Loading...
HomeMy WebLinkAboutNC0020656_Inspection_20140515ATA NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor May 15, 2014 Robert A. Ellis City of Laurinburg P.O. Box 249 Laurinburg NC 283530249 SUBJECT: April 14, 2014 Compliance Evaluation Inspection City of Laurinburg Leith Creek WWTP Permit No: NC0020656 Scotland County Dear Mr. Ellis: John E. Skvarla, III Secretary Enclosed please find a copy of the Compliance Evaluation Inspection form from the inspection conducted on April 15, 2014. The Compliance Evaluation Inspection was conducted by Mark Brantley, Environmental Senior Specialist, of the Fayetteville Regional Office. The facility was found to be in Compliance with permit NC0020656. As a reminder, preservation of the Waters of the State can only be achieved through consistent NPDES Permit compliance. Comments • Facility was clean and neat in appearance at the time of the inspection. • Log books and maintenance logs were maintained. • In anticipation of the new industry, FCC, the Division of Water Resources encourages the town to prepare for the additional wastewater flow. Currently the WWTP is permitted for 4 MGD and operated at 58% capacity during 2013. Some of the projected flow rates from FCC have been up to 2MGD and this would put the Leith Creek WWTP at 100% capacity. Please review the Division of Water Resources rule (attached below) on wastewater treatment capacities and make plans as required. 15A NCAC 02T .0118 DEMONSTRATION OF FUTURE WASTEWATER TREATMENT CAPACITIES In order to insure that treatment, utilization, or disposal systems do not exceed their hydraulic treatment capacities, no permits for sewer line extensions shall be issued to wastewater treatment systems owned or operated by municipalities, counties, sanitary districts or public utilities unless they meet the following requirements: (1) Prior to exceeding 80 percent of the wastewater. treatment system's permitted hydraulic capacity (based on the average flow of the last calendar year), the permittee must submit an approvable engineering evaluation of their future wastewater treatment, utilization, and disposal needs. This evaluation must outline specific plans for meeting future wastewater treatment, utilization, or disposal Fayetteville Regional Office 225 Green Street, Suite 714, Fayetteville, North Carolina 28301-5095 Main Phone: 910-433-3300' 1 Internet: http://www.ncdenr.gov . An Eaual Opportunity \ Affirmative Action Emolover — Made in Dart by Recycled Paoer needs by either expansion of the existing system, elimination or reduction of extraneous flows, or water conservation and must include the source(s) of funding for the improvements. If expansion is not proposed or is proposed for a later date, a detailed justification must be made to the satisfaction of the Director that wastewater treatment needs will be met based on past growth records and future growth projections and, as appropriate, shall include conservation plans or other specific measures to achieve waste flow reductions. (2) Prior to exceeding 90 percent of the wastewater treatment, utilization, or disposal systems permitted hydraulic capacity, (based on the last calendar year), the permittee must obtain all permits needed for the expansion of the wastewater treatment, utilization, or disposal system and, if construction is needed, submit approvable final plans and specifications for expansion including a construction schedule. If expansion is not proposed or is proposed for a later date, a detailed justification must be made to the satisfaction of the Director that wastewater treatment needs will be met based on past growth records and future growth projections and, as appropriate, shall include conservation plans or other specific measures to achieve waste flow reductions. (3) The Director shall allow permits to be issued to facilities that are exceeding the 80 percent or 90 percent loading rates if the additional flow is not projected to result in the facility exceeding its permitted hydraulic capacity, the facility is in compliance with all other permit limitations and requirements, and it is demonstrated to the satisfaction of the Director that adequate progress is being made in developing the needed engineering evaluations or plans and specifications. In determining the adequacy of the progress, the Director shall consider the projected flows, the complexity and scope of the work to be completed and any projected environmental impacts. History Note: Authority G.S. 143-215.3; Eff. September 1, 2006., Please refer to the enclosed inspection report for additional observations and comments. If you or your staff have any questions, please call me at910-433-3327. Sincerely, Mark Brantley Environmental Senior Specialist Division of Water Resources NCDENR cc: Ricky Todd Odom, ORC Central Files Fayetteville Files, J United States Environmental Protection Agency EPA Washington, D.C. 20460 Water.Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection 1 I N 1 2 1 51 31 NC0020656 1 11 121 14/04/15 117 Type Inspector Fac Type 181 C 1 19I S I 20I 1 Remarks 211IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1lee Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 671 169 7011 1 71 I N 1 721 N 1 "I I 174 71 I I I I I I 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Leith Creek WWTP Hall St Extension Laurinburg NC 28352 Entry Time/Date 10:15 AM 14/04/15 Permit Effective Date 09/11/01 Exit Time/Date 12:30 PM 14/04/15 Permit Expiration Date 14/08/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Ricky Todd Odom/ORC/910-291-1718/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Robert A: Ellis,P0 Box 249 Laurinburg NC 283530249//910-276-9374/9102773633 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit • Flow Measurement • Operations & Maintenance ® Records/Reports and checklists as necessary) Self -Monitoring Program • Sludge Handling Disposal ' Facility Site Review Section D: Summary of Finding/Comments (Attach additional sheets of narrative (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Mark Brantley �j FRO WQ//910-433-3300 Ext.727/ 7'7�v� ige. S IC -Pi Signature of Management Q A Reviewer �e Agency/Office/Phone and Fax Numbers Date Belinda S Henson ,/ e L(0 , j ,,y "� FRO WQ//910-433-3300 Ext.726/ 6 _ 1 591 ! LI EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page # 1 NPDES yr/mo/day Inspection Type 31 NC0020656 I11 12I 14/04/15 1 17 18I CI (cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Comments Facility was clean and neat in appearance at the time of the inspection. Log books and maintenance logs were maintained. In anticipation of the new industry, FCC, the Division of Water Resources encourages the town to prepare for the additional wastewater flow. Currently the WWTP is permitted for 4 MGD and operated at 58% capacity during 2013. Some of the projected flow rates from FCC have been up to 2MGD and this would put the Leith Creek WWTP at 100% capacity. Please review the Division of Water Resources rule (attached below) on wastewater treatment capacities and make plans as required. 15A NCAC 02T .0118 DEMONSTRATION OF FUTURE WASTEWATER TREATMENT CAPACITIES In order to insure that treatment, utilization, or disposal systems do not exceed their hydraulic treatment capacities, no permits for sewer line extensions shall be issued to wastewater treatment systems owned or operated by municipalities, counties, sanitary districts or public utilities unless they meet the following requirements: (1) Prior to exceeding 80 percent of the wastewater treatment system's permitted hydraulic capacity (based on the average flow of the last calendar year), the permittee must submit an approvable engineering evaluation of their future wastewater treatment, utilization, and disposal needs. This evaluation must outline specific plans for meeting future wastewater treatment, utilization, or disposal needs by either expansion of the existing system, elimination or reduction of extraneous flows, or water conservation and must include the source(s) of funding for the improvements. If expansion is not proposed or is proposed for a later date, a detailed justification must be made to the satisfaction of the Director that wastewater treatment needs will be met based on past growth records and future growth projections and, as appropriate, shall include conservation plans or other specific measures to achieve waste flow reductions. (2) Prior to exceeding 90 percent of the wastewater treatment, utilization, or disposal systems permitted hydraulic capacity, (based on the last calendar year), the permittee must obtain all permits needed for the expansion of the wastewater treatment, utilization, or disposal system and, if construction is needed, submit approvable final plans and specifications for expansion including a construction schedule. If expansion is not proposed or is proposed for a later date, a detailed justification must be made to the satisfaction of the Director that wastewater treatment needs will be met based on past growth records and future growth projections and, as appropriate, shall include conservation plans or other specific measures to achieve waste flow reductions. (3) The Director shall allow permits to be issued to facilities that are exceeding the 80 percent or 90 percent loading rates if the additional flow is not projected to result in the facility exceeding its permitted hydraulic capacity, the facility is in compliance with all other permit limitations and requirements, and it is demonstrated to the satisfaction of the Director that adequate progress is being made in developing the needed engineering evaluations or plans and specifications. In determining the adequacy of the progress, the Director shall consider the projected flows, the complexity and scope of the work to be completed and any projected environmental impacts. History Note: Authority G.S. 143-215.3; Eff. September 1, 2006. Page # 2 Permit: NC0020656 Owner - Facility: Leith Creek VVWTP Inspection Date: 04/15/2014 Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 1n n n Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge DE nnn Judge, and other that are applicable? Comment: Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new application? ®n n n Is the facility as described in the permit? ®n n n # Are there any special conditions for the permit? n n ® ❑ Is access to the plant site restricted to the general public? ®n n n Is the inspector granted.access to all areas for inspection? ® nnn Comment: Record Keeping Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Is the ORC certified at .grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Is a copy of the current NPDES permit available on site? Yes No NA NE ® nnn nnn ®nnn ® nnn Einnn 1% ® nnn ® nnn ®nnn ® nnn ® nnn ® nnn ® nnn Page # 3 Permit: NC0020656 Owner - Facility: Leith Creek WVVfP Inspection Date: 04/15/2014 Inspection Type: Compliance Evaluation Record Keeping Facility has copy of previous year's Annual Report on file for review? Comment: Flow Measurement - Effluent # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Comment: Aerobic Digester Is the capacity adequate? Is the mixing adequate? Is the site free of excessive foaming in the tank? # Is the odor acceptable? # Is tankage available for properly waste sludge? Comment: Drying Beds Is there adequate drying bed space? Is the sludge distribution on drying beds appropriate? Are the drying beds free of vegetation? # Is the site free of dry sludge remaining in beds? Is the site free of stockpiled sludge? Is the filtrate from sludge drying beds returned to the front of the plant? # Is the sludge disposed of through county landfill? # Is the sludge land applied? (Vacuum filters) Is polymer mixing adequate? Comment: Pump Station - Influent Is the pump wet well free of bypass lines or structures? Is the wet well free of excessive grease? Are all pumps present? Yes No NA NE nnn Yes No NA NE Yes No NA NE nnn ginnn ..,nnn ®nnn .:nnn Yes No NA NE Ennn n nn nnn nn ®nnn n nn n11 fnnn nngmn Yes No NA NE n nn nnn ®nnn Page # 4 Permit: NC0020656 Owner - Facility: Leith Creek VVVVTP Inspection Date: 04/15/2014 Inspection Type: Compliance Evaluation Pump Station - Influent Are all pumps operable? Are float controls operable? Is SCADA telemetry available and operational? Is audible and visual alarm available and operational? Comment: Bar Screens Type of bar screen a.Manual b.Mechanical Are the bars adequately screening debris? Is the screen free of excessive debris? Is disposal of screening in compliance? Is the unit in good condition? Comment: Secondary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately' of the sidewall depth) Comment: Aeration Basins Mode of operation Type of aeration system Yes No NA NE Pnnn ■ nnn nn®n ■ nnn Yes No NA NE n ■ ® nnn ■ nnn, ■ nnn ■ nnn Yes No NA NE ■ nn.n ■ nnn ■ nnn. ® nnn. ■ nnn ■ nnn ® nnn P nnn ® nnn ■ nnn. ® _nnn Yes No NA NE Ext. Air Surface Page # 5 Permit: NC0020656 Owner -Facility: Leith CreekVWVfP Inspection Date: 04/15/2014 Inspection Type: Compliance Evaluation Aeration Basins Is the basin free of dead spots? Are surface aerators and mixers operational? Are the diffusers operational? Is the foam the proper color for the treatment process? •Does the foam cover less than 25% of the basin's surface? Is the DO level acceptable? Is the DO level acceptable?(1.0 to 3.0 mg/I) Comment: Oxidation Ditches Are the aerators operational? Are the aerators free of excessive solids build up? # Is the foam the proper color for the treatment process? Does the foam cover less than 25% of the basin's surface? Is the DO level acceptable? Are settleometer results acceptable (> 30 minutes)? Is the DO level acceptable?(1.0 to 3.0 mg/I) Are settelometer results acceptable?(400 to 800 ml/I in 30 minutes) Comment: De -chlorination Yes No NA NE Type of system ? Gas Is the feed ratio proportional to chlorine amount (1 to 1)? ® n n n Is storage appropriate for cylinders? ® n n n # Is de -chlorination substance stored away from chlorine containers? ® n n n Comment: Are the tablets the proper size and type? n n ® n Are tablet de -chlorinators operational? n n is n Number of tubes in use? Comment: Standby Power Yes No NA NE Is automatically activated standby power available? 4 ❑ n n Page # 6 Yes No NA NE ®nnn ®nnn n❑®n ®nnn ® nnn ® nnn ® nnn Yes No NA NE ® nnn ® nnn 4nnn ® nnn ® nnn ®nnn ® nnn ® nnn Permit: NC0020656 Owner - Facility: Leith Creek VWVfP Inspection Date: 04/15/2014 Inspection Type: Compliance Evaluation Standby Power Is the generator tested by interrupting primary power source? Is the generator tested under load? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreement with a fuel vendor for extended run on back-up power? Is the generator fuel level monitored? Comment: Laboratory Are field parameters performed by certified personnel or laboratory? Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? Incubator (BOD) set to 20.0 degrees Celsius +/-1.0 degrees? Comment: Disinfection -Liquid Is there adequate reserve supply of disinfectant? (Sodium Hypochlorite) Is pump feed system operational? Is bulk storage tank containment area adequate? (free of leaks/open drains) Is the level of chlorine residual acceptable? Is the contact chamber free of growth, or sludge buildup? Is there chlorine residual prior to de -chlorination? Comment: Influent Sampling # Is composite sampling flow proportional? Is sample collected above side streams? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is sampling performed according to the permit? Yes No NA NE ■nnn ®nnn n nn■ ■ nnn n nn■ ® nnn Yes No NA NE ®nnn E n n n. ®nnn ® nnn . nnn ® nnn Yes No NA NE ® nnn ■ nnn T n n n ®nnn ® nnn T n n n Yes No NA NE nn■n T n n n T n n n ® nnn ■ nnn ■ nnn Page # 7 Permit: NC0020656 Owner - Facility: Leith Creek WWTP Inspection Date: 04/15/2014 Inspection Type: Compliance Evaluation Influent Sampling Yes No NA NE Comment: Effluent Sampling Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Comment: Upstream / Downstream Sampling Yes No NA NE ginnn ®nnn Ennn ® nnn ® nnn ® nnn Yes No NA NE Is the facility sampling performed as required by the permit (frequency, sampling type, and sampling location)? ® Q 0 n Comment: Page # 8