HomeMy WebLinkAboutNCG020201_Inspection Report_20210518 Compliance Inspection Report
Permit:NCG020201 Effective: 05/06/21 Expiration: 06/30/21 Owner: Vulcan Construction Materials LLC
SOC: Effective: Expiration: Facility: Vulcan Construction Materials-Clear Creek
County: Mecklenburg 14135 Brooks Mill Rd
Region: Mooresville
Charlotte NC 28227
Contact Person:John Basso Title: Phone:704-545-5687 Ext.70
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 05/18/2021 Entry Time 10:OOAM Exit Time: 12:00PM
Primary Inspector:Jeffrey A Chandler Phone: 704-663-1699
Secondary Inspector(s):
Lily C Kay
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Mining Activities Stormwater Discharge COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
£10 Z 96ed
'a}is auiw aqj 10 aajawuad ay;6uole siaseal pue siaumopuel Mau
ql!m pa}epdn aq of paou sdew pue al!suo does aql 6uipuajns fuessaoau si 6uidoeNesnoH IeJau90 -aoueildwoo ui si euiW
:tiewwnS uoiloodsul
aui;noa :;lslgjol uoseaa uoilenlen3 eouelldwoO:edAjL uonaedsul LZOZ/8L/90 :83ea uolloedsul
O--I sleualelry uollorulsuoo ueo{nn:Amoe:j-jauAko LOZOZOJON :lluJJed
permit: NCG020201 Owner-Facility:Vulcan Construction Materials LLC
Inspection Date: 05/18/2021 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑
#Does the Plan include a General Location(USGS)map? E ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? 0 ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? N ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑
#Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑
#Does the Plan include a BMP summary? 0 ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan(SPRP)? N ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑
#Does the facility provide and document Employee Training? 0 ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑
#Is the Plan reviewed and updated annually? E ❑ ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑
Comment:
Qualitative Monitorin4 Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? N ❑ ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑
Comment:
Permit and Outfalls Yes No NA NE
#Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
#Were all outfalls observed during the inspection? E ❑ ❑ ❑
#If the facility has representative outfall status,is it properly documented by the Division? ❑ ❑ E ❑
#Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ 0 ❑
Comment:
Page 3 of 3