Loading...
HomeMy WebLinkAbout20211202 Ver 1_More Info Requested_20210824From: Yankura, Kavlie To: oedenroaer(@vahoo.com Cc: Brown. David W CIV USARMY CESAW (USA); Leslie. Andrea J Subject: Request for Additional Information: Seventh-Day Adventist Church River Bank Stabilization, DWR# 20211202 Date: Tuesday, August 24, 2021 2:44:00 PM Attachments: imaae001.ona Mr. Peden, On August 3, 2021, the Division of Water Resources (Division) received your application requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on hold until the following items are addressed: 1. The drawings provided with the application indicate 300 linear feet of streambank stabilization, but this information is not included on the PCN impact table. Please confirm/indicate the total length of streambank proposed for stabilization activities. [15A NCAC 02H .0506(b)(1)] [15A NCAC 02H .0502(c)] 2. Per General Condition 11.9 of GC 4134, all work must be done "in the dry," so that the flowing stream does not come in contact with the disturbed work area. Therefore, dewatering methods will be necessary to temporarily dewater the stream channel and/or work area during bank stabilization activities. Please describe the proposed method for dewatering or diverting stream flow around the work area during bank stabilization. Examples include: pump around system, jersey barrier, cofferdams, rock berms, or other diversion structures. This work should be conducted during periods of low flow. [15A NCAC 02H .0506 (b)(2)] 3. The construction drawing provided with the application proposes to "establish boulder rocks from riverbed to above high water line." Please indicate if you are proposing to use stone from the riverbed. The removal/dredging of stone from the riverbed for stabilization is not recommended. Boulders/stone associated with the project should be from a different source. [15A NCAC 02H .0506 (b)(2)] Pursuant to Title 15A NCAC 02H .0502(c), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received, the Division will be unable to approve the application and it will be returned. Please contact me if you have any questions. You may provide your response via email or mail to the address below. Thank you, Kaylie Yankura Environmental Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 828 296 4685 office 828 231 9634 mobile kaylie.yankura _ ncdenr.gov DEQ Logo BI Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time.