HomeMy WebLinkAbout20180786 Ver 1_As-Built Baseline and Record Drawings_20210429Strickland, Bev
From: Crocker, Lindsay
Sent: Thursday, April 29, 2021 4:30 PM
To: Kim Browning; Tugwell, Todd J CIV USARMY CESAW (US); Haywood, Casey M CIV
(USA); Davis, Erin B; Wilson, Travis W.
Cc: Dow, Jeremiah J; Jason Lorch; Baumgartner, Tim; Harmon, Beth; Stanfill, Jim
Subject: As -Built Baseline and Record Drawings / Sandy Branch / SAW-2018-01167 / Chatham
Co.
Attachments: Sandy Branch_100060_CF 03_STR_RW_Initial Release.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
All,
The final baseline (as -built) report and record drawings were uploaded to the DMS/IRT SharePoint (and DWR Laserfiche)
for IRT review: https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx
Project Information --
Name: Sandy Branch
USACE ID: SAW-2018-01167
DWR ID: 2018-0786
DMS Project #: 100060
RFP: 16-007331—Issued 9/8/2017
Institution: 4/20/2018—Full Delivery
River Basin: Cape Fear 03030003
County: Chatham
Mitigation Plan Assets: 3,286.000 SMUs (Warm) / 7.267 WMUs
As -built Assets: 3,286.000 SMUs (Warm) / 7.267 WMUs
Design stream length was 3,286 If and as -built stream length is 3,251 If. No change in project stream credits is
requested.
Provider: Wildlands Engineering, Inc., Jason Lorch, 919-851-9986
DMS PM: Jeremiah Dow, 919-218-0226
Please note:
Stream construction was completed September 2020, planting was completed January 2021. 2021 will be Monitoring
Year 1 for this project. Deviations from the construction plan are shown on page 5-1 and 5-2 of the report.
A drone video of the site is available here: https://www.youtube.com/watch?v=VRT-D5NSfks
The credit ledger for the 30% release was posted and is attached.
Lindsay Crocker
NC DEQ Division of Mitigation Services
217 West Jones St., Raleigh, NC 27603
919.594.3910
1
lindsay.crocker@ncdenr.gov
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third
parties unless the content is exempt by statute or other regulation.
2
Mitigation Project Name Sandy Branch USACE Action ID 2018-01167
DMS ID 100060 DWR Permit 2018-0786
River Basin Cape Fear Date Project Instituted 4/20/2018
Cataloging Unit 03030003 Date Prepared 4/8/2021
County Chatham Stream/Wet. Service Area Cape Fear 03030003
Signature of Official Approving Credit Release
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to
the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Warm Stream Credits
Project Credits
Scheduled
Releases %
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
985.800
985.800
0.000
985.800
2021
4/8/2021
3 - Year 1 Monitoring
10.00%
328.600
2022
4 - Year 2 Monitoring
10.00%
328.600
2023
5 - Year 3 Monitoring
10.00%
328.600
2024
6 - Year 4 Monitoring
5.00%
164.300
2025
7 - Year 5 Monitoring
10.00%
328.600
2026
8 - Year 6 Monitoring
5.00%
164.300
2027
9 - Year 7 Monitoring
10.00%
328.600
2028
Stream Bankfull Standard
10.00%
328.600
2025
Totals
985.800
Total Gross Credits
3,286.000
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
985.800
Total Percentage Released
30.00%
Remaining Unreleased Credits
2,300.200
Credit Release Milestone
Riparian Credits
Project Credits
Scheduled
u
Releases /o
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
2.180
2.180
0.000
2.180
2021
4/8/2021
3 - Year 1 Monitoring
10.00%
0.727
2022
4 - Year 2 Monitoring
10.00%
0.727
2023
5 - Year 3 Monitoring
15.00%
1.090
2024
6 - Year 4 Monitoring
5.00%
0.363
2025
7 - Year 5 Monitoring
15.00%
1.090
2026
8 - Year 6 Monitoring
5.00%
0.363
2027
9 - Year 7 Monitoring
10.00%
0.727
2028
Totals
2.180
Total Gross Credits
7.267
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
2.180
Total Percentage Released
30.00%
Remaining Unreleased Credits
5.087
Page 1 of 2
Mitigation Project Name Sandy Branch USACE Action ID 2018-01167
DMS ID 100060 DWR Permit 2018-0786
River Basin Cape Fear Date Project Instituted 4/20/2018
Cataloging Unit 03030003 Date Prepared 4/8/2021
County Chatham Stream/Wet. Service Area Cape Fear 03030003
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Warm Stream
Restoration
3,286.000
Riparian
Restoration
8.540
Debits
Warm Stream
Restoration
Credits
Riparian
Restoration
Beginning Balance (mitigation credits)
3,286.000
7.267
Released Credits
985.800
2.180
Unrealized Credits
0.000
0.000
Converted Credits
0.000
0.000
Owning Program
Req. Id
TIP #
Project Name
USACE Permit
#
DWR Permit
#
DCM Permit
#
Remaining Balance (Released credits)
985.800
2.180
Remaining Balance (Unreleased credits)
2,300.210
5.087
Total Remaining Balance (Released and Unreleased credits)
3,286.000
7.267
Page 2 of 2