Loading...
HomeMy WebLinkAbout20180198 Ver 1_As-Built Review_20210809Strickland, Bev From: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil> Sent: Monday, August 9, 2021 10:33 AM To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B; Merritt, Katie; Wilson, Travis W.; Bowers, Todd; Twyla Cheatwood - NOAA Federal (twyla.cheatwood@noaa.gov); kathryn_matthews@fws.gov Cc: Crocker, Lindsay; Dow, Jeremiah J; Baumgartner, Tim; Jason Larch; Stanfill, Jim; Harmon, Beth; Gibby, Jean B CIV USARMY CESAW (USA); Crumbley, Tyler A CIV USARMY CESAW (USA); Hopper, Christopher D CIV (USA); Haywood, Casey M CIV (USA) Subject: [External] NCDMS As -Built Review / Sassarixa Swamp / SAW-2018-00432 / Johnston Co. Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning IRT, The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: August 09, 2021 15-Day Comment Deadline: August 24, 2021 45-Day Credit Release Approval Deadline: September 23, 2021 Project information and location of the FINAL As -Built Baseline Monitoring Report (MY0): Project Information: Name: Sassarixa Swamp USACE Action ID: SAW-2018-00432 NCDWR ID: 20180198 DMS Project : 100040 RFP: 16-007279—Issued 6/21/2017 Institution: 1/10/2018—Full Delivery River Basin: Neuse 03020201 County: Johnston Mitigation Plan Assets: 8,618.650 SMUs (Warm) Riparian Buffer: 1,098,146.503 BMU and (updated from Mitigation Plan 1,080,282.590) 1 Provider: DMS PM: Wildlands Engineering, Inc., Jason Lorch, 919-851-9986 Jeremiah Dow, 919-218-0226 Please note: Earthwork was completed December 22, 2020 and planting was completed March 16, 2021. 2021 will be Monitoring Year 1 for this project. Deviations from the construction plan are shown in Section 2 of the report. The as -built stream length is —79 linear feet more than the centerline design length. No change in project stream credits is requested. The final baseline (as -built) report, record drawings, and drone pictures were uploaded to the DMS/IRT SharePoint, and DWR Laserfiche for IRT review. A separate riparian buffer report was submitted via Laserfiche to Katie Merritt. https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx A drone video of the site is available here: https://www.youtube.com/watch?v=VuNSxNgZQUU RIBITS: https://ribits.ops.usace.army.mil/ords/f?p=107:278:16007249390979::NO::P278 BANK ID:5440 Please reach out to the mitigation team if you have questions. Have a great week, Casey Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers BUILDING STRONG 2