HomeMy WebLinkAboutNCC210774_NOT Closeout Documents_20210910North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Robeson Project: PNG Line 5 Section 1 HDD-2 River basin: Lumber
Person financially responsible: Piedmont Natural Gas Company, Inc. - Elizabeth Project N: ROBES-2021-014
Lemons, Project Manager
Address: 4720 Piedmont Row Drive, Charlotte, NC 28210
1. Project Location: HWY 20 & McGougan Road, Lumber
Pictures: No Bridge
2. Weather and soil conditions: Clear Soil Workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): None
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: September 07, 2021
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Nicholas Mills Others present:
Date of inspection: August 25, 2021 Time arriving on site: 2:30 PM Time leaving site: 3:00 PM
cc: