Loading...
HomeMy WebLinkAboutSW8030720_Attachment C Mod History_20210914Attachment C - Permitting History Courthouse Bay Regional Stormwater Pond Permit No. SW8030720 Project / Drainage Built -Upon Area (BUA), sf Existing/ Approval Permit Action BIMS Description of the Changes Area (sf) Buildings/ Streets Parking Sidewalks Other Previously Off -site Future Total Percent Date Version Lots Permitted BUA 12/12/2003 Original 1.0 N/a 3,391,103 765,209 518,200 261,360 76,520 1,621,289 47.8% Approval Phase 1- Removal of a strip of land and associated overhead 451,321 201,376 - - 652,697 32.7% steam line (the stream line is being relocated). Pond 1,995,400 Future Phase - 313,888 316,824 261,360 76,520 968,592 69.4% 1/26/2005 Major 1.1 surface area, storage volume, depth, and outlet structures Modification to remain unchanged, however pond is being regraded to 1,395,703 Entire Pond - 765,209 518,200 261,360 76,520 1,621,289 47.8% accommodate the relocated steam line. 3,391,103 Demolition of existing concrete storage area and concrete drainage swale. Construction of dining facility Current - 560,900 201,376 762,276 34.6% P1030 (19,765 sf), 160 space parking (73,363 sf), 2,203,003 8/28/2007 Major 1.2 service entry/loading dock, and sidewalks (16,451 sf). Modification Net increase of 109,579 sf of BUA. Increase in the drainage area to the pond from 45.81 ac to 50.57 ac. Build -Out - Pond to be expanded.This mod was revised/corrected in 3,391,103 765,209 518,200 261,360 76,520 1,621,289 47.8% 2010. Construction of minor building P1256 (2,060 sf), 10 Current - space parking (3,044 sf), and sidewalk improvements 2,203,003 21,712 3,044 539 113 652,697 - 192,590 870,695 39.5% 12/20/2010 Major 1.3 (net increase of 539 sf). Total net increase of 5,643 sf of Build -Out - Modification BUA. Future BUA allocation "maxed-out" based on current pond design. 3,391,103 765,209 518,200 261,360 76,520 1,621,289 47.8% Construction of a new building BB330A (753 sf) and Current - 22,465 3,044 539 113 652,697 - 191,837 870,695 39.5% 10/17/2013 Minor 1 4 construction of new building BB 125A (0 sf since 2,203,003 Build -Out - Modification constructed over existing BUA). Net increase of 753 sf of BUA (taken from future allocation). 3,391,103 767,919 261,360 592,010 1,621,289 47.8% Construction of a gazebo near building BB328 (875 sf). Current - 23,340 76,407 16,990 113 652,697 - 190,962 960,509 43.6% 12/7/2015 Minor 1.5 Net increase of 875 sf of BUA (taken from future 2,203,003 Build -Out- 767,919 261,360 592,010 1,651,289 48.7% Modification allocation). 3,391,103 Current- 23,340 76,407 16,990 113 652,697 - 190,962 960,509 43.6% 2,203,003 Potential 7/13/2020 Renewal 2.0 Permit renewal. Build -Out- 767,919 261,360 592,010 1,651,289 48.7% 3,391,103 Demolition of several buildings (SBB46, SBB50D, SBB52B, BB50A, BB50B, BB50C, BB52, BB110, Current - BB111, and BBS111, 26,779 sf), a concrete pad near 22,670 48,227 19,055 2,816 769,547 98,194 960,509 43.6% building SBB52B (5,094 sf), a steam vault near building 2,203,003 BB52 (64 sf), and a gravel road on the P1312 site (8,281 9/14/2021 Minor 2.1 sf). Recieving BUA credit for the 2014 removal of the Modification water treatment plant (27,164 sf). Construction of building P1312 (59,707 sf), 125 space parking (78,572 Potential sf), sidewalks (19,055 sf), and bus drop off (2,816 sf). Build -Out - 767,919 261,360 592,010 1,621,289 47.8% Net increase of 92,768 sf of BUA (taken from future 3,391,103 allocation). Page 1 of 1