Loading...
HomeMy WebLinkAbout20181274 Ver 1_Year 0 As-Built Baseline Montoring Report_20210913Strickland, Bev From: Wiesner, Paul Sent: Monday, September 13, 2021 3:15 PM To: Haywood, Casey M CIV (USA); Davis, Erin B; Kim Browning; Tugwell, Todd J CIV USARMY CESAW (US) Cc: Phillips, Kelly D; Jeff Keaton; Shawn Wilkerson; Allen, Melanie; Stanfill, Jim; Harmon, Beth Subject: IRT Review Request: As -Built Baseline Monitoring Report (MYO) — Lyon Hills Mitigation Site (DMS#100085) - (SAW-2018-01784) (DWR#20181274) - Yadkin 03040101 Attachments: Lyon Hills_100085_YD 101_STR_Initial Release.pdf Follow Up Flag: Follow up Flag Status: Flagged Casey, Erin, Kim and Todd; The FINAL As -Built Baseline Monitoring Report and Record Drawings for the Lyon Hills Mitigation Project (DMS# 100085) were posted to the IRT SharePoint site and DWR Laserfiche on September 1, 2021 for your review. 2021 will be Monitoring Year 1 for this project. The credit ledger for the 30% release is attached for your review. Project information and location of the FINAL As -Built Baseline Monitoring Report (MY0): Project Information: Lyon Hills Mitigation Site DMS Project # 100085 RFP: 16-007406 — Issued 12/7/2017 Institution Date: 06/22/2018 — Full Delivery Yadkin River Basin Cataloging Unit 03040101 Wilkes County, North Carolina Proposed Mitigation Plan Assets: 5,304.783 SMUs (cool) As -Built MYO Project Credits: 5,304.783 SMUs (cool) Mitigation Plan Lengths/ Acreages: 9,515.000 linear ft. As-Built-MY0 Lengths/ Acreages: 9,420.000 linear ft. Please note: Stream construction and planting were complete in March 2021. No significant field adjustments were made during construction that differ from the design plans. Minimal adjustments were made during construction, where needed, based on field evaluation and are listed in Section 5.1 of the MYO report. No deviations were made to the planting list. 1 FD Provider: Wildlands Engineering Inc.; Contact: Jeff Keaton Jeff Keaton ikeaton@wildlandseng.com, Tel. 919-851-9986 (office), 919-302-6919 (cell) NCDEQ- DMS PM: Kelly Phillips, kelly.phillips@ncdenr.gov, 919-723-7565 The Final As -Built Baseline Monitoring Report (MVO) and Record Drawings can be accessed directly on the DMS SharePoint site here: IRT-DMS SharePoint Page: https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx Lyon H i l ls_100085_MY0_2021. pdf https://ncconnect.sharepoint.com/:b:/r/sites/IRT- DMS/AsBuilt%20Report%20%20Drawing/Lyon%20Hills/Lyon%20Hills%20 100085 MY0 2021.pdf?csf=1&web=1&e=KQc gTJ Lyon Hills _100085_AB_2021 https://ncconnect.sharepoint.com/:b:/r/sites/IRT- DMS/AsBuilt%20Report%20%20Drawing/Lyon%20Hills/Lyon%20Hills%20 100085 AB 2021.pdf?csf=1&web=1&e=SbyV Please let me know if you have questions or call to discuss. Thanks Paul Wiesner Western Regional Supervisor North Carolina Department of Environmental Quality Division of Mitigation Services 828-273-1673 Mobile paul.wiesner©ncdenr.gov Western DMS Field Office 5 Ravenscroft Drive Suite 102 Asheville, N.C. 28801 D Q Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 2 Mitigation Project Name Lyon Hills Mitigation Site USACE Action ID 2018-01784 DMS ID 100085 DWR Permit 2018-1274 River Basin Yadkin Date Project Instituted 6/22/2018 Cataloging Unit 03040101 Date Prepared 9/7/2021 County Wilkes Stream/Wet. Service Area Yadkin 03040101 Signature of Official Approving Credit Release 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Cool Stream Credits Project Credits Scheduled Releases 0/0Scheduled Estimated Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1,591.435 1,591.435 0.000 1,591.435 2021 9/1/2021 3 - Year 1 Monitoring 10.00% 530.478 2022 4 - Year 2 Monitoring 10.00% 530.478 2023 5 - Year 3 Monitoring 10.00% 530.478 2024 6 - Year 4 Monitoring 5.00% 265.240 2025 7 - Year 5 Monitoring 10.00% 530.478 2026 8 - Year 6 Monitoring 5.00% 265.240 2027 9 - Year 7 Monitoring 10.00% 530.478 2028 Stream Bankfull Standard 10.00% 530.478 2025 Totals 1,591.435 Total Gross Credits 5,304.783 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,591.435 Total Percentage Released 30.00% Remaining Unreleased Credits 3,713.348 Notes 9/1/2021: Stream credits from this project can be utilized to satisfy cool or warm stream requirements. Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Cool Stream Restoration 2,807.000 Cool Stream Enhancement I 581.000 Cool Stream Enhancement II 5,608.000 Page 1 of 2 Mitigation Project Name Lyon Hills Mitigation Site DMS ID 100085 River Basin Yadkin Cataloging Unit 03040101 County Wilkes USACE Action ID DWR Permit Date Project Instituted Date Prepared Stream/Wet. Service Area 2018-01784 2018-1274 6/22/2018 9/7/2021 Yadkin 03040101 Cool Stream Debits Restoration Credits Beginning Balance (mitigation credits) 5,304.783 Released Credits 1,591.435 Unrealized Credits 0.000 Converted Credits 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 1,591.435 Remaining Balance (Unreleased credits) 3,713.348 Total Remaining Balance (Released and Unreleased credits) 5,304.783 Page 2 of 2