Loading...
HomeMy WebLinkAbout20211360 Ver 1_Shoreline Stabilization_20210907ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality k State of North Carolina Department of Environment Quality Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 09-2020 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service Paul Wojoski DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski DWR — 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request to this application. Date of Pre -filing Meeting Request: ¶ /3 /.20.)-1 (required) DWR ID # Version (if applicable) RECEIVED SEP 7 2021 A. Applicant Information [15A NCAC 02H .0502(a DEQ-WATER RESOURCES 401 & BUFFER PERMITTING 1. Owner Information Name: Mailing Address: Telephone Number: E-mail Address: Christopher Shane Earnhardt 3190 Old Mountain Road Trinity, NC 27370 336-669-6849 Fax Number: searnhardt@northstate.net North Carolina Department of Environmental Quality ! Division of Water Resources 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatorv/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: N/A Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: B. Project Information [15A NCAC 02H .0502(a) & ( ] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Montgomery Nearest Town: New London Lake/ river/ ocean adjacent to property: Badin Lake Property size (acres): 0.31 acres Subdivision name or site address (include phase/lot number): Lot 25, Dixie Shores, 216 N. Shoreline Dr., New London Directions to site - please include road names and numbers, landmarks, etc.: NC Hwy 49 to Badin Lake Road, L on Blaine Road, R on Charlotte Dr., property is on the left side of road. Latitude (in decimal degrees) 35.28.4042 Longitude (decimal degrees) 80.05.1671 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): House under construction in subdivision development 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize an eroding shoreline and protect it from further erosion. 7. Will work be conducted from land? From water? n 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 106 sq. ft. Temporary impacts in square feet: None 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 324 sq. ft. Temporary impacts (temporary clearing, construction corridor) in square feet: 265 sq. ft. 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): No trees will be removed to complete the shoreline stabilization. 11. Signature By signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this_CWA certifi atior)/requesi.within the applicable reasonable period of time Owner/Agent's Signature* [15A NCAC 02H .0502(f)] Date *Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the FuII Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level Shoreline Lake lAt Full Pond/ Normal Water evell . To E O Z Side View 0 Lake (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level "litre-ne _~ 2 ft. x 150 ft. addition) clearing • If necessary Existing Dock 30ftx 7 ft EOMPL Plan View 3ftx150ft Below full pond/ NWL ft xl5o ft Abo:e full pond/ NWL E 3 ft. below full pond water level 4 ft. above full pond water level *if necessary 1 I I Existing bank 10 ft. bank height Side View 2 ft. additional clearing NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Christopher Shane Earnhardt Lot 25, Dixie Shores STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 53 LF of proposed shoreline stabilization measures. Detail 3 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 8 on NCDEQ Form SSGP 09-2020) Area of Impact = Shoreline Length x Depth* x Slope =53'x1'x2 = 106 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 9 on NCDEQ Form SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 15 IF of Shoreline = 2 ft. Above Normal Pool Estimate 20 LF of Shoreline = 3 ft. Above Normal Pool Estimate 18 LF of Shoreline = 4 ft. Above Normal Pool Area of Impact = Length x Height x Slope = ( 15' x 2' x 2) + ( 20' x 3' x 2) + ( 18' x 4' x 2) = 60 + 120 + 144 = 324 sq. ft. Impact From Construction Above Shoreline Stabilization Assume 5 ft. Wide Zone Area of Impact = 53' x 5 ft. = 265 sq. ft. Total Area of Impact Above Normal Pool Level = 589 sq. ft. ./` / ./ /1' /%1/ -..,. / i / i / / I./ / 1' SD —24 111\‘'% / c.i.vi,C 7 / DS-26 / of , „ .... , ,.. „ , ... , / ..,.... / N. /, 9590 -,..„ ....,... , ,4 ... DS27 IN .14A) (. I 7A) VEGETATION AND EROSION CONTROL FABRIC /j / 3 CLASS 2 RIP RAP 2 EROSION CONTROL FABRIC TYPICAL CONDITIONS • 36" TO 72" ERODED CUT • WAVE EXPOSURE EXISTING GRADE Varies 2 to 4 ft. Assume 1 ft. LAKE BOj-oM — — FOR: LOCATION: RESERVOIR: CHRISTOPHER EARNHARDT LOT 25, DIXIE SHORES BADIN LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: n MODERATE RIP RAP STABILIZATION DETAIL 3 1 1 • ”".."46., .711X-A ;\ L • • 8/i0/2021 216 N Shoreline Dr - Google Maps Go gie Maps 216 N Shoreline Dr >t, Cal North Slate Club Go gle Map data 12021 2000 ft 7E' Ac P https://www.google.com/maps/place/216+N+Shoreline+Dr,+New+London,+NC+28127/©35.4859312,-80.07458,14z/data=k1m5l3m4l1s0x8854806e21... 1/1 Contact Name * Contact Email Address* Project Owner* Karen8aIdtnrin..Agent for Shane Earnhardt karen: bakJwin[Aeaglecreekre. com Eagle Creek Renewable Energy Project Name* Narrows Reservoir Project County* Montgomery Owner Address:* ;rep?Ackirss 21 t N Shoreline Drive A($dmss Une 2 ay Sale t r?rupx:(*f 12:40; New London North Carolina Rrrai; Zip ala DA ntry 28127 United. Stales Is this a transportation project?* C Yes a No. Type(s) ofapproval sought from the DWR: ✓ 401 Water Quality Certification- r 401 Water Quality Certification - Regular Express. ✓ Individual Permit r Modifcation f7'Shoreline Stabilization Does this project have an existing project ID#?* CYes r'No Do you know the name of the staff member you would liketo`request a meeting with? N% Please give a:brief project description below and Include location information.* Shoreline. Stabilization in accordance viith Cube Hydro's. Shoreline Management. Plan. By digitally signing below, I certify that 1 have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the .Clean Water Act Section 401 Certification Rule. • 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project'sthirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting Is necessary. You will receive notification when the thirty -day deck has expired, and ybu can subrnit:an application. Signature* Subniittal [sate 8/3/2021