Loading...
HomeMy WebLinkAbout20130819 Ver 1_401 Application_20130813d `o�ot W Ar-11RpG > 4 C? Y C If C R R.I `to ) T�' el `� l -- _ - - y. 20 1 3 0 8 1 8 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ❑ Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu flee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes [lo 1g. Is the project located in any of NC's twenty coastal counties. if yes, answer 1 h below- ❑ Yes No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes 2. Project Information fth 2a. Name of project: 2b. County: �„ ° G 2c. Nearest municipality / town: 13 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: eze LAY IAI RA6 19 21A& 3b. Deed Book and Page No. 3c. Responsible Party (for LLC_if applicable): 3d. Street address: e. 3e. City, state, zip: 6 A 01 m 9 3f. Telephone no.: 39. Fax no., 3h. Email address: t Page 1 of 10 PCN Form — Version 1.4 January 2009 1 4. Applicant InfbmwMon (if different from owner) 4a. Applicant is: Agent ❑ Other, spedfy: 4b. Name: 4c. Business name (if applicable): 4d. Street address: �7 S 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 6. AgenMonsultent Intonation (If applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: • ' `' . £= .a> page 2 of 10 B. Project Information and Prior Project N- Mori, 1. Property identification 1 a. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): I Latitude: Longitude :' 1c. Property size: acres; Z Surface Waters 2a. Name of nearest body of water to proposed project:' 2b. Water Quality Classification of nearest receiving water. 2c. River basin: uere 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the pro ject at the time of this application: 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: 3e. Describe the overall project in detail, including the type of equipment to be used: do 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the Yea ❑ No ❑Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? preliminary (Zv Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Omer 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation., 6. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Y� 'N"' o Unknown 5b. If yes, explain in detail according to 'help file" instructions: 6. Future Project Plans 6a. is this a phased project? ❑ Yes No 6b. if yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 VX C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams — tributaries d Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No VV2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (fit) 3g• Impact length (linear feet) S1 - Choose one S2 - Choose one S3 - Choose one S4 - Choose one S5 - Choose one S6 - Choose one 3h. Total stream and tributary Impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose O4 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? Yes [] No if yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? [Meuse [] Tar - Pamlico 0 Catawba [] Randleman [] Other. 6b. Buffer Impact number — Permanent (P) or Temp2rary M 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet ) 6g. Zone 2 impact (square feet 61 - e Yesmo B2 - J Yes/No B3 - 917-4 YeslNo B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 61. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. -T�41-- 4GeCGN ?O C+4 n(mTE tT 60QL� J ®u L-4 Ts � is V�'-T f u T41 rIO 9IT I'D V AT TiA6 1?,Ef Ae- OF T -A E 1 b. Specifically describe measures taken to avoid or minimize the proposed Impacts through construction techniques. ,Te p1ZQ- (__TtOtiJ *, SILT MAQA�M'�, T+}, Ex1S-nf3b sOD V'J1tA -9C$ MAI o T A W SO 1-0 TN 6 W 4 L F X T S ►1" \N 1 LL GV p'f 1- V 2. Com e satory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ []Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank 0 Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete If Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In4leu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: b. Complete If Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.4 January 2009 6. Buffer Mitigation (State Regulated_ Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes No 6b. if yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6C: Reason for impact 6d. Total impact (square feet) Multiplier 6e: Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund)., 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified Ea4e ❑ No within one of the NC Ri 'an Buffer Protect Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. '5 01P \tq 13 L Nth I To -T 'A 1 ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c. if this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase 11 ❑ NSW 3b. Which of the following locally- implemented sormwater management programs USMP apply (check all that apply): Water Supply Watershed Other. 3c. Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑ No attached? 4. DWQ Stormwater Program Review Coastal counties HOW 4a. Which of the following state - implemented stormwater management programs apply ORW (check all that apply): Session Law 2006 -246 Other. 4b. Has the approved Stormwater Management Plan with proof of approval been []Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? []Yes No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑Yes ❑ No use of public (federal/state) land? ib. If you answered ° yes° to to above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑Yes ❑ No (North Carolina) Environmental Policy Ad (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site In violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolates %bband Rules (15A NCAC 2H .1300), DWQ Surface VOater or Watiand Standards, []Yes QNo or Riparian Buffer Rules (15A NCAC28.0200)? 2b. Is this an after- the -fad permit application? []Yes [ (No 2c. if you answered "yes° to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. VM t* W*d Mased on pad aW MMmaMy 060pated f e} result in ❑Yes [21 I4o additional development, which could impact nearby downstreaality? m er quality? 3b. if you answered "yes° to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered *no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject fbc friY. Page 9 of 10 PCN Form — Version 1.4 January 2009 M 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? Yes ❑ No 5b. Have you checked with the USFWS concerning Endangered Species Act []Ye r. s No ❑ 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? S. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodpiain? Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? S ear, -D- 'nzc C'I ^^ 1�.7 • E=L(-CA Ct `� Applicant/AgenYs Printed Name . - go,- plicanUAgent's Signature if (Agenft soneture Is vabd only Nan authorization letter from ffwappUcwt is ided. I -a l— 13 Date Page 10 of 10 NOTES: 1.SURVEY COMPLETED 7- 17 -13. N 27HIS SURVEY WAS PERFORMED WITHOUT BENEFIT OF A TITLE REPORT. 3. ADJOINING OWNERS TAKEN FROM DEEDS OF RECORD, AND TAX RECORDS. 4. THIS PROPERTY MAY BE SUBJECT TO EASEMEN75 OR OTHER ENCUMBRANCES THAT A DETAILED TITLE SEARCH MAY DISCLOSE 5. ALL MEASUREMENTS SHOWN ARE HORIZONTAL GROUND DISTANCES. 6. AREA CALCULATED BY COORDINATES 4� ATE NSF EL GEND: a Aq.•r IKH J ESCOBAR PF IRON PIPE FOUND LOT 163 NIF NO IRON FOUND o. DB8707 PG481 E PROPERTY LINE y BM1994 PG791 R/W RIGHT OF WAY REID#0209334 E ELECTRIC BOX M ` * LIGHT POLE R S 38'46'59" E a CABLE PEDESTAL 7.55' m TELEPHONE PEDESTAL VICINITY MAP SANITARY MANHOLE (NOTTO SCAM ® L CATCH BASIN a CO TRO Swale / CO NER P S 20' SEWER SS4\ EASEMENT i flared \ E 74 0 0 end �� z y N section P u WA EN LOT 152 DB9021 PG98 l BM1995 PG954 ` 70 C\ / / / �°/ \ \ �' o < REID#0219852 / aZ 48" RCP // proposed AREA OF NEW CONSTRUCTION Bg / deck ZONE 2= 498 SO FT DECK m AREA OF EXISITING HOUSE IN F a �Tri?o� // propose ZONE 2= 23 SO FT a 4:/ screen CO d porch TOTAL AREA IN 00 / 2 STORY 7S ZONE2= 521 SO FT a v Qb py BRICK N F 20' DRAINAGE -e} MOORS = o EASEMENT LOT 154 =o DB8094 PG328 3 BM1995 PG954 z 11A41 201 �o, REID#0219854 S <0 LOT AREA= a a CONTRO PF / 20,011 SO. FT. a CORN R 0.459 ACRES 1 NI F v N gy2,14b W a R/ GI ,C 1106 PF `� c (so' PV BARS SAN S, 3; ° E Rim 0 U. CONCRETE NAIL SET AT THE < H GRAPHIC SCALE APPARENT INTERSECTION OF GREYFRIARS LANE & °L F 0 20 40 80 ` MORELAND COURT. g a � V y ` 0 IN FEET) �' LOT 153 WYNDFALL S/D i inch = 40 it. DB14914 PG2368 BM1995 PG954 �W 9 A; < PIN# 0751.12 -85 -6463 U< a In REID# 0219853 y g F —31-13 ADDRESS: 105 GREYFRIARS LANE m`'° �N CA 00 CARY NC, 27518 <z o 2 <�7 CURVE TABLE a F SEAL CURVE I LENGTH I RADIUS I CHORD DIRECTION DELTA L - 3967 Cl EL37 24L71 EL37 S 72.4075' E 5.4'0' LAB xa 9244K ��� I, Anthony S. DiBono, certify that this plat was drawn under my direct supervision from an yOIVY S ��0 actual u0� y made under my supervision. that the ratio of precision as calculated Is p Witness my original signature, registration number and seal this 31st day of July, 2013. 14053.01 FOR THE FIRM I BOUNDARY ZONE, INC. SHEET FIRM NUMBER: C -3534 Anthony S. Dona, PLS L -3967 I OF I APEX PLOT PLAN LOT 153 WYNDFALL S/D gpu pq APEXNO THDRIVE. INAri23 PREPARED for AMY & SEAN BARCLAY ZO(IQI(1C u.owmFra+�s�mnces 235 PEACHTREE ST. NE. STE.400 WHITE OAK TOWNSHIP APEX: (919) 363 -9226 ATLANTA, GEORGIA 30303 FAX' (919) 363.9228 BUFORD WAKE COUNTY, NORTH CAROLINA - 7/31/13 W W W BOUNDARYZONE COM 4195 SOUTH LEE ST., STE.1 BUFORD. GEORGIA 30319 EXIST PHOTO 3D GROUND REAR LEFT BARCLAY RESIDENCE PORCH ADDITION I STEPHEN CLUGGISH, A.hft a