Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20211381 Ver 1_Shoreline Stabilization_20210917
Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: Pre -Submittal Meeting Request Form.pdf 2.34MB Pre -fling Meeting or Request Date 8/17/2021 ID# Version I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * sara.nolan1965@gmail.com Rease provide an err -ail address for payrrent and requests for pure infornation here. Owner Information: Name: * Sara Nolan Email: * sara. nolan 1965@gmail. com Phone Number:* (704)564-9500 (xxx)xxx-xxxx Mailing Address:* Street Address 181 Castaway Trail Address Line 2 City State / Frovince / Region Mooresville NC Fbstal / Zip Code Country 28117-9675 US Is there an agent working on the project? * Agent/Consultant Information ................................................................................................................. Name: Company Affiliation:* Email: Phone Number:* Mailing Address:* F Yes r No Janice Estep CBC Stone & Recycling, LLC info@cbcstoneandrecychng.com (704)660-5111 (XXX)XXX-XXXX Address 638 Oakridge Farm Hwy Address Line 2 City Mooresville Fbstal / Zip Code 28115 Asigned and dated copyof the Agent Authorization letter:* Auth. Form.pdf 985.13KB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Nolan Shoreline State / Province / P9egion NC Country United States If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* r Upload File r Lookup address Property Address Lookup:* Street Address 181 Castaway Trail Address Line 2 City Mooresville Fbstal / Zip Code 28117-9675 Latitude:* 35.522357 State / Province / Region NC Country US Longitude:*-80.869366 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Site Plan.pdf 2.42MB Buffer Form.pdf 1.72MB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%2OLayout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Shoreline Pies.pdf 13.26MB 4. Location of the property (where work is to be conducted) Nearest Town:* Mooresville County: * Iredell Lake/ river/ ocean adjacent to Norman property: Subdivisions name or site address:* Castaway Shores Lot 17 Include phase/lot nunber Directions to site:* 610 E Center Ave Mooresville, NC 28115 Head south on Evergreen St toward E Center Ave 13 s (197 ft) Turn right onto E Center Ave 2 min (0.5 mi) Continue on S Church St to S Main St 2 min (0.6 mi) Turn left onto S Church St 0.5 mi Turn right onto College St 0.1 mi Take NC-115 S to Langtree Rd 9 min (4.5 mi) Turn left onto S Main St 1.2 mi Continue onto NC-115 S 2.1 mi Turn right onto Langtree Rd 1.2 mi Continue on Langtree Rd. Drive to Castaway Trail 2 min (0.7 mi) At the traffic circle, take the 2nd exit and stay on Langtree Rd 0.4 mi Turn left onto Castaway Trail Destination will be on the left 0.3 mi 181 Castaway Trail Mooresville, NC 28117 Rease include road naves and nunbers, landnarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Residential Residential, undeveloped, etc. 6. Property Size 1 acre Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Install an Alan Block wall to replace existing block wall 8. How will the work be done?* I7 From Land r From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 2.5' below (320 sf) square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 1' above (128 sf) 10' x 50' access corridor (500 sf of temp. impact) square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nunter of trees, for instance) Grass buffer, no trees removed, minimal disturbance to buffer Sketch: Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): 0 $240.00 for impacts to lake (below normal water level) of less than 1 acre 0 $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); 0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Janice Estep, Signature: ,-Z—wr65�o jdxrr y tvran � ��mr Submittal Date: 9/17/2021 Initial Review Is this accepted into the review process?* Project Number:* 20211381 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Alan Johnsomeads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 Contact Name * Contact Email Address Project Owner* Project Name * Project County* Owner Address: Is this a transportation project?* Janice Estep info@cbestoneandrecycling.com Sara Nolan Nolan Shoreline lredell Street Address 181 Castaway Trail Address Line 2 city Mooresville Fbstal / Zip (bde 28117 r' Yes C No Type(s) of approval sought from the DWR: I`— 401 Water Quality Certification - r 401 Water Quality Certification - Regular Express 1° Individual Permit r Modification Pr Shoreline Stabilization State / Province / ftim NC Country us Does this project have an existing project ID#? Yes (° No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below and include location information.* Install an Alan Block wall to replace existing block wall. By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your projects thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 8/17/2021 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: l8l ('ci,4auxt►.1 lr ,\_ rYl�esv'�l &! a�3ili County: 7ftdvkJ Owner: Print Contractor/agent: L Print Signature The approval is for the purpose and design described in your application. impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. (15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 028.0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. (15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification 1, — molar a tAol n . hereby state that i have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. n Signature (owner):` - t1r-'c __ i Date: R 10 - ';� I Full Pond/ Normal Water Level I '6-6ovf- Y, I-AE3' I a S Le-nb-4) joi Lu , ck-e- CS N" +Vce-s (-C-X-\nC)qCd fQ, C)'� MaA a. i'6+urbance- --Fo 40 0 FFCy- Please approximately sketch the following information on this plan, length of shoreline (Provide dimensions for each item, such as 10ft x 100ft)*: I. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation I Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 5 J 0 cn z 0 3 3 V) co CL CD co cn Prto =r Er ro E5* O AOL m 0 (D falf SD 0 z !R cZi SD z ILIF C9 CD cl) CO 0 5 CD --V ID CL O O. Sr 0 0 VMS z z co n 0 CD 0 G) CO 5 p b�app4 Q'i 4`r - zro_ws Zt..:d s. ___- ssr• ago tea.. aca/se — 71____ ? f go E ro �o r� OUJCIC� tS y,CU 1V0k., Suf'vy �S �► �'1e�(' %1U5 i t , name. IDA h�sb�nd �� c�ec�c�sec�• �- r y d • % rra� �' ? �• = 6Grrv08130PAGE r d1 iv iEpCLHNBt N COMY i certify that this map was drawn from an actual survey made by me and was prepared in accordance with G.S. 47-30 as amended and that the error of cWsure as csicWated is to 000' Bosom, not surveyed, if any, J we noted. Dead descript' are recorded in BOA , Page��_ f' Witness my hand and sea day of 07 TOW LAND SURVEYOR G t6ps i v� 9 C qs y • C Y . Y a v R y 4 m m $ 8 <D Z � r d � e h W Lai Z, 4 y 1 E Ta w o O A Z C:) w _ N ° �m JAMES S. , MICHAEL J. r Z T d N MORRIS, III N GRBDE i = N � O m ♦ii _ u D. B. 773, Pg. 673 D. B. 794, Pg. 436 .r P, B. 17, Pg. 84 ar LO T 16 a LOT IT i» "CASTA WA Y SHORES SU nvnmo D.B.727, Pg. 333 LOT 18 D V1S10N" � `pN 0 N26443rW - 3.00' per Actual Field SUM, r © co P R� 40 5-62! P W V I s J* W 'Tdbs a 4.� N •23�0x 38.81' S 5327"18" SIP S , 7 TT elf 'A% 140.00' 4F Taw � 35 .�`..-- 520 2 Stw y From* Comp. Roof 4Y '• J i 14.4' im Lot 18 CA '5'61 � 270J � Lot 16 Lot 17 O • ,L. "tom Is' 0. CASTAWAY TRAIL PHYSIQALSURVEY OF - LOT 17 CASTAWAY SHORES SCALE Vo 40# DA\ADSON TOWNSHIP, AECELL COUNT'%r, t4' . THE PROPERTY Of MICHAEL J. & SARA GR©DE MAP RECORDO IN BOOK - AT PACE -",,DEED RECORDED IN 13001< PAt2 W JAMtS 5. a� MIGHALL -% d a MORRIS- Itl N GRODE C G _ ° w D. 9.775, Pg. 673 i�u . D. B. 794, Pg. 436 er P. B . I T , Pg. 84 of LO T 16 a LOT 17 "CASTA WA Y SHORES N KURAS D.B. 727, Pg. 535 LOT 18 i SU DI VISION',- i 2 N264434 - (3ip.000`_ j N 542 2 `E — 140.94' 45 QO lb Q44 DUKE POWER COMPANY ( T. FRANK GUDGER) REF. MTN. ISLAND DWS. NO. 522 U. M.1. 660 L A K E I v SITE LOCATION MAP Nil Qt`Ai R x0A*-PAI fWLL. INC. CHMOM W 000.4$&- * NORNA N .a T3 Wit NOTE: 1. PINS SET 4-2- 87 DUKE POWER COMPANY COWANS FORD DEVELOPMENT LAND DEEDED TO MICHAEL J. GRODE DAVIDSON TOWNSHIP I RED£ LL COUNTY, MC. SCALE : I " 2 60' NOVEMBER 18, 1986 MISC. BOOK NO. 799 MTN. ISLAND FILE NO. 1330 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. Al — PLAN NO. PARCEL ID: STREET ADDRESS: Please print - Property Owner: Y-a Tqotcx:n Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize 0-n'� CC !F-54-LD , Of CYBC done L e C LI C J'i no (Contractor / Agent) (Name of consulting itrmyJ J to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): Telephone: IC>A-5LpL4-q,5bD We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. AU ori ed �Iignalre Authorized Signature Date: - AD- 3L 1 Date: