Loading...
HomeMy WebLinkAbout20181274 Ver 1_Notice of As-Built Review_20210915Strickland, Bev From: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil> Sent: Wednesday, September 15, 2021 3:48 PM To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B; holland_youngman@fws.gov; Bowers, Todd; Wilson, Travis W.; Leslie, Andrea J Cc: Wiesner, Paul; Phillips, Kelly D; Jeff Keaton; Shawn Wilkerson; Allen, Melanie; Stanfill, Jim; Harmon, Beth; Lastinger, James C CIV USARMY CESAW (USA); Boggs, Brandee C CIV USARMY CESAD (USA); Jones, M Scott (Scott) CIV USARMY CESAW (USA); Haywood, Casey M CIV (USA) Subject: [External] Notice of NCDMS As -Built Review / Lyon Hills / SAW-2018-01784 / Wilkes Co. Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon IRT, The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: September 15, 2021 15-Day Comment Deadline: September 30, 2021 45-Day Credit Release Approval Deadline: October 30, 2021 Project information and location of the FINAL As -Built Baseline Monitoring Report (MY0): Project Information: Lyon Hills Mitigation Site DMS Project # 100085 SAW-2018-01784 DWR # 2018-1274 RFP: 16-007406 — Issued 12/7/2017 Institution Date: 06/22/2018 — Full Delivery Yadkin River Basin Cataloging Unit 03040101 Wilkes County, North Carolina Proposed Mitigation Plan Assets: 5,304.783 SMUs (cool) 1 As -Built MYO Project Credits: 5,304.783 SMUs (cool) Mitigation Plan Lengths/ Acreages: 9,515.000 linear ft. As-Built-MY0 Lengths/ Acreages: 9,420.000 linear ft. Please note: Stream construction and planting were complete in March 2021. No significant field adjustments were made during construction that differ from the design plans. Minimal adjustments were made during construction, where needed, based on field evaluation and are listed in Section 5.1 of the MYO report. No deviations were made to the planting list. FD Provider: Wildlands Engineering Inc.; Contact: Jeff Keaton Jeff Keaton jkeaton@wildlandseng.com, Tel. 919-851-9986 (office), 919-302-6919 (cell) NCDEQ- DMS PM: Kelly Phillips, kelly.phillips@ncdenr.gov, 919-723-7565 The Final As -Built Baseline Monitoring Report (MYO) and Record Drawings can be accessed directly on the DMS SharePoint site here: IRT-DMS SharePoint Page: https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx Lyon H i l ls_100085_MY0_2021. pdf https://ncconnect.sharepoint.com/:b:/r/sites/IRT- DMS/AsBuilt%20Report%20%20Drawing/Lyon%20Hills/Lyon%20Hills%20 100085 MY0 2021.pdf?csf=1&web=1&e=KQc gTJ Lyon Hills _100085_AB_2021 https://ncconnect.sharepoint.com/:b:/r/sites/IRT- DMS/AsBuilt%20Report%20%20Drawing/Lyon%20Hills/Lyon%20Hills%20 100085 AB 2021.pdf?csf=1&web=1&e=SbyV RIBITS: https://ribits.ops.usace.army.mil/ords/f?p=107:278:27339500096910::::P278 BANK ID:5172 Thanks, Casey Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers BUILDING STRONG ® 2