HomeMy WebLinkAbout20181274 Ver 1_Notice of As-Built Review_20210915Strickland, Bev
From: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>
Sent: Wednesday, September 15, 2021 3:48 PM
To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B;
holland_youngman@fws.gov; Bowers, Todd; Wilson, Travis W.; Leslie, Andrea J
Cc: Wiesner, Paul; Phillips, Kelly D; Jeff Keaton; Shawn Wilkerson; Allen, Melanie; Stanfill,
Jim; Harmon, Beth; Lastinger, James C CIV USARMY CESAW (USA); Boggs, Brandee C
CIV USARMY CESAD (USA); Jones, M Scott (Scott) CIV USARMY CESAW (USA);
Haywood, Casey M CIV (USA)
Subject: [External] Notice of NCDMS As -Built Review / Lyon Hills / SAW-2018-01784 / Wilkes
Co.
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good afternoon IRT,
The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section
332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT
review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day
comment deadline shown below. When providing comments please indicate if your concerns are great enough that you
recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may
not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
15-Day Comment Start Date: September 15, 2021
15-Day Comment Deadline: September 30, 2021
45-Day Credit Release Approval Deadline: October 30, 2021
Project information and location of the FINAL As -Built Baseline Monitoring Report (MY0):
Project Information:
Lyon Hills Mitigation Site
DMS Project # 100085
SAW-2018-01784
DWR # 2018-1274
RFP: 16-007406 — Issued 12/7/2017
Institution Date: 06/22/2018 — Full Delivery
Yadkin River Basin
Cataloging Unit 03040101
Wilkes County, North Carolina
Proposed Mitigation Plan Assets:
5,304.783 SMUs (cool)
1
As -Built MYO Project Credits:
5,304.783 SMUs (cool)
Mitigation Plan Lengths/ Acreages:
9,515.000 linear ft.
As-Built-MY0 Lengths/ Acreages:
9,420.000 linear ft.
Please note:
Stream construction and planting were complete in March 2021. No significant field adjustments were made during
construction that differ from the design plans. Minimal adjustments were made during construction, where needed,
based on field evaluation and are listed in Section 5.1 of the MYO report. No deviations were made to the planting list.
FD Provider: Wildlands Engineering Inc.; Contact: Jeff Keaton Jeff Keaton jkeaton@wildlandseng.com, Tel. 919-851-9986
(office), 919-302-6919 (cell)
NCDEQ- DMS PM: Kelly Phillips, kelly.phillips@ncdenr.gov, 919-723-7565
The Final As -Built Baseline Monitoring Report (MYO) and Record Drawings can be accessed directly on the DMS
SharePoint site here:
IRT-DMS SharePoint Page:
https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx
Lyon H i l ls_100085_MY0_2021. pdf
https://ncconnect.sharepoint.com/:b:/r/sites/IRT-
DMS/AsBuilt%20Report%20%20Drawing/Lyon%20Hills/Lyon%20Hills%20 100085 MY0 2021.pdf?csf=1&web=1&e=KQc
gTJ
Lyon Hills _100085_AB_2021
https://ncconnect.sharepoint.com/:b:/r/sites/IRT-
DMS/AsBuilt%20Report%20%20Drawing/Lyon%20Hills/Lyon%20Hills%20 100085 AB 2021.pdf?csf=1&web=1&e=SbyV
RIBITS:
https://ribits.ops.usace.army.mil/ords/f?p=107:278:27339500096910::::P278 BANK ID:5172
Thanks,
Casey
Casey Haywood
Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers
BUILDING STRONG ®
2