Loading...
HomeMy WebLinkAbout20130846 Ver 1_Minor Variance_20130809�/� 20130848 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Thomas A Reeder John Skvada Governor Aging Director Seaetary Variance Request Form (For Minor and Major Variances) Protection and Maintenance of Riparian Areas Rules FFA y p -- -� ___, �� NOTE: This form may be photocopied for use as an original. G - 9 2013 Check the appropriate box below: Major Variance Minor Variance Please identify which Riparian Area Protection Rule applies (Now4us must be one of North Carolina's four buffered river basins. The River Bain map is available at htt :// h2o .enr.state.nc.us/admin/maps/.) U' Neuse River Basin: Nutrient Sensitive Waters Management Strategy Protection and Maintenance of Riparian Areas Rule (15A NCAC 02BA233) v Tar - Pamlico River Basin: Nutrient Sensitive Waters Management Strategy Protection and Maintenance of Riparian Areas Rule (15A NCAC O2B.O259) Part l: General Information (Please include arttadnnents i, f the room provided is insufficient.) L Applicant's name 2. Print ownedSigning official Name: Title: Street addn City. Tell Fax: (2So11 owns the propedyx for the property and ift compfienice) 3. Contact person who can answer Name: _ Tell Version 6: Jugs 2009 about 14e propo §qd project: Fax: Email.- 4. Project came (Subdivision, facility, or establislimerrt name - consiskxt with project name on places, moons, tear, apaambiocn etcr 5_ Project location: Street address: City, State, Zip: County: C fct ven Leda,- -- , 6. Date property was, purchased: 7. Directions to site fiom nearest major intersection (Attach an 8 r4 x 11 copy of flee USGS 8. Stream to be impacted by the proposed activity: Stream name (for unnwW straqns laps as "Ul" to the V a,- 47 wn CGS, named stream): 9. Which of the following perroddapprovals vnil be required or have been received already for this project- Isrquiyed: Receivoed: Date ieceivok Permit Type_ CAMA 401 Cedi6catim(404 Permit On-site Washnvater Permit NPDES Permit (including stormwatcr) Non-discharge Permit Water Supply Watershed Variance ErosionSedimentation Control Others (fy) P%rt 2: Pn*osed Arfw W (Please include attachments tf the room provided is in z&ienL) Description of proposed activity [Also, please ate a map of srlficiennt detail (such as a plat cap or site plan in Adobe (pdf) format) to accurately delineate the boundaries of the land to be utilized in carrying out the activity, the location and dimension of any disturbance in the riparian buffers associated with the activity, and the extent of riparian buffers on the land. Include the anew of buffer impact in ft=.: 1 , --- - — /') I Varimoe Ram Fob, Pop 2 Vag 6 July 2009 2. Fill in the table below to identify the square footage of impact to Zones l d: 2 in the pfd riparian buffos and the required mitigation (Fill in the impaeft pardon of dw tnbie, eva if mitigation is not required): Told •Zone 1 exteo& ow 3o feet pa peadkulw fiam the most landward limit of the top of lemk or ac waftd vim; Zone 2 winds an addhk mW 20 feet fiam the edgc of Zone 1. 3. State reasons why this plan for the proposed activity cannot be practically accomplished, reduced or reconfigured to better minimize or eliminate disturbance to the riparian buffers: 4. Description of any best management practices to be used to control impacts wed with the proposed activity (Le., control of nmoff from impervious surfaces to provide Muse flow, re- planting vegetation or enhancement of existing vegetation, etc.). 5. Please provide an explanation of (l) The practical difficulties or h following: I would result from the strict qVicadon ofthis Avon. (2) How these dhTxx l ics or hardships result firm conditions that are unique m the property involved. (3) If economic hardship is the major consideration, then include a specific explanation of the economic hardships and the proportion of the hardship to the entire value ofthe project. Variance Request Form, pale 3 Version 6 July 2009 Pert 8: Chechrist A complete application submittal consists of die following components. hwomphse submicals will be returned to the WbcmmL The c=pHeft variance request submad I be mcamed 90 dsys pmw tb the EMC meeting at which you wish the, request to be heard. Inetaal below to indicate that the necessary information has been provided. Applicant's Item Inidils Original and two copies of the Variance Request Form and the attacliments listed below. • A vicinity map of the project (see Part 1, Item 5) Narrative demonstration of the need for a variance (see Part 2) • A detailed narrative description of stormwater tn seeme t: (see Part 4) • Calculations supporting nitrogen (phosphorus m the TaMlzmhco Baum) loading estimates (see Part 4) • Calculations and re buices supporting nbmgm @hosowrus in >t6w Tar -1'mrko Basin) removal 5om proposed BMPs (see Part 4) • Location and details for all proposed dal stmmwater BMPs (see Pant 4) • Three copies of the applicable Supplement Form(s) and I&M Form(s) for each BMP and/or narrative for each innovative BMP (see Part 4) Three copies of plans and specifies including, Q Development/Project name ® FAgineer and firm Q Legend and north arrow Q Scale (1" = 50' is preferred) Q Revision number & date Q Mean high water line (if applicable) Q Dimensioned propertylpiroject body Q Location map with named streets or NC mate Road numbers Q Original contours, proposed contours, spot elevations, finished floor elevations Q Details of roads, Ong cal41D-sac and curb and 1 0 Footprint of any proposed buildings or otlw sbucMes Q Wedands delineated, or a note on plums d= now exist O Existing drainage (including off - site);, drainage casements. pipe sore, nom' calculations Q Drainage basins delineated 0 Perennial and intermittent streams, ponds, lakes, rivers and estuaries Q Location of forest vegetation along ttlee smims , ponds, lakes, nvess and estuaries Variance Request Form, page 6 Version 6 July 2009 yfrt )zlbNT of wee -rEie LIVE 0� _ F 0 tie ♦ ' ♦ ,� 4. •9 sc. �iP )Ojee55- tw mob MW OH CARo UM awl ilea 3� V - ti ,gu�.wrPpO � oa, - 8f� row �p � t✓ooD •0 47 s,9 ArA Z y� ek,,9f . 30 G�3 y�nl �o v�,TY R-C-1*1 srzY SURVGY F; M JA AIES W. C0NEW AND W FE A UREE/V R, CO ER AI 1VER BEAT D, _ _ unra rU PAR parpf MARCH 15,1999 ALOW_990043 N NON 635 -Z771 �� sT- Port 4: Proposed Impacts and Mitigation Provide a description of how mitigation will be achieved at your site pursuant to 15A NCAC 2B.0242 for the Meuse Basin and 15A NCAC 2B.060 for the Tar - Pamlico Basin. Mbeaffir memaratim is tads mc&md Sm me immstim , be same as a derailed planting plasm to imAWe pbm types, dde aF , dw date efdw afar 4w famifi afi m in dw protected riparian Md a phe sheetslb - SWEMOUNIA H® tint® efdw mbwfnmfi A Rode to buffer rrestosation can be downloaded at the Iblknwing webs bun-JO w affers.adf If paymeml into a buds restoration fiord is how you plan to achieve your mitigation regOuircmeml, then include an amepunce Beser firm the mitigadon bwk you propm to, use sftfing fhy ham flee mitigation credits available for the mitigation nxpzstc& Part 5: Deed Restrictions By your signatrue in Part 6 of this application, you certify that all structural Ammwater BN[Ps required by this variance shall be located in recorded stormwater easements, that the easements will run with the land, that the easements cannot be changed or deleted without concurrence from the State, and that the easements will be recorded prior to the sale of any lot. Part 6: ADDIlCanVS Certification t,�e S " (picot or type name of person listed in Part 1, Item 2), certify that the information included on this permit application form is correct, that the protect will be cored in conformance with the approved plans and that the deed restrictions in accordance with Part 5 of this formyjll be recorded with all required permit conditions. Signature: Date: True: Part 7: Plan Sheets Be sure to include a copy of all of your completed application forum, plan sheers and maps in Adobe (pdf) format on a CD or floppy disk. Variance Request Form, page 5 Version 6 July 2009 Part 3: Stormwater 1. Provide a lion of all best management practices (BIMPs) tilt will be used to control nutrients and sedimenation impacts associated with die proposed activity. Please ensure to include all applicable operation & numW uance agreements and was for the proposed BM NL Also, include dw BMPs on your plan dxxts. 2. Attach a description of how dn%w flow will be maintained derma the protected riparian buffers. Please ensue to mdWe all appbcabk opanom & mookawce agmcnicnts and world for the proposed difftse flaw measure(s).. Also, include the diffuse flow mks) on your plan sheep. 3. What will be the annual nitrogen load contributed by this site after development in pounds per acre p>eryearwv BMf�e (stommwmw � wmfank " etc)? Attach a did pin farad ppraposed structural Amnwifer RNML DfthW Sic of Punt- derdopasmt BW w Final Fat bin drur&W aftozenbaft remprol M&W2 ea6 80699HO bNS& roe WAWMt BMW dkeewys Mfg Me long (ac) (fiWar4r) (W fflWaely) fvm dIndow basin 1 2 3 4 S Torah IY - -N- -- N--- 1- '- - - -- ------ 1-- - - - - -- nsua;n uag'awuwsw was rCjCrCac ra. S Affach cakujQdow and refeTmcm 6 beckrde PbolplorM in dW Tar pon&V Basin 4. Attach all apphcWMe supplement form(s) and Inspection and Mamtenanee (I Form(s) to this completed application. The applicable supplemental form(s) and I& M form(s) for the proposed BMN noted in your application can be downloaded from the following we bete: http : //h2o.enr.state.nc.us/su/bmp forms.htm Variance Request Form, page 4 Version 6 July 2009