Loading...
HomeMy WebLinkAboutSW6210903_Supplement-EZ Form_20210914SUPPLEMENT-EZ COVER PAGE FORM5LOADED I=i0I11told IZIV] 0i7ir_ 114121 1 JProject Name Carolina Crossing 2 JPrqject Area (ac) j 44.436 3 Coastal Welland Area (ac 4 Surface Water Area (ac)_-_ 5 is this project Hig h or Low Density?_ _ _ Hi I 6 Does this project use an off -site SCM? No 'COMPLIANCE WITH 02H .10084) 7 Width of vegetated setbacks provided (feet} _ NIA NIA 8 Will the vegetated setback remain vegetated? 8 If BUA is prapDsed in the setback, does it meet NCAC D2H.1003 4 c-d ? No 10 -Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMS: 11 Infiltration System Bioretention Cell TT _ --— 1 12 0 13 Wet Pond Stormwater Wetland 0 14 0 15 _ Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) _ _ Treatment Swale 0 21 0 22 ❑ Pond 0 0 23 StormFilter 24 Silva Cell 0 _ — 25 Ba filter _ 0 26 IFilterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Carlo Pardo, PE 28 Organization: Triangle Site Design, PLLC 29 Street address: J 4004 Barrett Drive, Suite 101 30 City, State, Zip: Raleigh, NC 27609_ 31 Phone numbers : 919-553-6570 32 EmaiL cpardoagtrianglesitedesign.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowiedge and belief, true, accurate, and complete; and that the engineering plans, specifications operation and maintenance agreements and other supporting information are consistent with the information provided here. ``,,`t�t44f1111I1f1/1/77! .••`•� �` A ROl J > d FES§0 9 . � 4-e SEAL 051571 y Signature of Designer Date DRAINAGE AREAS 1 Is this a high dens4y pUo ect? Yes 2 If so, number of drainage areaslSCMs _ 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORM5t0ADEb DRAItVAGE AREA INFORMATION M Entire Site 4 Type of SCM - Infiltration Basin 5 Total drainage area (sq ft 1935619 sf 1504315 6 Onsite drainage area Jsq ft 1935619 sf 1504315 7 Offsite drainage area (sq ft 8 Total BUA in project (sq ft 395036 sf 395036 sf 9 New BUA on subdivided lots (subject to permitting) 1 (sq ft 1 0 h11 New eUA not on subdivided lots (subject to ermittin s Offslte BUA (sq tt 12 Breakdown of new BUA not on subdivided lots: Parkin SN ft Sidewalk (sq ft) 20006 sf 20008 sf Roof (sq ft 256000 sf 256000 sf Roadway s ft 119030 sf 119030 sf Futures ft Other, please specify in the comment box below (sq ft 13 1 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on�� subdivided lots (sq f1 15 Existing BUA that will remain (not subject to ermittin s ft) 16 Existing BUA that is already permitted (sq ft j' 17 Existing BUA that will be removed (sq ft 4028 sf 4028 sf 118 Percent BUA 26% 19 Design storm inches 1.0 in 20 Design volume of SCM (cu it) 35896 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION r k 22 Please use this spare to provide any additional information about the drainage area(s), _ INFILTRATION SYSTEM �1 Drainage area number i 1 2 ,Minimum required treatment volume (ru ft) T 358c 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 1 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (KV or enter "Vertical' for trenches)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No _ 7 Are the inlets, outlets, and receiving stream protected from eroston 1 D- ear storm)? Yes 8 Is there an overflow ar bypass for inflow volume in excess of the desi n volume? Yes 9 lWhat is the method for clewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drains a easement co m ply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? NIA 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed U an NC licensed rotessional? Yes NFILTRATION SYSTEM Mnr FROM 02H _1A51 18 Proposed slope of the subgrade surface (%) — 0% 19 jAre terraces or bafflesprovided? No 20 IType of pretreatment: Forebay I Sods Data 21 Was the soil investigated in the footprint and at the elevation of the Infiltrations stem? Yes 22 SHWT elevation (fmsl) 326.00 23 Depth to SHWT per soils report (in) 168.0o 24 Ground elevation at boring in soils report (fmsl) 340.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? NIA 26 Soil infiltration rate (inlhr) 4.00 27 Factor of safer (FS) (2 is recommended): 2.00 Elevations 29 Bottom elevation (fmsl) 333 ft 30 Storage elevation (fmsl) 335. ft 31 Bypass elevation (fmsl) 338.1 ft For Basins Oni 32 Bottom surface area ft2 27255 ft 33 1 Storage elevation surface area (ft) 31810. tt For Trenches Oniv 34 Length ft 35 Width (ft) 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total length of perforated piping 39 Slone type, if applicable 40 Stone porosity(% 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? VOiumeSlDraWdown 44 1 Design volume of SCM (cu ft) 35896 cf 45 ITime to draw down (hours) 72 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): Infiltration 1 11:04 AM 8/2/2021