HomeMy WebLinkAboutNCG03 Comments from Daimler Trucks North America Morman, Alaina
Subject: RE: [External] Comment on NCG03 Stormwater General Permit DRAFT
From: lindsev.speed@daimler.com <lindsey.speed@daimler.com>
Sent: Monday,June 14, 2021 2:14 PM
To: Clark, Paul <paul.clark@ncdenr.gov>
Subject: [External] Comment on NCG03 Stormwater General Permit DRAFT
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Good afternoon.
Daimler Trucks North America would like to provide a public comment regarding draft NPDES Stormwater General
Permit No. NCG030000 for Metal Fabrication.
Pertaining to Part B-12 for the draft permit, we propose that the language be updated to clearly allow training to be
tracked through electronic systems.The draft permit states, "The training shall be documented by the date, signature,
and printed or typed name of each employee trained."The requirement for signature may imply that a hand written
signature is required. We maintain records for many regulatory and skills based training requirements for each of our
thousands of employees.We have found that the most accurate and efficient way to manage these records is through
electronic databases.The quality of the training itself is not effected by the records tracking system.
We would like to offer the proposed edit for the permit language for Part B-12.
"The training shall be documented by the date, signature or digital certification, and printed or typed name of
each employee trained."
We believe that this change will allow industries to utilize the most current, accurate, and efficient systems for managing
training of their employees.
Please let me know if there is any additional information that I can provide.
Best,
Lindsey Speed Nichols, P.E.
Corporate Environmental Engineer
Cell: 704-775-6875
DAIMLER
If you are not the addressee, please inform us immediately that you have received this e-mail by mistake, and delete it.
We thank you for your support.
2