Loading...
HomeMy WebLinkAbout20211362 Ver 1_401 Application_20210913 Staff Review Form NORFH CA.,i0:INA Environmenfrr!QvoGly Updated September 4,2020 Staff Review Does this application have all the attachments needed to accept it into the review process?* 6* Yes r No ID#* Version* 1 20211362 Is this project a public transportation project?* (' Yes r No Is this a DOT r Yes 6' No project?* Reviewer List:* Kevin Mitchell:eads\rkmitchell Select Reviewing Office:* Asheville Regional Office-(828)296-4500 Submittal Type:* 401 Application Does this project require a request for payment to be sent?* Yes C' No How much is (' $240.00 owed?* r $570.00 Project Submittal Form Please note:fields marked with a red asterisk *below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type:* r For the Record Only(Courtesy Copy) ✓ New Project r Modification/New Project with Existing ID ✓ More Information Response ✓ Other Agency Comments ✓ Pre-Application Submittal ✓ Re-Issuance\Renewal Request r Stream or Buffer Appeal Pre-Filing Meeting Information Before submitting this form please ensure you have submitted the Pre-Filing Meeting Request Form as we will not be able to accept your application without this important first step.The Pre-Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a)"At least 30 days prior to submitting a certification request,the project proponent shall request a pre-filing meeting with the certifying agency"and in accordance with 40 C.F.R. Section 121.5(b)(7),and (c)(5)all certification requests shall include documentation that a pre-filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request.Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre-Filing Meeting Request here: DWR Pre-Filing Meeting Request Form.pdf 50.6KB Date for Meeting Request 8/9/2021 ID# Version Project Contact Information Name: Jeff Golladay Who is submitting the inforrration? Email Address: jeff@cwenv.com Project Information Project Name: Black Mountain Home for Children,Youths,and Families Is this a public transportation project? a Yes ✓ No Is the project located within a NC DCM Area of Environmental Concern (AEC)? ✓ Yes r No r Unknown TIP#: WBS#: (Applies to DOT projects only) County(ies) Buncombe Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document BlkMtnHomeForChildren NWP 14&PJD Application- 4.45MB FINAL DRAFT 9.9.21.pdf Only pdf or kaz files are accepted. Describe the attachments or comments: 404 permit application and PJD submitted to the Corps on 09/13/21. Sign and Submit fJ By checking the box and signing box below, I certify that: • I,the project proponent, hereby certifies that all information contained herein is true,accurate, and complete to the best of my knowledge and belief. • I,the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the online form. Signature: Submittal Date: Is filled in automatically.