Loading...
HomeMy WebLinkAbout20180198 Ver 1_Notice of Initial Credit Release_20210827Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Friday, August 27, 2021 9:02 AM To: Dow, Jeremiah J; Jason Lorch Cc: Crocker, Lindsay; Baumgartner, Tim; Harmon, Beth; Stanfill, Jim; Tugwell, Todd J CIV USARMY CESAW (US); Haywood, Casey M CIV (USA); Davis, Erin B; Merritt, Katie; Wilson, Travis W.; kathryn_matthews@fws.gov; Matthews, Monte K CIV USARMY CESAW (USA); Crumbley, Tyler A CIV USARMY CESAW (USA); Gibby, Jean B CIV USARMY CESAW (USA) Subject: [External] Notice of Initial Credit Release/ NCDMS Sassarixa Swamp/ SAW-2018-00432/ Johnston County Attachments: Sassarixa Swamp_100040_NS 01_STR_Initial Release KB.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good Morning all, The 15-Day Record Drawing review for the Sassarixa Swamp Mitigation Site (SAW-2018-00432) ended August 24, 2021. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. All comments received from the NCIRT are incorporated in the email below. Please address IRT concerns in the MY1 Report and provide a response to comments. The IRT would like to visit this site in 2022. There were no objections to issuing the initial 30% credit release of 2,585.595 warm SMUs. Please find attached the current signed ledger. USACE Comments, Kim Browning: 1. Table 1: T1 R4, T1A, T1B and T1C are listed as Ell at 2.5:1 and part of the rationale for this ratio was livestock exclusion and understory planting. Were these areas planted? If so, with what species? The IRT agreed to a 4:1 ratio during the draft mitigation plan review but ultimately accepted 2.5:1 based on increasing understory diversity and livestock exclusion. 2. The final mitigation plan planting list included 10% cherry bark oak in the floodplain and wetland planting zone. This is not listed in the MVO report; which species were increased as a substitution? 3. In future monitoring reports it would be helpful to include planted stem percentages in Table 6. 4. Please include photo points of all crossings in future monitoring reports. 5. Sediment is observed in the channel in several sections of T2 in the photos and on the video. Do you anticipate that this will be flushed out of the system and form more defined channel features? The area where the pond was removed appears to be trending towards developing wetland features. 6. Please verify that a flow gauge was installed on T3. I was able to spot the gauge on T2 in the photos but photo point 24 didn't capture the gauge. 7. Is the large amount of rock observed in the video at the upper end of T2 the BMP shown on Sheet 1.25? I noted that the PCN included impacts for grading wetland GG, but the design sheets show the BMP in the wetland, which would be considered a permanent impact. Treatment features should not be placed in jurisdictional features. 1 8. In future monitoring reports please provide an estimate of how many of the mature trees that were still present after construction have died. I'm curious about the effects of construction equipment and tree survival. 9. A lot of mature pine was noted in the video that will serve as a seed source in the buffer. Please explain how this will be addressed if pine volunteers dominate the site. 10. Was there only one random veg plot? I'd like to request one be located along T5 near cross section 8 DRW Comments, Erin Davis: 1. DWR appreciated the discussion of the storm damage and Old Olive Road sediment source during construction. It was important to have that context given what was shown in the photos, video and restoration profile sheets. The excess sediment is concerning. Just a reminder that any channel maintenance activities should be proposed within the next two years, since the IRT wants to see the trajectory (stream/wetland) the credit features are trending through the second half of the monitoring period. 2. It was noted that sections of T2 and Sassarixa Creek Reach 2 were stable and didn't require construction of approved design structures. Since these areas were in backwater during construction, how was stream stability assessed? Do these areas still appear stable under summer baseflow conditions? 3. Sheet 1.25 shows two pipes, please confirm these structures were removed. 4. Sheet 5.9 has a note that an area was not fenced because of the swamp. Please confirm whether the terminal boundaries of T4 and T5 were fenced as shown. 5. Looking at the video, it appears there are mature pines present within and/or adjacent to the site. Has a pine management strategy been developed for the monitoring period? 6. Just to confirm, the video segment (9:30) of T2 is showing coir logs installed at the top of slope along the terrace? Please contact me with any questions. Have a good weekend, Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 2 Mitigation Project Name Sassarixa Swamp Mitigation Site USACE Action ID 2018-00432 DMS ID 100040 DWR Permit 2018-0198 River Basin Neuse Date Project Instituted 1/10/2018 Cataloging Unit 03020201 Date Prepared 8/3/2021 County Johnston Stream/Wet. Service Area Neuse 03020201 Kimberly Danielle Browning Digitally signed by Kimberly Danielle Browning Date: 2021.08.27 08:41:50 -04'00' Signature of Official Approving Credit Release 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases 0/0 Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 2,585.595 2,585.595 0.000 2,585.595 2021 8/3/2021 3 - Year 1 Monitoring 10.00% 861.865 2022 4 - Year 2 Monitoring 10.00% 861.865 2023 5 - Year 3 Monitoring 10.00% 861.865 2024 6 - Year 4 Monitoring 5.00% 430.932 2025 7 - Year 5 Monitoring 10.00% 861.865 2026 8 - Year 6 Monitoring 5.00% 430.932 2027 9 - Year 7 Monitoring 10.00% 861.865 2028 Stream Bankfull Standard 10.00% 861.865 2025 Totals 2,585.595 Total Gross Credits 8,618.650 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 2,585.595 Total Percentage Released 30.00% Remaining Unreleased Credits 6,033.055 Notes Contingencies (if any) Page 1 of 2 Mitigation Project Name DMS ID River Basin Cataloging Unit County Project Quantities Sassarixa Swamp Mitigation Site 100040 Neuse 03020201 Johnston USACE Action ID DWR Permit Date Project Instituted Date Prepared Stream/Wet. Service Area Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 4,662.000 Warm Stream Enhancement II 9,861.000 Warm Stream Preservation 1,570.000 2018-00432 2018-0198 1/10/2018 8/3/2021 Neuse 03020201 Debits Warm Stream Restoration Credits Warm Stream Restoration Equivalent Credits Beginning Balance (mitigation credits) 8,461.650 157.000 Released Credits 2,538.495 47.100 Unrealized Credits 0.000 0.000 Converted Credits 0.000 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 2,538.495 47.100 Remaining Balance (Unreleased credits) 5,923.155 109.900 Total Remaining Balance (Released and Unreleased credits) 8,461.650 157.000 Page 2 of 2