HomeMy WebLinkAbout20171041 Ver 1_Notice of As-Built & Plan Addendum Review_20210908Strickland, Bev
From: Browning, Kimberly D CIV USARMY CESAW (USA)
<Kimberly.D.Browning@usace.army.mil>
Sent: Wednesday, September 8, 2021 9:32 AM
To: Tugwell, Todd J CIV USARMY CESAW (US); Haywood, Casey M CIV (USA); Davis, Erin B;
Bowers, Todd; Wilson, Travis W.; Leslie, Andrea J; Youngman, Holland J
Cc: Crumbley, Tyler A CIV USARMY CESAW (USA); Jones, M Scott (Scott) CIV USARMY
CESAW (USA); Merritt, Katie
Subject: [External] Notice of As -Built & Plan Addendum Review/ NCDMS Little Sebastian
Mitigation Site/ SAW-2017-01507/ Surry County
Attachments: Little Sebastian_100027_MP Addendum_2021.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hello all,
The below referenced As -Built (MY0)/Record Drawing Report review has been requested by NCDMS. Per Section
332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT
review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day
comment deadline shown below. When providing comments please indicate if your concerns are great enough that you
intend to request a site visit prior to the initial credit release. Comments provided after the 15-day comment deadline
(shown below) may not be considered.
**As part of this review request, DMS is requesting IRT approval of a Mitigation Plan Addendum for an upward
adjustment of the project's stream assets (+19.660 Cool SMUs).
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
15-Day Comment Start Date: September 10, 2021
15-Day Comment Deadline: September 25, 2021
45-Day Credit Release Approval Deadline: October 25, 2021
*NOTE: If a site visit is requested by the IRT, comments are due 15 days after the site visit is complete.
Project information:
Little Sebastian Site
DMS Project # 100027
Yadkin River Basin
Cataloging Unit 03040101
Surry County, North Carolina
Mitigation Plan Project Credits:
4,554.300 SMUs (Cool)
1
As-Built-MY0 Project Credits:
4,573.960 SMUs (Cool)
Mitigation Plan Lengths/ Acreages:
8,068 linear ft.
As-Built-MY0 Lengths/ Acreages:
8,105 linear ft.
* + 37 linear feet associated with JN7, which includes revised buffer tool calculations.
Contact Information:
FD Provider: RES; Contact: Brad Breslow bbreslow@res.us <mailto:bbreslow@res.us> 847-774-8404
NCDEQ - DMS PM: Paul Wiesner, paul.wiesner@ncdenr.gov<mailto:paul.wiesner@ncdenr.gov>, 828-273-1673
USACE: Kim Browning Kimberly.d.browning@usace.army.mil 919-413-6392
IRT-DMS SharePoint Page:
https://ncconnect.sharepoint.com/sites/IRT-DMS <Blockedhttps://ncconnect.sharepoint.com/sites/IRT-DMS>
Little Sebastian 100027 MYO 2021
https://ncconnect.sharepoint.com/:b:/r/sites/IRT-
DMS/AsBuilt%20Report%20%20Drawing/Little%20Sebastian%20(100027)/Little%20Sebastian 100027 MY0 2021. pdf?c
sf=1&web=1&e=gcfVpx <Blockedhttps://ncconnect.sharepoint.com/:b:/r/sites/IRT-
DMS/AsBu i It% 20Report% 20% 20Drawi ng/Little % 20Sebastia n % 20(100027)/Little % 20Sebastia n_100027_MY0_2021. pdf?c
sf=1&web=1&e=gcfVpx>
Little Sebastian 100027 AB 2021
https://ncconnect.sharepoint.com/:b:/r/sites/IRT-
DMS/AsBuilt%20Report%20%20Drawing/Little%20Sebastian%20(100027)/Little%20Sebastian 100027 AB 2021.pdf?csf
=1&web=1&e=f7tBIW <Blockedhttps://ncconnect.sharepoint.com/:b:/r/sites/IRT-
DMS/AsBu i It% 20Report% 20% 20Drawi ng/Little % 20Sebastia n % 20(100027)/Little % 20Sebastia n_100027_AB_2021. pdf?csf
=1&web=1&e=f7tBIW>
Little Sebastian 100027 MP Addendum_2021
https://ncconnect.sharepoint.com/:b:/r/sites/IRT-
DMS/AsBuilt%20Report%20%20Drawing/Little%20Sebastian%20(100027)/Little%20Sebastian 100027 MP%20Addendu
m 2021.pdf?csf=1&web=1&e=QHtovm <Blockedhttps://ncconnect.sharepoint.com/:b:/r/sites/IRT-
DMS/AsBuilt%20Report%20%20Drawing/Little%20Sebastian%20(100027)/Little%20Sebastian_100027_MP%20Addendu
m_2021. pdf?csf=1&web=1&e=QHtovm>
Please contact me with any questions.
Regards,
Kim
2
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
fires
August 27, 2021
Mitigation Plan Addendum
Little Sebastian Mitigation Site
DMS Project ID # 100027
Contract # 7187
RFP 16-006993 (Issued 9/16/2016)
USACE Action ID: SAW-2017-01507
DWR Project # 2017-1041
Dear NC IRT,
3600 Glenwood Avenue, Suite 100
Raleigh, NC 27612
Corporate Headquarters
6575 W Loop S #300
Bellaire, TX 77401
Main: 713.520.5400
Through stream restoration, enhancement, and preservation, the Little Sebastian Site now
presents 4,573.960 Cool Stream Mitigation Units (SMU) at As -Built. An additional 19.66 SMU
were generated from the addition of JN7 between Final Mitigation Plan approval and construction.
RES and DMS are requesting a mitigation plan addendum for this inclusion.
Mitigation Plan assets: 4,554.3 SMUs
As -Built assets: 4,573.960 SMUs
JN7 is located east of JN3-B and has a 30-acre drainage area. Historically, this pond drained
directly through the dam into JN3-B but due to the relocation of JN3-B, a channel was constructed
in order to connect the pond about 150 linear feet to JN3-B's new location. The restored JN7
includes 37 linear feet within the easement with graded banks, livestakes, new bed material, and
a grade control structure where its confluence on the left bank of JN3-B. The USACE non-
standard buffer width calculation was re -done for the entire project to include reach JN7.
Additionally, RES proposes to add a cross section during MY1 to track the vertical and lateral
stability of this reach.
Attached is the updated USACE non-standard buffer width calculation spreadsheet and map,
credit table and a photograph of the constructed JN7.
Sincerely,
Frv<—/46-eke'
Ryan Medric I Project Manager
res.us
JN7 looking upstream (01/21/2021).
Table 1. Little Sebastian (ID-100027) - Mitigation Assets and Components
Project Segment
JN2-A
Existing
Footage or
Acreage
418
Mitigation
Plan
Footage or
Acreage
418
Migitation
Category
Cool
Restoration
Level
P
Priority Level
NA
Mitigation
Ratio (X:1)
10.00000
Mitigation
Plan Credits
41.800
As -Built
Footage or
Acreage
418
Comments
Livestock exclusion
JN2-B
187
187
Cool
El
NA
1.50000
124.667
187
Buffer planting and livestock exclusion
JN2-C
307
307
Cool
Ell
NA
2.50000
122.800
307
Buffer planting and livestock exclusion; 31-foot crossing
JN2-C
837
837
Cool
Ell
NA
2.50000
334.800
837
Buffer planting and livestock exclusion
JN2-D
39
43
Cool
El
NA
1.50000
28.667
43
Channel relocation, bed and bank stabilization, crossing relocation, buffer plantings,
and livestock exclusion; 62-foot crossing
JN2-D
150
153
Cool
El
NA
1.50000
102.000
153
Channel relocation, bed and bank stabilization, crossing relocation, buffer plantings,
and livestock exclusion
JN3-A
350
350
Cool
Ell
NA
7.50000
46.667
350
Buffer planting and livestock exclusion
JN3-B
900
781
Cool
R
1.00000
781.000
781
Channel relocation in the natural valley, improved stream structures, buffer planting,
and livestock exclusion; 43-foot crossing
JN3-B
224
262
Cool
R
I
1.00000
262.000
262
Channel relocation, bed and bank stabilization, crossing relocation, buffer plantings,
and livestock exclusion
JN7*
0
0
Cool
R
I
1.00000
0.000
37
Channel construction, bed and bank stabilization, buffer plantings, and livestock
exclusion
MC1-A
469
469
Cool
Ell
NA
7.50000
62.533
469
Buffer planting and livestock exclusion
MC1-B
717
717
Cool
Ell
NA
5.00000
143.400
717
Buffer planting and livestock exclusion; 41-foot utility line crossing
MC1-B
260
260
Cool
Ell
NA
5.00000
52.000
260
Buffer planting and livestock exclusion
MC1-C
545
555
Cool
R
I
1.00000
555.000
555
Channel bed raised, improved stream structures, buffer planting, and livestock
exclusion
MC3-A
243
243
Cool
Ell
NA
10.00000
24.300
243
Buffer planting and livestock exclusion
MC3-B
402
402
Cool
Ell
NA
2.50000
160.800
402
Buffer planting and livestock exclusion; 41-foot crossing
MC3-C
214
214
Cool
El
NA
1.50000
142.667
214
Bank stabilization, improved stream structures, buffer planting, and livestock exclusion
MC3-D
395
395
Cool
Ell
NA
5.00000
79.000
395
Buffer planting and livestock exclusion
BS1-A
205
214
Cool
R
1.00000
214.000
214
Channel bed raised, improved stream structures, buffer planting, and livestock
exclusion
BS1-B
190
175
Cool
Ell
NA
2.50000
70.000
175
Buffer planting and livestock exclusion
BS1-C
580
541
Cool
R
1.00000
541.000
541
Channel bed raised, improved stream structures, buffer planting, and livestock
exclusion
BS1-D
185
177
Cool
Ell
NA
2.50000
70.800
177
Buffer planting and livestock exclusion
BS1-E
278
274
Cool
R
1.00000
274.000
274
Channel bed raised, improved stream structures, buffer planting, and livestock
exclusion; 45-foot crossing
BS1-E
94
94
Cool
R
1.00000
94.000
94
Channel bed raised, improved stream structures, buffer planting, and livestock
exclusion
*Added between Final Mi gation Plan a d Construction
Note: all crossings and utility easement have been removed from credit calculations.
Project Credits
Restoration Level
Stream
Riparian
Wetland
Non -rip
Wetland
Coastal
Marsh
Warm
Cool
Cold
Restoration
2758.000
Re-establishment
Rehabilitation
Enhancement
Enhancement I
398.000
Enhancement II
1167.100
Creation
Preservation
41. 800
NSBW
TOTALS
209.060
4,573.960
Site Name:
USACE Action ID:
NCDWR Project Number:
Sponsor:
County:
Minimum Required Buffer Width':
Mitigation Type
Restoration (1:1)
Enhancement I (1.5:1)
Enhancement II (2.5:1)
Preservation (5:1)
Other (7.5:1)
Other (10:1)
Custom Ratio 1
Custom Ratio 2
Custom Ratio 3
Custom Ratio 4
Custom Ratio 5
Totals
Buffer Zones
Max Possible Buffer (square feet)°
Ideal Buffer (square feet)'
Actual Buffer (square feet)'
Zone Multiplier
Buffer Credit Equivalent
Percent of Ideal Buffer
Credit Adjustment
Total Baseline Credit
4364.90
Wilmington District Stream Buffer Credit Calculator
Little Sebastian
SAW-2017-01507
100027
RES
Surry
30
Mitigation Ratio
Multiplier'
1
1.5
2.5
5
7.5
10
Creditable Stream
Length'
2758
597
1898
819
661
5
1372
8105.00
Baseline Stream Credit
2758.00
398.00
759.20
109.20
66.10
274.40
4364.90
Buffer Width Zone (feet from Ordinary High Water Mark)
less than 15 feet
>15 to 20 feet
>20 to 25 feet
>25 to 30 feet
>30 to 50 feet
>50 to 75 feet
>75 to 100 feet
>100 to 125 feet
>125 to 150 feet
243150
81050
81050
81050
324200
405250
405250
405250
405250
251259.9716
84945.83404
84268.48997
83968.47859
332661.3116
409998.3053
410938.5896
412888.522
416141.4754
238911.5981
78050.00744
77059.85783
75986.66786
263024.2205
181861.5253
71359.96571
22068.53352
6840.761415
50%
20%
15%
15%
9%
7%
6%
5%
3%
2182.45
872.98
654.74
654.74
392.84
305.54
261.89
218.25
130.95
95%
92%
91%
90%
79%
44%
17%
5%
2%
-107.26
-70.87
-56.01
-62.24
310.61
135.53
45.48
11.67
2.15
Credit Loss in Required Credit Gain for Net Change in
Buffer Additional Buffer Credit from Buffers
-296.37 505.43 209.06
Total Credit
4573.96
'Minimum standard buffer width measured from the top of bank (50 feet in piedmont and coastal plain counties or 30 feet in mountain counties)
'Use the Custom Ratio fields to enter non-standard ratios, which are equal to the number of feet in the feet -to -credit mitigation ratio (e.g., for a perservation ratio of 8 feet to 1 credit, the multiplier would be 8
'Equal to the number of feet of stream in each Mitigation Type. If stream reaches are not creditable, they should be excluded from this measurement, even if they fall within the easement
°This amount is the maximum buffer area possible based on the linear footage of stream length if channel were perfectly straight with full buffer width. This number is not used in calculations, but is provided as a reference.
'Maximum potential size (in square feet) of each buffer zone measured around all creditable stream reaches, calculated using GIS, including areas outside of the easement. The inner zone (0-15') should be measured from the top of the OHWM or the edge of the average stream width if OHWM is not known. Non -creditable stream
reaches within the easement should be removed prior to calculating this area wtih GIS.
'Square feet in each buffer zone, as measured by GIS, excluding non -forested areas, all other credit type (e.g., wetland, nutrient offset, buffer), easement exceptions, open water, areas failing to meet the vegetation performance standard, etc. Additional credit is given to 150 feet in buffer width, so areas within the easement that
are more than 150 feet from creditable streams should not be included in this measurement. Non -creditable stream reaches within the easement should be removed prior to calculating this area wtih GIS
eth: ItIliesgisbrAgisTr
fires
W E
0 62.5 125
Feet
Figure 3 -Stream
Buffer Credit Adjustment
Sheet A
Little Sebastian
Mitigation Site
Surry County,
North Carolina
Date: 8/13/2021
Checked by: RTM
Drawn by: MDE
1 in = 125 feet
Legend
Conservation Easement
Gideon Mitigation Project
Top of Bank
Buffer Width Zone
ip
0-15 ft
16-20 ft
21-25 ft
26-30 ft
31-50 ft
51-75 ft
76-100 ft
101-125 ft
126-150 ft
ores
N
s
0 62.5 125
Feet
Figure 3 -Stream
Buffer Credit Adjustment
Sheet B
Little Sebastian
Mitigation Site
Surry County,
North Carolina
Date: 8/13/2021
Drawn by: MDE
Checked by: RTM
1 in = 125 feet
Legend
Conservation Easement
Gideon Mitigation Project
441 Top of Bank
Buffer Width Zone
•
0-15 ft
16-20 ft
21-25 ft
26-30 ft
31-50 ft
51-75 ft
76-100 ft
101-125 ft
126-150 ft
•
I
• •
ores
N
s
0 62.5 125
Feet
Figure 3 -Stream
Buffer Credit Adjustment
Sheet C
Little Sebastian
Mitigation Site
Surry County,
North Carolina
Date: 8/13/2021
Checked by: RTM
Drawn by: MDE
1 in = 125 feet
Legend
Conservation Easement
Gideon Mitigation Project
1141 Top of Bank
Buffer Width Zone
•
0-15 ft
16-20 ft
21-25 ft
26-30 ft
31-50 ft
51-75 ft
76-100 ft
101-125 ft
126-150 ft
fires
N
s
0 62.5 125
Feet
Figure 3 -Stream
Buffer Credit Adjustment
Sheet D
Little Sebastian
Mitigation Site
Surry County,
North Carolina
Date: 8/13/2021
Checked by: RTM
Drawn by: MDE
1 in = 125 feet
Legend
Conservation Easement
Gideon Mitigation Project
MI Top of Bank
Buffer Width Zone
•
0-15 ft
16-20 ft
21-25 ft
26-30 ft
31-50 ft
51-75 ft
76-100 ft
101-125 ft
126-150 ft
I
Ideal Buffers ar4r...4
Ores
W +—E
0 62.5 125
Feet
Figure 3 -Stream
Buffer Credit Adjustment
Sheet E
Little Sebastian
Mitigation Site
Surry County,
North Carolina
Date: 8/13/2021
Checked by: RTM
Drawn by: MDE
1 in = 125 feet
Legend
Conservation Easement
Gideon Mitigation Project
Top of Bank
Buffer Width Zone
0-15 ft
16-20 ft
21-25 ft
26-30 ft
31-50 ft
51-75 ft
76-100 ft
101-125 ft
126-150 ft
Documnt Path: IIMIGsgis,ntgis,Proje.,IORR8R Catawba OR 03 ES.NIX0,7 Lan,F.ersTigure - Buffer Ptljusimeni rwal
Ores
W E
0 62.5 125
Feet
Figure 3 -Stream
Buffer Credit Adjustment
Sheet F
Little Sebastian
Mitigation Site
Surry County,
North Carolina
Date: 8/13/2021
Checked by: RTM
Drawn by: MDE
1 in = 125 feet
Legend
Conservation Easement
Gideon Mitigation Project
Top of Bank
Buffer Width Zone
0-15 ft
16-20 ft
21-25 ft
26-30 ft
31-50 ft
51-75 ft
76-100 ft
101-125 ft
126-150 ft
No Credit loss in the Minimum Buffer Zone
Gideon and Little Sebastian Easement
are contiguous in this location
fires
N
s
0 62.5 125
Feet
Figure 3 -Stream
Buffer Credit Adjustment
Sheet G
Little Sebastian
Mitigation Site
Surry County,
North Carolina
Date: 8/13/2021
Checked by: RTM
Drawn by: MDE
1 in = 125 feet
Legend
Conservation Easement
Gideon Mitigation Project
Top of Bank
Buffer Width Zone
0-15 ft
16-20 ft
21-25 ft
26-30 ft
31-50 ft
51-75 ft
76-100 ft
101-125 ft
126-150 ft
Actual Buffer'
fires
N
s
0 62.5 125
Feet
Figure 3 -Stream
Buffer Credit Adjustment
Sheet H
Little Sebastian
Mitigation Site
Surry County,
North Carolina
Date: 8/13/2021
Checked by: RTM
Drawn by: MDE
1 in = 125 feet
Legend
Conservation Easement
Gideon Mitigation Project
1141 Top of Bank
Buffer Width Zone
0-15 ft
16-20 ft
21-25 ft
26-30 ft
31-50 ft
51-75 ft
76-100 ft
101-125 ft
126-150 ft
Document Path 11.esgis.ntgis,rojects,ORR8R Catawba OR 03 ESMMX0,7 LandT.ersTigure 3 -Buffer AdjusMent rmd
Ores
W +—E
0 62.5 125
Feet
Figure 3 -Stream
Buffer Credit Adjustment
Sheet I
Little Sebastian
Mitigation Site
Surry County,
North Carolina
Date: 8/13/2021
Checked by: RTM
Drawn by: MDE
1 in = 125 feet
Legend
Conservation Easement
Gideon Mitigation Project
Top of Bank
Buffer Width Zone
0-15 ft
16-20 ft
21-25 ft
26-30 ft
31-50 ft
51-75 ft
76-100 ft
101-125 ft
126-150 ft