Loading...
HomeMy WebLinkAbout20180199 Ver 1_Notice of Initial Credit Release_20210825Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Wednesday, August 25, 2021 5:12 PM To: Crocker, Lindsay; Catherine Manner Cc: Tugwell, Todd J CIV USARMY CESAW (US); Haywood, Casey M CIV (USA); Davis, Erin B; Wilson, Travis W.; Merritt, Katie; kathryn_matthews@fws.gov; Bowers, Todd; Harmon, Beth; Matthews, Monte K CIV USARMY CESAW (USA); Crumbley, Tyler A CIV USARMY CESAW (USA); Gibby, Jean B CIV USARMY CESAW (USA); daniel@waterlandsolutions.com Subject: [External] Notice of Initial Credit Release/ NCDMS Buffalo Creek Tributaries Mitigation Site/ SAW-2018-00425/ Johnston Co. Attachments: Buffalo Creek_100042_NS 01_STR_RW_Initial Release KB.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good day, The 15-Day MYO/As-Built review for the Buffalo Creek Tributaries Mitigation Site (SAW-2018-00425) ended August 20, 2021. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. All comments received from the NCIRT are incorporated in the email below. Please address IRT concerns in the MY1 Report and provide a response to comments. A site visit is not requested at this time. There were no objections to issuing the initial 30% credit release of 1,226.550 warm SMUs and 1.037 riparian WMUs. Please find attached the current signed ledger. Was the drawing from the approved final mitigation plan used to show the red -lined changes? I noticed a few minor differences, near the BMPs and crossings. I also share the concern of potential future encroachment from the adjacent subdivision. In future monitoring years please capture veg data (in a random plot) in areas where the old channel was filled and wetland restoration is proposed. DWR Comments, Erin Davis: 1. The CCPV figure and redline as -built drawing both show the FG-1 on R4 located outside of the channel. Please confirm and accurately show this gauge location. 2. In the agency comments, the IRT asked for random veg plots along R5 and R6, which were not shown on the CCPV. Please update accordingly. 3. Photos along R5 show a lot of large stone lining the channel. Was this stone size included in the approved design plan? Based on the R5 reach drainage area is this armoring necessary? 4. Has the excess sediment shown in PS-2 Photo downstream of the MS-R2 culvert flushed through the project? 5. DWR appreciated the inclusion of the drone video. It was nice to see the effort made to minimize the construction footprint and disturbance to surrounding mature trees. USACE Comments, Casey Haywood: 1. Concur with DWR comments. 1 2. Appreciate the inclusion of the drone footage and photos of all monitoring devices. 3. The downstream photo of MS-R2 culvert appears to have significant amounts of sediment accumulation. Does WLS have any concerns in this area or is the sediment being flushed out? Also, please note USACE expressed sediment concerns on this reach in the MP comments and as a result WLS agreed to establish fixed photo points along this reach to document stream channel characteristics. Please establish these fixed photo points in future reports. Please reach out with any questions. Thanks, Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 2 Mitigation Project Name Buffalo Creek Tributaries Mitigation Project USACE Action ID 2018-00425 DMS ID 100042 DWR Permit 2018-0199 River Basin Neuse Date Project Instituted 1/11/2018 Cataloging Unit 03020201 Date Prepared 7/20/2021 County Johnston Stream/Wet. Service Area Neuse 03020201 KimberlyDanielle BrowningDigitally signed by Kimberly Danielle Browning Date: 2021.08.25 11:11:34 -04'00' Signature of Official Approving Credit Release 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1,226.550 1,226.550 0.000 1,226.550 2021 7/20/2021 3 - Year 1 Monitoring 10.00% 408.850 2022 4 - Year 2 Monitoring 10.00% 408.850 2023 5 - Year 3 Monitoring 10.00% 408.850 2024 6 - Year 4 Monitoring 5.00% 204.425 2025 7 - Year 5 Monitoring 10.00% 408.850 2026 8 - Year 6 Monitoring 5.00% 204.425 2027 9 - Year 7 Monitoring 10.00% 408.850 2028 Stream Bankfull Standard 10.00% 408.850 2025 Totals 1,226.550 Total Gross Credits 4,088.500 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,226.550 Total Percentage Released 30.00% Remaining Unreleased Credits 2,861.950 Credit Release Milestone Riparian Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1.037 1.037 0.000 1.037 2021 7/20/2021 3 - Year 1 Monitoring 10.00% 0.346 2022 4 - Year 2 Monitoring 10.00% 0.346 2023 5 - Year 3 Monitoring 15.00% 0.519 2024 6 - Year 4 Monitoring 5.00% 0.173 2025 7 - Year 5 Monitoring 15.00% 0.519 2026 8 - Year 6 Monitoring 5.00% 0.173 2027 9 - Year 7 Monitoring 10.00% 0.346 2028 Stream Bankfull Standard N/A N/A N/A N/A N/A N/A N/A Totals 1.037 Total Gross Credits 3.458 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1.037 Page 1 of 2 Mitigation Project Name DMS ID River Basin Cataloging Unit County Notes Contingencies (if any) Project Quantities Buffalo Creek Tributaries Mitigation Project 100042 Neuse 03020201 Johnston USACE Action ID 2018-00425 DWR Permit 2018-0199 Date Project Instituted 1/11/2018 Date Prepared 7/20/2021 Stream/Wet. Service Area Neuse 03020201 Total Percentage Released 29.99% Remaining Unreleased Credits 2.421 Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 3,168.000 Warm Stream Enhancement I 1,296.000 Warm Stream Preservation 565.000 Riparian Restoration 3.420 Riparian Enhancement 0.075 Debits Warm Stream Restoration Credits Warm Stream Restoration Equivalent Credits Riparian Restoration Credits Riparian Restoration Equivalent Credits Beginning Balance (mitigation credits) 4,032.000 56.500 3.420 0.038 Released Credits 1,209.600 16.950 1.026 0.011 Unrealized Credits 0.000 0.000 0.000 0.000 Converted Credits 0.000 0.000 0.000 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 1,209.600 16.950 1.026 0.011 Remaining Balance (Unreleased credits) 2,822.400 39.550 2.394 0.027 Total Remaining Balance (Released and Unreleased credits) 4,032.000 56.500 3.420 0.038 Page 2 of 2