Loading...
HomeMy WebLinkAboutNCC202601_NOT Closeout Documents_20210908North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Guilford Project: R-4707 Duke Utilities Relocation River basin: Cape Fear Person financially responsible: Duke Energy Carolinas - Justin LAmbrose Project #: GUILF-2020-040 Address: 2500 Fairfax Road, Greensboro, NC 27407 1. Project Location: US 29 & Reedy Creek Pkwy, Greensboro Pictures: No 2. Weather and soil conditions: 80's, Clear, Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? N/A Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Don Smith Title: Environmental Consultant Inspection report: Sent Report Date given/sent: September 03, 2021 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Turney Others present: Arnold Baldwin, NCDOT Date of inspection: September 02, 2021 Time arriving on site: 1:00 PM Time leaving site: 2:00 PM