Loading...
HomeMy WebLinkAbout20180786 Ver 1_As-Built Baseline and Record Drawings_20210429Strickland, Bev From: Crocker, Lindsay Sent: Thursday, April 29, 2021 4:30 PM To: Kim Browning; Tugwell, Todd J CIV USARMY CESAW (US); Haywood, Casey M CIV (USA); Davis, Erin B; Wilson, Travis W. Cc: Dow, Jeremiah J; Jason Lorch; Baumgartner, Tim; Harmon, Beth; Stanfill, Jim Subject: As -Built Baseline and Record Drawings / Sandy Branch / SAW-2018-01167 / Chatham Co. Attachments: Sandy Branch_100060_CF 03_STR_RW_Initial Release.pdf Follow Up Flag: Follow up Flag Status: Flagged All, The final baseline (as -built) report and record drawings were uploaded to the DMS/IRT SharePoint (and DWR Laserfiche) for IRT review: https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx Project Information -- Name: Sandy Branch USACE ID: SAW-2018-01167 DWR ID: 2018-0786 DMS Project #: 100060 RFP: 16-007331—Issued 9/8/2017 Institution: 4/20/2018—Full Delivery River Basin: Cape Fear 03030003 County: Chatham Mitigation Plan Assets: 3,286.000 SMUs (Warm) / 7.267 WMUs As -built Assets: 3,286.000 SMUs (Warm) / 7.267 WMUs Design stream length was 3,286 If and as -built stream length is 3,251 If. No change in project stream credits is requested. Provider: Wildlands Engineering, Inc., Jason Lorch, 919-851-9986 DMS PM: Jeremiah Dow, 919-218-0226 Please note: Stream construction was completed September 2020, planting was completed January 2021. 2021 will be Monitoring Year 1 for this project. Deviations from the construction plan are shown on page 5-1 and 5-2 of the report. A drone video of the site is available here: https://www.youtube.com/watch?v=VRT-D5NSfks The credit ledger for the 30% release was posted and is attached. Lindsay Crocker NC DEQ Division of Mitigation Services 217 West Jones St., Raleigh, NC 27603 919.594.3910 1 lindsay.crocker@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. 2 Mitigation Project Name Sandy Branch USACE Action ID 2018-01167 DMS ID 100060 DWR Permit 2018-0786 River Basin Cape Fear Date Project Instituted 4/20/2018 Cataloging Unit 03030003 Date Prepared 4/8/2021 County Chatham Stream/Wet. Service Area Cape Fear 03030003 Signature of Official Approving Credit Release 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 985.800 985.800 0.000 985.800 2021 4/8/2021 3 - Year 1 Monitoring 10.00% 328.600 2022 4 - Year 2 Monitoring 10.00% 328.600 2023 5 - Year 3 Monitoring 10.00% 328.600 2024 6 - Year 4 Monitoring 5.00% 164.300 2025 7 - Year 5 Monitoring 10.00% 328.600 2026 8 - Year 6 Monitoring 5.00% 164.300 2027 9 - Year 7 Monitoring 10.00% 328.600 2028 Stream Bankfull Standard 10.00% 328.600 2025 Totals 985.800 Total Gross Credits 3,286.000 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 985.800 Total Percentage Released 30.00% Remaining Unreleased Credits 2,300.200 Credit Release Milestone Riparian Credits Project Credits Scheduled u Releases /o Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 2.180 2.180 0.000 2.180 2021 4/8/2021 3 - Year 1 Monitoring 10.00% 0.727 2022 4 - Year 2 Monitoring 10.00% 0.727 2023 5 - Year 3 Monitoring 15.00% 1.090 2024 6 - Year 4 Monitoring 5.00% 0.363 2025 7 - Year 5 Monitoring 15.00% 1.090 2026 8 - Year 6 Monitoring 5.00% 0.363 2027 9 - Year 7 Monitoring 10.00% 0.727 2028 Totals 2.180 Total Gross Credits 7.267 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 2.180 Total Percentage Released 30.00% Remaining Unreleased Credits 5.087 Page 1 of 2 Mitigation Project Name Sandy Branch USACE Action ID 2018-01167 DMS ID 100060 DWR Permit 2018-0786 River Basin Cape Fear Date Project Instituted 4/20/2018 Cataloging Unit 03030003 Date Prepared 4/8/2021 County Chatham Stream/Wet. Service Area Cape Fear 03030003 Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 3,286.000 Riparian Restoration 8.540 Debits Warm Stream Restoration Credits Riparian Restoration Beginning Balance (mitigation credits) 3,286.000 7.267 Released Credits 985.800 2.180 Unrealized Credits 0.000 0.000 Converted Credits 0.000 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 985.800 2.180 Remaining Balance (Unreleased credits) 2,300.210 5.087 Total Remaining Balance (Released and Unreleased credits) 3,286.000 7.267 Page 2 of 2