Loading...
HomeMy WebLinkAbout20180199 Ver 1_As-Built Review_20210729Strickland, Bev From: Crocker, Lindsay Sent: Thursday, July 29, 2021 10:27 AM To: Davis, Erin B; Haywood, Casey M CIV (USA); Kim Browning; Tugwell, Todd J CIV USARMY CESAW (US); Wilson, Travis W. Cc: Catherine Manner; Emily Dunnigan; Kayne Van Steil; Daniel Ingram; Baumgartner, Tim; Harmon, Beth; Stanfill, Jim Subject: NCDMS As -Built Review / Buffalo Creek Tributaries / SAW-2018-00425 / Johnston Co. Attachments: Buffalo Creek_100042_NS 01_STR_RW_Initial Release.pdf Follow Up Flag: Follow up Flag Status: Flagged Project information and location of the FINAL As -Built Baseline Monitoring Report (MY0): Project Information: Name: Buffalo Creek Tributaries USACE Action ID: 2018-00425 NCDWR ID: 2018-0199 V2 DMS Project: 100042 RFP: 16-007401— Issued 12/7/2017 Institution: 1/11/2018 — Full Delivery River Basin: Neuse 03020201 County: Johnston Mitigation Plan Assets: 4,088.500 SMUs/3.458 WMUs Provider: Water & Land Solutions (WLS) Catherine Manner, 571-643-3165 DMS PM: Lindsay Crocker, 919-593-3910 Please note: Earthwork was completed April 22, 2021 and planting was completed April 26, 2021. The as -built stream length is —24 linear feet more than the centerline design length. The final baseline (as -built) report, record drawings, and drone pictures were uploaded to the DMS/IRT SharePoint, and DWR Laserfiche for IRT review. The debit ledger is attached for review and signature. https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx Lindsay Crocker Eastern Regional Supervisor NC DEQ Division of Mitigation Services 217 West Jones St., Raleigh, NC 27603 919.594.3910 lindsay.crocker@ncdenr.gov DEQ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. 1 2 Mitigation Project Name Buffalo Creek Tributaries Mitigation Project USACE Action ID 2018-00425 DMS ID 100042 DWR Permit 2018-0199 River Basin Neuse Date Project Instituted 1/11/2018 Cataloging Unit 03020201 Date Prepared 7/20/2021 County Johnston Stream/Wet. Service Area Neuse 03020201 Signature of Official Approving Credit Release 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1,226.550 1,226.550 0.000 1,226.550 2021 7/20/2021 3 - Year 1 Monitoring 10.00% 408.850 2022 4 - Year 2 Monitoring 10.00% 408.850 2023 5 - Year 3 Monitoring 10.00% 408.850 2024 6 - Year 4 Monitoring 5.00% 204.425 2025 7 - Year 5 Monitoring 10.00% 408.850 2026 8 - Year 6 Monitoring 5.00% 204.425 2027 9 - Year 7 Monitoring 10.00% 408.850 2028 Stream Bankfull Standard 10.00% 408.850 2025 Totals 1,226.550 Total Gross Credits 4,088.500 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,226.550 Total Percentage Released 30.00% Remaining Unreleased Credits 2,861.950 Credit Release Milestone Riparian Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1.037 1.037 0.000 1.037 2021 7/20/2021 3 - Year 1 Monitoring 10.00% 0.346 2022 4 - Year 2 Monitoring 10.00% 0.346 2023 5 - Year 3 Monitoring 15.00% 0.519 2024 6 - Year 4 Monitoring 5.00% 0.173 2025 7 - Year 5 Monitoring 15.00% 0.519 2026 8 - Year 6 Monitoring 5.00% 0.173 2027 9 - Year 7 Monitoring 10.00% 0.346 2028 Stream Bankfull Standard N/A N/A N/A N/A N/A N/A N/A Totals 1.037 Total Gross Credits 3.458 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1.037 Page 1 of 2 Mitigation Project Name DMS ID River Basin Cataloging Unit County Notes Contingencies (if any) Project Quantities Buffalo Creek Tributaries Mitigation Project 100042 Neuse 03020201 Johnston USACE Action ID 2018-00425 DWR Permit 2018-0199 Date Project Instituted 1/11/2018 Date Prepared 7/20/2021 Stream/Wet. Service Area Neuse 03020201 Total Percentage Released 29.99% Remaining Unreleased Credits 2.421 Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 3,168.000 Warm Stream Enhancement I 1,296.000 Warm Stream Preservation 565.000 Riparian Restoration 3.420 Riparian Enhancement 0.075 Debits Warm Stream Restoration Credits Warm Stream Restoration Equivalent Credits Riparian Restoration Credits Riparian Restoration Equivalent Credits Beginning Balance (mitigation credits) 4,032.000 56.500 3.420 0.038 Released Credits 1,209.600 16.950 1.026 0.011 Unrealized Credits 0.000 0.000 0.000 0.000 Converted Credits 0.000 0.000 0.000 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 1,209.600 16.950 1.026 0.011 Remaining Balance (Unreleased credits) 2,822.400 39.550 2.394 0.027 Total Remaining Balance (Released and Unreleased credits) 4,032.000 56.500 3.420 0.038 Page 2 of 2