Loading...
HomeMy WebLinkAbout20071503 Ver 6_Staff Comments_20130812Strickland, Bev From: Lucas, Annette Sent: Monday August 12, 2013 10:43 AM To: Smith, ChorriL Cc: Dovano.Boyd� Strickland, Bev Subject: 07-1503v0NC55 Roadway Improvements CONDITION Attachments: 07'1503v0NC55 Roadway Improvements COND|T|ONdoox Cherri, I just spoke with Matt Flynn with the Town of Cary and he is taking care of the review for this project (although the SW approval has not been issued yet). Please see the attached condition. Thanks, Annette Annette M. Lucas, PE Environmental Engineer lVCI}ElVR I I}EINLR I BtormwaterPrngracu I85O Mail Service Center, Raleigh, lVC 27699 -1650 (D�ail) 512 N. Salisbury St, Raleigh, NC 27804 1 Q'u Floor (.Looatiora8n Parcels) Phone: (9I9) 807-838I 1 Fax: (919) 807-6494 1 Email: Weboite: A Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 07- 1503v6 NC 55 Roadway Improvements - CONDITION AML comments July 17, 2013 Stormwater Management Plan (SMP) Approval from Local Community Required You are required to provide one copy of the approved SMP, including plan details on full -sized plan sheets, with proof of the Town of Cary's approval. The approved SMP shall be submitted to the DWQ WBSCP Unit (1650 Mail Service Center, Raleigh, NC 27699 -1650) before any impacts authorized in this certification occur. After it is approved and submitted to the Division, the SMP may not be modified without prior written authorization from the Town of Cary. If the SMP is modified in the future, then you shall provide one modified SMP with proof of approval to the DWQ WBSCP Unit prior to the commencement of the modifications.