other applicable guidelines and other consequences may result from such violations, including but not limited to suspension or cancellation of approved permits, increases in fees, modification or removal of non -complying structures and restoration of disturbed areas at my/our own expense or loss of any consideration for future lake use permits. I/we agree to immediately comply with any Stop Work Directives, to fully cooperate with Duke Energy and other agencies as necessary, and to perform the necessary remedial actions within the specified time frame. Duke Energy Page 3 Rev: 4/6/2020 Vive agree to develop any required mitigation plans and to complete any required mitigation activities atniy/our own expense within the specified time frames. 11we recognize that the excavation work is not considered complete and deposits will not be refunded until the mitigation requirements (if any) have been satisfactorily fulfilled. I �!a �ee �10 110�tifDtukie Energy by phone when the excavation is initiated and to ensure that during the excavation period t/we will ast Duke Ever 's a roval letter in a clear ware roof at the lob site and visible from the water°s edge 11we agree to notify Duke Energy in writing when the excavation is Completed (including any required mitigation measures) and that the excavation was completed per the approved application, so a close-out inspection can be performed. IlIve recognize security deposits will not be refunded if any violations of the SNIP, other applicable guidelines, or this user's agreement occur. ,ale understand there will be no change in hydro project operations as a result of the excavation and/or utilization of the excavated area. Ilwe agree to maintain the work area in a safe condition and to fully indemnify and save Duke Energy harmless from any and all claims, liability, loss or damage that may arise from this excavation project. I/we understand that this user's agreement does not, in any way, constitute the transfer of any rights in real property and that mylour use and enjoyment of FE­RC project and Duke Energy lands and waters shall not hinder the general public's lawful use and enjoyment of the same. Sincerely, (Print) Appficla�,Vs 1 me (Prin�t Co -Applicant's Name (Print) &-_Applicant's Name (Print) Co -Applicant's Name (Print) Co -Applicant's Name (Print) Applicant's 'Co -Applicant's Signature Co -Applicant's signature Co -Applicant's Signature Co -Applicant's Signature F)"k. Energy Pap 4 PVI 4W10210 3577-0416 SPECIAL WARRANTY DEED FILED ELECTRONICALLY CATAWBA COUNTY NC DONNA HICKS SPENCER FILED Jun 10, 2020 AT 11:14:00 AM BOOK 03577 START PAGE 0416 END PAGE 0417 INSTRUMENT # 10836 EXCISE TAX $2,220.00 Excise Tax: $2,220.00 Tax Parcel ID No.: 470104747078; 470104745196 _ Verified by: Catawba County on the day Mail/Box to: Grantee , 20 By: This instrument was prepared by: Kevin C. Donaldson, Jones, Childers,; P. O Box 3010, Mooresville, NC 28117 Brief description for the Index: Tract A - .821 acres" and "Tract.B;- 2.4 THIS DEED, made this the 9th day of June, 2020, by and between GRANTOR: Bill' s Marina, Inc., a North Carolina corporation whose mailing address is P.Q. Box 36Q8 Mooresville, NC 2 (herein referred to as Grantor} and, GRANTEE: Waterside Marina, LLC, a North Carolina limited liability whose mailing address is 762 Brawley School Road, Moore; (herein referred to collectively as Grantee) and WI TNE3SETH: aldson & Webb, PLLC, 149 Welton Way, — Plat Book 67, Page 98 117 For valuable consideration from Grantee to Grantor, the receipt and sufficiency of which is hereby acknowledged, Grantor hereby gives, grants, bargains, sells and conveys unto Grantee in fee simple, subject to the Exceptions and Reservations hereinafter provided, if any, the following described property located in the Town of Catawba, Township of Catawba, County of Catawba, State of North Carolina, more particularly described as follows: BEING all that property shown as "Tract A - .821 acres" and "Tract B - 2.420 acres" on that record plat captioned "Exempt Subdivision Plat of property of: Bobby Ray Kale Testamentary Trust, Jane F. Spidel and Patsy M. Hope on Hudson Chapel Road" recorded at Plat Book 67, Page 98, of the Catawba County Registry. There is also conveyed herewith all of the Grantor's right, title and interest in and to that certain Right of First Refusal dated May 23, 2008 and recorded in Book 2914, Page 1073, Catawba County Registry, Said property having been previously conveyed to Grantor by instrument(s) recorded in Book 2914, Page 1039 and Book 2914, Page 1043 and being reflected on plat(s) recorded in Map/Plat Book 67, page/slide 98, All or a portion of the property herein conveyed does not include the primary residence of a Grantor. Revised December 17, 2009 submitted electronically by "]ones, Childers, Donaldson & Webb, PLLC" in compliance with North Carolina statutes governing recordable documents and the terms of the submitter agreement with the Catawba county Register of Deeds, 3577-0417 TO HAVE AND TO HOLD unto Grantee, together with all privileges and appurtenances thereunto belonging, in fee simple, subject to the Exceptions and Reservations hereinafter and hereinabove provided, if any. And Grantor hereby warrants that Grantor has done nothing to impair the title as received by Grantor and that Grantor will forever warrant and defend the title against the lawful claims of all persons claiming by, through or under Grantor. This conveyance is made subject to the following Exceptions and Reservations: 1. ANY AND ALL EASEMENTS, RIGHTS OF WAY AND RESTRICTIONS OF RECORD. 2. ANY AND ALL ZONING AND PLANNING ORDINANCES. All references to Grantor and Grantee as used herein shall include the parties as well as their heirs, successors and assigns, and shall include the singular, plural, masculine, feminine or neuter as required by context. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. Bill's Marina,,Jitc., fi North Carolina corporation By: Jeffery,C;ern , President State of North Carolina County of Iredell I certify that the following person personally appeared before me this day, each acknowledging to me that he signed the foregoing document: Jeffery Cernuto, President of Bill's Marina, Inc., a North Carolina corporation. Date: ZG E, C' 2 ea iNotary Public Notary's Printed or Typed Name My Commission Expires: - ID---J� (Official/Notarial Seal) rz V,GooQ 'f t 0 Tq 9j_ SUB LiG C 0 ti Revised December 17, 2009 RIGHTS CONVEYED TO: Description of Proposed Activity Waterside Marina, LLC Point of Contact: David Sisko or G. Randy Keith 7774 Hudson Chapel Rd Catawba, NC 28609 Sisko: (704) 500-6124 email: desisko()hotmail.com Keith: (704) 902-5445 email: randvo_watersidedocks.com Description of Proposed Activity: Waterside Docks & Piers, Inc. purchased Bill's Marina, a true public marina in June 2020. The new name is Waterside Marina. The property is located at 7774 Hudson Chapel Road in Catawba, North Carolina. The Duke Energy FERC- SMP map classifies the shoreline as Commercial Marina. Waterside Marina is seeking approval to apply for a FERC application to rebuild/install new wet slips and improvements to the marina that will serve the public by providing gas, restrooms, waste pump out and a ship -store. The previous facility was in disrepair and had some non -conforming elements including the length of the structures and size of the lease area. Additionally, in general the lake area above the NC-150 bridge and specifically this upper norther portion of the lake, has very limited access to true public marinas. As a result, the construction of this marina will likely result in great public access to the lake and availability of amenities for the boating public. There will be no predetermined user group for the marina facilities. Waterside Marina will be installing the following: • Restrooms and Office • Ship -Store • Seventy-eight (78) wet slips and 11 jet ski docking stations • Fuel dock - (2) fuel slip, Addition to the 78-wet slip • One (1) of the (78) slips is designated for Charter Boat mooring. • Pump Out will be offered utilizing a mobile pump out unit • Three (3) dry storage building with office and bathrooms • Maintenance to the existing concrete watercraft launch ramp Waterside Docks & Piers, Inc. Marina Application February 2021: Request for Permission to construct and install Floating Boat Slips, Shoreline Stabilization, Dredging, Dry Stack Storage, Ship store, restrooms and Offices for use as a True Public Marina Waterside Marina, LLC • 30' wide concrete bulkhead • Commercial staging area • Shoreline stabilization/maintenance to existing rip rap • Dredging -spot dredge shallow areas (4) approx. 2,912 cu. Yds The engineered plans call for the installation of a total of four clusters of wet slips totaling 78 mooring berths, 11 Jet ski floating berths and one fueling dock with two berths. The wet slips will be constructed with galvanized steel frames, black encapsulated floats properly sized to support required dead and live loads. All walking surfaces will be decked with PVC decking. The mooring slips will be equipped 20amp and 30amp receptacles and freshwater bibs. Three of the four clusters will be covered with a metal style roof. Wet Slips: Below is a list of the number and sizes of berthing locations: A- Cluster Dock • (19 total) Nine slips 11'x 30', four slips 11'x 24', six slips 11'x 20' and seven Jet ski ports. All covered. B- Cluster Fuel Dock • (2) Double slip fuel dock: 8'x 42' main crosswalk, 4'x 20' finger pier left, 6'x 30' finger pier in center and 4'x 12' finger pier right. Not covered. C- Cluster Dock • (10 total) Ten slips 11'x20". Not covered. D- Cluster Dock • (25 total) Nineteen slips —1 Vx 24', six 1 Vx30 and two Jet ski ports. All Covered E- Cluster Dock • (24 total) thirteen slips 1 Vx 24', four slips 12'x 30', one 12'x 40', two 15'x 40 'and four 16'x 50'. One of the 16'x 50' for Charter Boat mooring. All Covered. 11 P a g e 762 Brawley School Rd Mooresville, NC 28117 Phone: 704-660-0360 Fax: 704-660-0364 Waterside Docks & Piers, Inc. Marina Application February 2021: Request for Permission to construct and install Floating Boat Slips, Shoreline Stabilization, Dredging, Dry Stack Storage, Ship store, restrooms and Offices for use as a True Public Marina Waterside Marina, LLC Existing concrete launch ramp: The existing concrete watercraft launch ramp will be repaired with concrete patching and poured section above the 760 elevation to enhance watercraft launching. The concrete ramp will be closed to the public and available only for emergency use such Fire Department, NC Wildlife, Local Authorities emergencies and training sessions and occasionally commercial staging use. Commercial Staging Area: We will designate and area for a commercial area for contractors to remove construction debris, dredge spoils and load shoreline stabilization materials on barges. The contractors will be scheduled during times of low occupancy by the public. The materials will be transferred utilizing the concrete bulkhead and commercial trucks and trailers. The commercial staging use will be limited to Monday — Thursdays from 7am to 4.30 pm. Buffer Zone: Boardwalk: For public safety a boardwalk will connect cluster docks C, D and E. It will be 6 feet wide and approximately 100 feet long placed above the project boundary. • During the construction of the boardwalk, we will remove trees in the pathway of the construction. • For safety reasons we will need to remove the brush, debris and trees on the steep hill to the right of the boardwalk and stabilize the area. Best management practices will be utilized to insure as little disturbance as possible and we will work with the Department of Natural Resources (DNR). 21 Page 762 Brawley School Rd Mooresville, NC 28117 Phone: 704-660-0360 Fax: 704-660-0364 Waterside Docks & Piers, Inc. Marina Application February 2021: Request for Permission to construct and install Floating Boat Slips, Shoreline Stabilization, Dredging, Dry Stack Storage, Ship store, restrooms and Offices for use as a True Public Marina Waterside Marina, LLC • Existing structures in the buffer such as retaining walls, stairs to the restaurant, etc. will be repaired and improved from years of neglect. Minimal disturbance, no trees will be removal for these repairs. Shoreline Stabilization: Perform maintenance to the existing shoreline stabilization by installing geo-tech erosion control matting over laid with mixture of Class B and Boulder size stone on 436.38 feet of the 466.38 feet of shoreline. The entire shoreline other than the proposed bulkhead and existing boat ramp will be stabilized/maintained with rip rap. There are no pipeline trenches or other land disturbances associated with this request. Silt fences will be used to avoid sedimentation run off during construction. Best management practices will be utilized to insure as little disturbance as possible. There are several trees undermined and severely leaning over the project boundary that will be removed during this stabilization maintenance. Dry Stack Watercraft Storage: Dry stack storage is planned on the property above the 760 elevation. We are planning three (3) three -wall metal buildings 30' wide and 100' long. The three storage facilities will store up to 150 watercrafts. The watercrafts will be launched utilizing a marine forklift and the proposed concrete bulkhead. The Offices and public restrooms will be in a central location related to parking, dry stack and wet slips. Dredging: The dredging operation will provide a navigable channel to enter the marina basin. The shallow areas where silt and sand have prevented watercraft navigation will be removed. 31 Page 762 Brawley School Rd Mooresville, NC 28117 Phone: 704-660-0360 Fax: 704-660-0364 Catawba Indian Nation Tribal Historic Preservation Office 1536 Tom Steven Road Rock Hill, South Carolina 29730 Office 803-328-2427 Fax 803-328-5791 August 2, 2021 Attention: Janice Estep CBC Stone & Recycling Re. THPO # TCNS # Project Description 2021-566-21 Waterside Marina — 7774 Hudson Chapel Road, Catawba, NC 28609 Dear Ms. Estep, The Catawba have no immediate concerns with regard to traditional cultural properties, sacred sites or Native American archaeological sites within the boundaries of the proposed project areas. However, the Catawba are to be notified if Native American artifacts and / or human remains are located during the ground disturbance phase of this project. If you have questions please contact Caitlin Rogers at 803-328-2427 ext. 226, or e-mail Caitlin.Rogers@catawba.com. Sincerely, 11 _An Wenonah G. Haire fie+. Tribal Historic Preservation Officer ME O -J- 0 4- 5- 0" pwa*ms�m owms. W-Abow �,.s.�ix'�lt�...3Scn Lim k Sf ?der 4 t £� Yr of . r "'97y u Proposed fob Bulky od und ,. #4 #4 ' ;•'h r I � Found Found.,� in Front or Sul Tank UP Drive Found L 9 Sept '0�c (y SOPS V Septic Septic Lift por Lid r ,47 Cps rOh 4l bIL CoL- + 00LL h L� a L Ab La, 4a ^a t"Z 3., ,vim U�J\ Q.a © r j6: Ul '4, t August 9, 2021 TO: Waterside Marina, LLC 7774 Hudson Chapel Rd Catawba, NC 28606 RE: Shoreline Stabilization Mr. Sisko, I give permission for Waterside Marina, LLC to enhance and stabilize the shoreline via riprap and limited pruning of vegetation/trees on the property I own adjacent to 2122 Clyde Rd, Catawba, NC 28609 and 7774 Hudson Chapel Rd, Catawba, NC 28609 (Deed Book 1217 page 145). Sincerely, Mary Daniel 1826 Goat Rd d Catawba, NCJ28609 CC: Alan Johnson, Sr. Env. Specialist Dept of Water Quality s. g� f as' i F6 $ I � I g' 1,11 ZOO n ¢a s / m a z t7l fD EBX Buffer Mitigation Banks Statement of Availability August 16, 2021 NC Division of Water Resources Alan D Johnson 610 East Center Ave., Suite 301 Mooresville, NC 28115 Re Project: Waterside Marina, LLC This document confirms that Randy Keith and David Sisko (Applicant) for the Waterside Marina, LLC (Project) has expressed an interest to utilize 2,619.00 Suuare Feet of Riparian Buffer Mitigation Credits from the following bank, RES Dogtown Buffer Mitigation Bank. The specific bank site that may be debited Dogtown, that is located in the Catawba River watershed, specifically HUC 03050101. As the official Bank Sponsor, EBX, attests to the fact that mitigation is available for reservation at this time. These mitigation credits are not considered secured, and consequently are eligible to be used for alternate purposes by the Bank Sponsor, until payment in full is received from the Applicant resulting in the issuance of a Mitigation Credit Transfer Certificate by the bank acknowledging that the Applicant has fully secured credits from the bank and the Banker has accepted full responsibility for the mitigation obligation requiring the credits/units. The Banker will issue the Mitigation Credit Transfer Certificate within three (3) days of receipt of the purchase price. Banker shall provide to Applicant a copy of the Mitigation Credit Transfer Certificate and a documented copy of the debit of credits from the Bank Official Credit Ledger(s), indicating the permit number and the resource type secured by the applicant. A copy of the Mitigation Credit Transfer Certificate, with an updated Official Credit Ledger will also be sent to regulatory agencies showing the proper documentation. Please contact me at 919-209-1075 or eparker dres.us if you have any questions Best, Caitlan B. Parker Resource Environmental Solutions, LLC 701 E. Bay Street, Suite 306 Charleston, SC 29403 Bank Sponsor — Environmental Banc & Exchange (EBX) CATAWBA RIPARIAN RUFFER NOTIFICATION FORM 28toog Project~-----`---'~~~ County:. Print Contractor/agent: ( Print � � ~/ `—�' /'/ ( / om/mu/nz The approval isfor the purpose and design described in your application. Impacts not indicated in the application isaviolation ofthe Buffer Rule. Site specific work should be provided |nthe —application. /15ANCAC Trees are not allowed toberemoved from Zone 1ufthe Buffer (within 3Oftofthe full pond elevation),unless approved. Exception, those trees that are severely undermined along the immediate shoreline can beremoved Minimal shaping and sloping along the immediate shoreline is allowed. 115A NCAC 02B.0243(6)] ' Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B.0243 (6)) Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved b«the Division. There are limitation onsize for decks. [I5ANCACOIB.D243(4)and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must beoutside the buffer. [1SANCA[D2H.O582and 16ANC4COl8.O243(4),(S)'(8)] Stonnwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. (15A NCAC 02B.0243(5), (6)] Acknowiedgernent oƒMotificodon 1, Ra"A , herebv state that I have been informed of the Catawba Riparian 6uffeF4ule. Any work conducted in the buffe'r, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting Signature (owner): /Z,2!!7- Date:_, 9,� 12:117 1 La ke (At Fu it Pord/Nortnal WaterLevei) 6 J, z I 122 U i Kh eckd 'Boo-+ rarr? Adjcxcen4 ?rbPcr�Y Full Pond/ w, F �ol ka-% n I ram() \1 CA Please approximately sketch the following information on this plan, length of shoreline (Provide dimensions for each item, such cos loft x looft)*: I. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 9/17/21, 11:30 AM 610 East Center Avenue, Mooresville, NC to 7774 Hudson Chapel Rd, Catawba, NC 28609 - Google Maps Go gle 610 East Center Avenue, Mooresville, NC to 7774 Drive 18.8 miles, 34 min Hudson Chapel Rd, Catawba, NC 28609 Map data ©2021 2 mi ■ a 610 E Center Ave Mooresville, NC 28115 t 1. Head south on Evergreen St toward E Center Ave 197 ft f*, 2. Turn right onto E Center Ave 381 ft I Turn right onto E Statesville Ave 1.2 mi 4. E Statesville Ave turns slightly right and becomes NC-115 N/N Broad St 0 Continue to follow NC-115 N Pass by McDonald's (on the right in 6.1 mi) 10.1 mi 5. Turn left onto Old Mountain Rd 32 mi 6. Turn left onto Buffalo Shoals Rd 4.1 mi T 7. Continue onto Hudson Chapel Rd Destination will be on the right 0.2 mi 7774 Hudson Chapel Rd https://www.google.comlmapsldirl6lO+East+Center+Avenue,+Mooresville,+NC/7774+Hudson+Chapel+Rd,+Catawba,+NC+28609/@35.6572163, 80.... 1/2 +cats nrba count Geospatial *Llwt MAKING< LIVING, SETT{ Infarmat c n Services Real Estate Search N W E 1 in=200ft S Parcel: 470104747078, 7774 HUDSON CHAPEL RD CATAWBA, 28609 Owners: WATERSIDE MARINA LLC, Owner Address: 762 BRAWLEY SCHOOL RD Values - Building(s): $154,000, Land: $348,500, Total: $502,500 This map/report product was prepared from the Catawba County, NC Geospatial Information Services. Catawba County has made substantial efforts to ensure the accuracy of location and labeling information contained on this map or data on this report. Catawba County promotes and recommends the independent verification of any data contained on this map/report product by the user. The County of Catawba, its employees, agents, and personnel, disclaim, and shall not be held liable for any and all damages, loss or liability, whether direct, indirect or consequential which arises or may arise from this map/report product or the use thereof by any person or entity. Copyright 2021 Catawba County NC 06/17/2021 cata�wba taunt Geospatiai ' MAKING. LIVING. IMM ty Information Services Real Estate Search N W E 1 in=200ft S Parcel: 470104747078, 7774 HUDSON CHAPEL RD CATAWBA, 28609 Owners: WATERSIDE MARINA LLC, Owner Address: 762 BRAWLEY SCHOOL RD Values - Building(s): $154,000, Land: $348,500, Total: $502,500 This map/report product was prepared from the Catawba County, NC Geospatial Information Services. Catawba County has made substantial efforts to ensure the accuracy of location and labeling information contained on this map or data on this report. Catawba County promotes and recommends the independent verification of any data contained on this map/report product by the user. The County of Catawba, its employees, agents, and personnel, disclaim, and shall not be held liable for any and all damages, loss or liability, whether direct, indirect or consequential which arises or may arise from this map/report product or the use thereof by any person or entity. Copyright 2021 Catawba County NC O6/17/2021 a I-'' NIX. eN-.N--�•—�p UOm Xxoxxxx x o� II II j II II II it p ma N o A N fy ¢t/lm¢IUww jj r r Jill A 'Till, a tiv, wvmm!; Eiji 'zi 9555959559 \J F a gkk ,,gg as p Iz#=Ax �kaarB F¢ e.. } •=}a Min ]"junk� =}F agog U deffi a., � 4 ------�-'.'- Z'�.e e'� AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. IPLAN NO. PARCEL ID: Please print: Property Owner: Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize Of tQact onnybehalf and take all actions necessary for the processing, issuance and acceptance of this permit orcertification and any and all standard and special conditions attached, Property Owner's Address (if different than property above): Wehereby certify the above information submitted in this application is true and accurate to the Authorized Sigg ature Authorized Signature Date. Date;