HomeMy WebLinkAbout20180198 Ver 1_As-Built Review_20210809Strickland, Bev
From: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>
Sent: Monday, August 9, 2021 10:33 AM
To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B; Merritt, Katie;
Wilson, Travis W.; Bowers, Todd; Twyla Cheatwood - NOAA Federal
(twyla.cheatwood@noaa.gov); kathryn_matthews@fws.gov
Cc: Crocker, Lindsay; Dow, Jeremiah J; Baumgartner, Tim; Jason Larch; Stanfill, Jim;
Harmon, Beth; Gibby, Jean B CIV USARMY CESAW (USA); Crumbley, Tyler A CIV
USARMY CESAW (USA); Hopper, Christopher D CIV (USA); Haywood, Casey M CIV
(USA)
Subject: [External] NCDMS As -Built Review / Sassarixa Swamp / SAW-2018-00432 / Johnston
Co.
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good morning IRT,
The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section
332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT
review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day
comment deadline shown below. When providing comments please indicate if your concerns are great enough that you
recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may
not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
15-Day Comment Start Date: August 09, 2021
15-Day Comment Deadline: August 24, 2021
45-Day Credit Release Approval Deadline: September 23, 2021
Project information and location of the FINAL As -Built Baseline Monitoring Report (MY0):
Project Information:
Name: Sassarixa Swamp
USACE Action ID: SAW-2018-00432
NCDWR ID: 20180198
DMS Project : 100040
RFP: 16-007279—Issued 6/21/2017
Institution: 1/10/2018—Full Delivery
River Basin: Neuse 03020201
County: Johnston
Mitigation Plan Assets: 8,618.650 SMUs (Warm)
Riparian Buffer: 1,098,146.503 BMU and (updated from Mitigation Plan 1,080,282.590)
1
Provider:
DMS PM:
Wildlands Engineering, Inc., Jason Lorch, 919-851-9986
Jeremiah Dow, 919-218-0226
Please note:
Earthwork was completed December 22, 2020 and planting was completed March 16, 2021. 2021 will be Monitoring
Year 1 for this project. Deviations from the construction plan are shown in Section 2 of the report. The as -built stream
length is —79 linear feet more than the centerline design length. No change in project stream credits is requested.
The final baseline (as -built) report, record drawings, and drone pictures were uploaded to the DMS/IRT SharePoint, and
DWR Laserfiche for IRT review. A separate riparian buffer report was submitted via Laserfiche to Katie Merritt.
https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx
A drone video of the site is available here: https://www.youtube.com/watch?v=VuNSxNgZQUU
RIBITS:
https://ribits.ops.usace.army.mil/ords/f?p=107:278:16007249390979::NO::P278 BANK ID:5440
Please reach out to the mitigation team if you have questions.