HomeMy WebLinkAboutNC0020656_Inspection_20140515ATA
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
May 15, 2014
Robert A. Ellis
City of Laurinburg
P.O. Box 249
Laurinburg NC 283530249
SUBJECT: April 14, 2014 Compliance Evaluation Inspection
City of Laurinburg
Leith Creek WWTP
Permit No: NC0020656
Scotland County
Dear Mr. Ellis:
John E. Skvarla, III
Secretary
Enclosed please find a copy of the Compliance Evaluation Inspection form from the inspection conducted
on April 15, 2014. The Compliance Evaluation Inspection was conducted by Mark Brantley,
Environmental Senior Specialist, of the Fayetteville Regional Office. The facility was found to be in
Compliance with permit NC0020656. As a reminder, preservation of the Waters of the State can only be
achieved through consistent NPDES Permit compliance.
Comments
• Facility was clean and neat in appearance at the time of the inspection.
• Log books and maintenance logs were maintained.
• In anticipation of the new industry, FCC, the Division of Water Resources encourages the town to
prepare for the additional wastewater flow. Currently the WWTP is permitted for 4 MGD and
operated at 58% capacity during 2013. Some of the projected flow rates from FCC have been up
to 2MGD and this would put the Leith Creek WWTP at 100% capacity. Please review the
Division of Water Resources rule (attached below) on wastewater treatment capacities and make
plans as required.
15A NCAC 02T .0118 DEMONSTRATION OF FUTURE WASTEWATER TREATMENT
CAPACITIES
In order to insure that treatment, utilization, or disposal systems do not exceed their hydraulic treatment
capacities, no permits for sewer line extensions shall be issued to wastewater treatment systems owned or
operated by municipalities, counties, sanitary districts or public utilities unless they meet the following
requirements:
(1) Prior to exceeding 80 percent of the wastewater. treatment system's permitted hydraulic capacity
(based on the average flow of the last calendar year), the permittee must submit an approvable
engineering evaluation of their future wastewater treatment, utilization, and disposal needs. This
evaluation must outline specific plans for meeting future wastewater treatment, utilization, or disposal
Fayetteville Regional Office
225 Green Street, Suite 714, Fayetteville, North Carolina 28301-5095
Main Phone: 910-433-3300' 1 Internet: http://www.ncdenr.gov .
An Eaual Opportunity \ Affirmative Action Emolover — Made in Dart by Recycled Paoer
needs by either expansion of the existing system, elimination or reduction of extraneous flows, or water
conservation and must include the source(s) of funding for the improvements. If expansion is not
proposed or is proposed for a later date, a detailed justification must be made to the satisfaction of the
Director that wastewater treatment needs will be met based on past growth records and future growth
projections and, as appropriate, shall include conservation plans or other specific measures to achieve
waste flow reductions.
(2) Prior to exceeding 90 percent of the wastewater treatment, utilization, or disposal systems permitted
hydraulic capacity, (based on the last calendar year), the permittee must obtain all permits needed for the
expansion of the wastewater treatment, utilization, or disposal system and, if construction is needed,
submit approvable final plans and specifications for expansion including a construction schedule. If
expansion is not proposed or is proposed for a later date, a detailed justification must be made to the
satisfaction of the Director that wastewater treatment needs will be met based on past growth records and
future growth projections and, as appropriate, shall include conservation plans or other specific measures
to achieve waste flow reductions.
(3) The Director shall allow permits to be issued to facilities that are exceeding the 80 percent or 90
percent loading rates if the additional flow is not projected to result in the facility exceeding its permitted
hydraulic capacity, the facility is in compliance with all other permit limitations and requirements, and it
is demonstrated to the satisfaction of the Director that adequate progress is being made in developing the
needed engineering evaluations or plans and specifications. In determining the adequacy of the progress,
the Director shall consider the projected flows, the complexity and scope of the work to be completed and
any projected environmental impacts.
History Note: Authority G.S. 143-215.3;
Eff. September 1, 2006.,
Please refer to the enclosed inspection report for additional observations and comments. If you or your
staff have any questions, please call me at910-433-3327.
Sincerely,
Mark Brantley
Environmental Senior Specialist
Division of Water Resources
NCDENR
cc: Ricky Todd Odom, ORC
Central Files
Fayetteville Files, J
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water.Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection
1 I N 1 2 1 51 31 NC0020656 1 11 121 14/04/15 117
Type Inspector Fac Type
181 C 1 19I S I 20I 1
Remarks
211IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1lee
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
671 169 7011 1 71 I N 1 721 N 1 "I I 174 71 I I I I I I 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Leith Creek WWTP
Hall St Extension
Laurinburg NC 28352
Entry Time/Date
10:15 AM 14/04/15
Permit Effective Date
09/11/01
Exit Time/Date
12:30 PM 14/04/15
Permit Expiration Date
14/08/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Ricky Todd Odom/ORC/910-291-1718/
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Robert A: Ellis,P0 Box 249 Laurinburg NC 283530249//910-276-9374/9102773633 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit • Flow Measurement • Operations & Maintenance
® Records/Reports
and checklists as necessary)
Self -Monitoring Program • Sludge Handling Disposal ' Facility Site Review
Section D: Summary of Finding/Comments (Attach additional sheets of narrative
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Mark Brantley �j FRO WQ//910-433-3300 Ext.727/
7'7�v� ige. S IC -Pi
Signature of Management Q A Reviewer �e Agency/Office/Phone and Fax Numbers Date
Belinda S Henson ,/ e L(0 , j ,,y "� FRO WQ//910-433-3300 Ext.726/ 6 _ 1 591 ! LI
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page # 1
NPDES yr/mo/day Inspection Type
31 NC0020656 I11 12I 14/04/15 1 17 18I CI
(cont.) 1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Comments
Facility was clean and neat in appearance at the time of the inspection.
Log books and maintenance logs were maintained.
In anticipation of the new industry, FCC, the Division of Water Resources encourages the town to prepare
for the additional wastewater flow. Currently the WWTP is permitted for 4 MGD and operated at 58%
capacity during 2013. Some of the projected flow rates from FCC have been up to 2MGD and this would
put the Leith Creek WWTP at 100% capacity. Please review the Division of Water Resources rule (attached
below) on wastewater treatment capacities and make plans as required.
15A NCAC 02T .0118 DEMONSTRATION OF FUTURE WASTEWATER TREATMENT CAPACITIES
In order to insure that treatment, utilization, or disposal systems do not exceed their hydraulic treatment
capacities, no permits for sewer line extensions shall be issued to wastewater treatment systems owned or
operated by municipalities, counties, sanitary districts or public utilities unless they meet the following
requirements:
(1) Prior to exceeding 80 percent of the wastewater treatment system's permitted hydraulic capacity (based
on the average flow of the last calendar year), the permittee must submit an approvable engineering
evaluation of their future wastewater treatment, utilization, and disposal needs. This evaluation must outline
specific plans for meeting future wastewater treatment, utilization, or disposal needs by either expansion of
the existing system, elimination or reduction of extraneous flows, or water conservation and must include
the source(s) of funding for the improvements. If expansion is not proposed or is proposed for a later date, a
detailed justification must be made to the satisfaction of the Director that wastewater treatment needs will be
met based on past growth records and future growth projections and, as appropriate, shall include
conservation plans or other specific measures to achieve waste flow reductions.
(2) Prior to exceeding 90 percent of the wastewater treatment, utilization, or disposal systems permitted
hydraulic capacity, (based on the last calendar year), the permittee must obtain all permits needed for the
expansion of the wastewater treatment, utilization, or disposal system and, if construction is needed, submit
approvable final plans and specifications for expansion including a construction schedule. If expansion is
not proposed or is proposed for a later date, a detailed justification must be made to the satisfaction of the
Director that wastewater treatment needs will be met based on past growth records and future growth
projections and, as appropriate, shall include conservation plans or other specific measures to achieve
waste flow reductions.
(3) The Director shall allow permits to be issued to facilities that are exceeding the 80 percent or 90 percent
loading rates if the additional flow is not projected to result in the facility exceeding its permitted hydraulic
capacity, the facility is in compliance with all other permit limitations and requirements, and it is
demonstrated to the satisfaction of the Director that adequate progress is being made in developing the
needed engineering evaluations or plans and specifications. In determining the adequacy of the progress,
the Director shall consider the projected flows, the complexity and scope of the work to be completed and
any projected environmental impacts.
History Note: Authority G.S. 143-215.3;
Eff. September 1, 2006.
Page # 2
Permit: NC0020656 Owner - Facility: Leith Creek VVWTP
Inspection Date: 04/15/2014 Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 1n n n
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge DE nnn
Judge, and other that are applicable?
Comment:
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new application? ®n n n
Is the facility as described in the permit? ®n n n
# Are there any special conditions for the permit? n n ® ❑
Is access to the plant site restricted to the general public? ®n n n
Is the inspector granted.access to all areas for inspection? ® nnn
Comment:
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at .grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility classification?
Is a copy of the current NPDES permit available on site?
Yes No NA NE
® nnn
nnn
®nnn
® nnn
Einnn
1%
® nnn
® nnn
®nnn
® nnn
® nnn
® nnn
® nnn
Page # 3
Permit: NC0020656 Owner - Facility: Leith Creek WVVfP
Inspection Date: 04/15/2014 Inspection Type: Compliance Evaluation
Record Keeping
Facility has copy of previous year's Annual Report on file for review?
Comment:
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Comment:
Aerobic Digester
Is the capacity adequate?
Is the mixing adequate?
Is the site free of excessive foaming in the tank?
# Is the odor acceptable?
# Is tankage available for properly waste sludge?
Comment:
Drying Beds
Is there adequate drying bed space?
Is the sludge distribution on drying beds appropriate?
Are the drying beds free of vegetation?
# Is the site free of dry sludge remaining in beds?
Is the site free of stockpiled sludge?
Is the filtrate from sludge drying beds returned to the front of the plant?
# Is the sludge disposed of through county landfill?
# Is the sludge land applied?
(Vacuum filters) Is polymer mixing adequate?
Comment:
Pump Station - Influent
Is the pump wet well free of bypass lines or structures?
Is the wet well free of excessive grease?
Are all pumps present?
Yes No NA NE
nnn
Yes No NA NE
Yes No NA NE
nnn
ginnn
..,nnn
®nnn
.:nnn
Yes No NA NE
Ennn
n nn
nnn
nn
®nnn
n nn
n11
fnnn
nngmn
Yes No NA NE
n nn
nnn
®nnn
Page # 4
Permit: NC0020656 Owner - Facility: Leith Creek VVVVTP
Inspection Date: 04/15/2014 Inspection Type: Compliance Evaluation
Pump Station - Influent
Are all pumps operable?
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
Comment:
Bar Screens
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Comment:
Secondary Clarifier
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately' of the sidewall depth)
Comment:
Aeration Basins
Mode of operation
Type of aeration system
Yes No NA NE
Pnnn
■ nnn
nn®n
■ nnn
Yes No NA NE
n
■
® nnn
■ nnn,
■ nnn
■ nnn
Yes No NA NE
■ nn.n
■ nnn
■ nnn.
® nnn.
■ nnn
■ nnn
® nnn
P nnn
® nnn
■ nnn.
® _nnn
Yes No NA NE
Ext. Air
Surface
Page # 5
Permit: NC0020656 Owner -Facility: Leith CreekVWVfP
Inspection Date: 04/15/2014 Inspection Type: Compliance Evaluation
Aeration Basins
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
•Does the foam cover less than 25% of the basin's surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/I)
Comment:
Oxidation Ditches
Are the aerators operational?
Are the aerators free of excessive solids build up?
# Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?
Is the DO level acceptable?
Are settleometer results acceptable (> 30 minutes)?
Is the DO level acceptable?(1.0 to 3.0 mg/I)
Are settelometer results acceptable?(400 to 800 ml/I in 30 minutes)
Comment:
De -chlorination Yes No NA NE
Type of system ? Gas
Is the feed ratio proportional to chlorine amount (1 to 1)? ® n n n
Is storage appropriate for cylinders? ® n n n
# Is de -chlorination substance stored away from chlorine containers? ® n n n
Comment:
Are the tablets the proper size and type? n n ® n
Are tablet de -chlorinators operational? n n is n
Number of tubes in use?
Comment:
Standby Power Yes No NA NE
Is automatically activated standby power available? 4 ❑ n n
Page # 6
Yes No NA NE
®nnn
®nnn
n❑®n
®nnn
® nnn
® nnn
® nnn
Yes No NA NE
® nnn
® nnn
4nnn
® nnn
® nnn
®nnn
® nnn
® nnn
Permit: NC0020656 Owner - Facility: Leith Creek VWVfP
Inspection Date: 04/15/2014 Inspection Type: Compliance Evaluation
Standby Power
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
Is the generator fuel level monitored?
Comment:
Laboratory
Are field parameters performed by certified personnel or laboratory?
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/-1.0 degrees?
Comment:
Disinfection -Liquid
Is there adequate reserve supply of disinfectant?
(Sodium Hypochlorite) Is pump feed system operational?
Is bulk storage tank containment area adequate? (free of leaks/open drains)
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de -chlorination?
Comment:
Influent Sampling
# Is composite sampling flow proportional?
Is sample collected above side streams?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)?
Is sampling performed according to the permit?
Yes No NA NE
■nnn
®nnn
n nn■
■ nnn
n nn■
® nnn
Yes No NA NE
®nnn
E n n n.
®nnn
® nnn
. nnn
® nnn
Yes No NA NE
® nnn
■ nnn
T n n n
®nnn
® nnn
T n n n
Yes No NA NE
nn■n
T n n n
T n n n
® nnn
■ nnn
■ nnn
Page # 7
Permit: NC0020656 Owner - Facility: Leith Creek WWTP
Inspection Date: 04/15/2014 Inspection Type: Compliance Evaluation
Influent Sampling Yes No NA NE
Comment:
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type representative)?
Comment:
Upstream / Downstream Sampling
Yes No NA NE
ginnn
®nnn
Ennn
® nnn
® nnn
® nnn
Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, and sampling location)? ® Q 0 n
Comment:
Page # 8